Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH C, SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 6 d Lot 470 Zone of Contribution: In Outs/ Acreage /�8j /O o �a ( � -� � Commercial: Residential:�/ Street: 4 �,D 0 Q K Village: Floor Plan: 1..../ # Bedrooms 0 Owner: Installer: /3 /3 Address: Phone: Phone: Builder: Engineer: Jam/ 4 , Address: �,,/ N r, Phone: Phone: 1. Required#of copies received N/A YEL.S NO 2. Date of soils exam and percolation test not older than 2 years - / 3. 4-5 ft of naturally occurring pervious material, above water table Y� -` - - 4. Foundation 2 ft above highpoint of road "� g H.P.: Fnd: Var.: � � ---- 5. Water line 10 ft from septic components Var.: C/ 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: J 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: I I // 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: - I 1./11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: �/ 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above ad-. water or bottom of test hole Var.: 15. System not in top or subsoil (A,B horizons)or 5' removal 16. Proposed contours are suitable 17. System meets slope requirements- min. 1/8", W'preferred _18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21. No garbage disposal 22. System adequately sized for its intended use /-- --- 23. Minimum 6"stone or compacted below tank and dbox I / 24. Manhole covers within 6"of grade, pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes t./ 27. Pump system-2"line,weep hole,check valve, tee in dbox, pump size e...--- 28. Septic tank/pump chamber to be factory waterproofed / 29. Vent provided if leaching below 3 feet,under driveway/parking 30. Buoyancy calculations for-tank/pump chamber 31. Engineer to inspect and certify soils: - wall: commercial: I 6./ 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic, groundwater r/ - slirf 34.Title V Application and permit fee, installer signature - j 35. Foundation footing min. 2 feet above adjusted ground water for new house ✓ 36. Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map I Plan reviewed by: .4,o .C.--------_, 6o:o;