Loading...
HomeMy WebLinkAboutCOC request939 main street ne 6a yarmouth port mass 02675 5/3/2023 FROM: down cape engineering, inc civil engineers & land surveyors TRANSMITTAL HEATHER CORNELL HCORNELL@DOWNCAPE. COM tel.(508)3624541 fax (508) 362-9880 TO: YARMOUTH CONSERVATION RE: 22-357 MCGUINNESS CERTIFICATE OF COMPLIANCE 111 WIMBLEDON DRIVE WEST YARMOUTH MAP 22 PARCEL 41 DEP 834754 METHOD OF DELIVERY: IN PERSON PLEASE FIND ATTACHED A REQUEST FOR A CERTIFICATE OF COMPLIANCE AT 111 WIMBLEDONE DRIVE IN WEST YARMOUTH INCLUDING: • YARMOUTH CHECKLIST • ENGINEER'S STATEMENT • WPA FORM 8A • SITE PHOTOS • FILING FEE CC: FILE CONSERVATION OFFICE All filings must be made on Town of Yarmouth forms. All applications must be submitted two weeks prior to the next scheduled Conservation Commission meeting. Refer to Meeting Schedule. Failure to follow the Administrative Checklist shall result in an Administrative Incomplete Application and will not be scheduled for a Public Hearing. Contact the Conservation Office if you need assistance. / 1 complete hardcopy of the COC application, plan/sketch, and other supporting information to the Conservation Office - mailed to or dropped off at Town Hall. ./ 1 complete pdf of the COC application, plan/sketch, and other supporting information emailed to bdirienzoyarmouth.ma. us. J Statement from Engineer and/or stamped As -Built plan if required under the Order of Conditions to be included with both original and pdf application. Refer to 310 CMR 10.05(9)(d). Refer to issued Order of Conditions*. J Local filing fee. Refer to Fee Schedule and include property address in memo. Make check payable to "Town of Yarmouth" Yarmouth Conservation Commission • 1146 Route 28 •South Yarmouth, MA 02664-4492 Tel. (508)-398-2231 Ext. 1288 •Fax (508)-398-0836 • TTD# (508) 398-2231 • bdiriezno cryarmouth.ma.us Nev 0/2022 939 main street it 6a yarmouth port mass 02675 land court surveys structural design site planning sewage system designs inspections permits down cape engineering, inc civil engineers & land surveyors Apri128, 2023 Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 Ref: #111 Wimbledon Drive, West Yarmouth (SE83-1754) Dear Commission Members: tel. (508) 362-4541 fax (508) 362-9880 Daniel A. Ojala, P.E., P.L.S. Arne H. Ojala, P.E., P.L.S. Daniel E. Gonsalves, P.E., S.E Craig J. Ferrari, E.I.T., S.E. In June of 2006, the Commission issued an Order of Conditions for the above - referenced site, for the construction of a new single family dwelling on a previously developed site. A site visit was made in April of 2023 and photographs representative of the site are attached. The site was found to be in good standing and the work has long been completed. Drywells were not installed for the roof runoff, but the downspouts discharge into the naturally sandy subsoils for infiltration and no evidence of surface runoff towards the wetland area was observed. It was also noted that the driveway is currently constructed of asphalt pavement but is pitched to drain away from the wetland resource area. This is to certify, to the best of my knowledge and belief, that the work was perforrned in substantial compliance with the approved plan and Order of Conditions. We respectfully request the issuance of a Certificate of Compliance. We respectfully request the issuance of a Certificate of Compliance. Thank you for your consideration. Very truly yours, Daniel A. Ojala, PE, PLS Down Cape Engineering, Inc. Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. Upon completion of the work authorized in an Order of Conditions, the property owner must request a Certificate of Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. Massachusetts Department of Envi Mronmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 8A — Request for Certificate of Compliance 83-1754 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Project Information 1. This request is being made by: Garech McGuinness Name 111 Wimbledon Drive Mailing Address West Yarmouth MA 02673 City/Town State Zip Code Phone Number 2. This request is in reference to work regulated by a final Order of Conditions issued to: Wiles Architects Applicant 6-13-2006 Dated 3. The project site is located at: 12,865 S.F.± Street Address 22 Assessors Map/Plat Number DEP File Number West Yarmouth City/Town 41 Parcel/Lot Number 4. The final Order of Conditions was recorded at the Registry of Deeds for: Garech McGuinness Property Owner (if differei Barnstable County Certificate (if registered land) 5. This request is for certification that (check one): 21161 Book ® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doc •• rev. 5/29/14 Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A — Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. Project Information (cont.) DEP He Number: Provided by DEP 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office- for-your-city-or-town.html). wpaform8a.doc •• rev. 5/29/14 Page 2 of 2 7T TIC OF q at S Ara\ 0 ; IV, iIT If I i d i �Z.7plv'I .. Tel OR lull on wo low.. __ wls i � r. �►I� 'll Ilill Jillllllll � III f �I 7�Ii-1fIIIffIII_ = 6 MUMMM SMOMM r. I i A MrAwn ■ ■OWMW a i ' MMUa n� • Aw�dl -S�s :tom