Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 72 Lot 9- / Zone of Contribution: In_ OutAcreage 131 '/' ' Commercial: Residential: Street: / ; 8 C4_-t4`(Li Coker,ib --- Village: Floor Plan: Bedrooms: Owner: Installer: Fit v'f ' Address: Phone: Phone: Builder: Engineer: Cleo -Cc ', ►Address: xr ►rCi+'J r sr✓-tom. Phone: Phone: N/A YES NO 1. Required#of copies received 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table --- - 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: d -i - - 5. Water line 10 ft from septic components Var.: I 6. Benchmark indicated and shown-NGVD if near wetlands C�7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: I -€..Z.- 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: e. - 12. System meets all other setback requirements Var.: \` 13. Uses adjustment for maximum high groundwater Var.: `/ 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil (A,B horizons)or 5' removal I 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", %"preferred 18. System meets breakout requirements PVC liner: Wall: I i.19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21. No garbage disposal 22. System adequately sized for its intended use v 23.Minimum 6"stone or compacted below tank and dbox I /./. 24. Manhole covers within 6"of grade, pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27. Pump system-2"line,weep hole,check valve, tee in dbox, pump size o••• • 28. Septic tank/pump chamber to be factory waterproofed r� 29. Vent provided if leaching below 3 feet,under driveway/parking 30. Buoyancy calculations for lank/pump chamber G/ 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ' 33. H-20 loading is subject to vehicular traffic,groundwater 34.Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd 1 137. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: _ �L co.o; 1Y-eA 1 - 3- 3