HomeMy WebLinkAboutReview Checklist TOWN OF YARNIOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. 6 3 Lot 9� Zone of Contribution: In Out Acreage /S OOe y^
-1-
/ d/ Commercial: Residential:
Street: 7,3 Coo/; � , . -
Village: Floor Plan: 1.- # Bedrooms: --
Owner: ---
Owner: : Installer: J L. N EEC A v cC�; o w
Phone:
Phone:
:
Builder
Address:: Engineer: 4� r-r-;n,y'f'o p
P
Phone:
Phone:
1. Required#of copies received N/A YES NO
2. Date of soils exam and percolation test not older than 2 years - ✓
3. 4-5 ft of naturally occurring pervious material; above water table
4. Foundation 2 ft above highpoint of road t/ --
g H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.: I -
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.: J I ��
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: -
9. Leaching minimum 100 ft from wetlands Var.: /
10. Leaching minimum 150 ft from drinking we11/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.: /
12. System meets all other setback requirements Var.: \` v
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil (A;B horizons)or 5' removal I
16. Proposed contours are suitable
17. System meets slope requirements-min. 1/8", %"preferred
__18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee 1�
20. Sewage is under 10,000 gpd for parcel
21. No garbage disposal v
22. System adequately sized for its intended use
23. Minimum 6"stone or compacted below tank and dbox I
24. Manhole covers within 6"of grade, pump chamber cover to grade
25. Inspection port on plastic chambers/leach field / ----
1 26. Electrical permit for pump chamber/Separate meter for duplexes �----
27.Pump system-2"line,weep hole,check valve, tee in dbox, pump size
28. Septic tank/pump chamber to be factory waterproofed ,../�
29. Vent provided if leaching below 3 feet,under driveway/parking
30. Buoyancy calculations for tank/pump chamber G/
31. Engineer to inspect and certify soils: wall: commercial: _/
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic,groundwater
34.Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted_ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd I �j
37. Check area lots for groundwater/Label groundwater in Assessor's Map 17
Plan reviewed by: 4'--2 O --2 r> G 0101
1