HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
C, SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. 6 d Lot 470 Zone of Contribution: In Outs/ Acreage /�8j /O o
�a ( � -� � Commercial: Residential:�/
Street: 4 �,D 0 Q K
Village: Floor Plan: 1..../ # Bedrooms 0
Owner: Installer: /3 /3
Address: Phone:
Phone:
Builder: Engineer: Jam/ 4 ,
Address: �,,/ N r,
Phone:
Phone:
1. Required#of copies received N/A YEL.S NO
2. Date of soils exam and percolation test not older than 2 years - /
3. 4-5 ft of naturally occurring pervious material, above water table Y� -` - -
4. Foundation 2 ft above highpoint of road "�
g H.P.: Fnd: Var.: � � ----
5. Water line 10 ft from septic components Var.: C/
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.: J
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: I I //
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: - I 1./11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: �/
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above ad-. water or bottom of test hole Var.:
15. System not in top or subsoil (A,B horizons)or 5' removal
16. Proposed contours are suitable
17. System meets slope requirements- min. 1/8", W'preferred
_18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21. No garbage disposal
22. System adequately sized for its intended use /-- ---
23. Minimum 6"stone or compacted below tank and dbox I /
24. Manhole covers within 6"of grade, pump chamber cover to grade
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes t./
27. Pump system-2"line,weep hole,check valve, tee in dbox, pump size e...---
28. Septic tank/pump chamber to be factory waterproofed /
29. Vent provided if leaching below 3 feet,under driveway/parking
30. Buoyancy calculations for-tank/pump chamber
31. Engineer to inspect and certify soils: - wall: commercial: I 6./
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33. H-20 loading is subject to vehicular traffic, groundwater r/ -
slirf
34.Title V Application and permit fee, installer signature - j
35. Foundation footing min. 2 feet above adjusted ground water for new house ✓
36. Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map I
Plan reviewed by: .4,o .C.--------_,
6o:o;