Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: AM /, LOT /3/ Date of Subdivision App a Street J S�, _,/N6-� Z-17►i�- Zone of Contri do Out Village //J./, 2 m 0i Commercial Residential Owner: n .e3 ,,?-- /ZS Installer -4 ' �.�' - 77C__. 77E- c'6cf4 Builder: Engineer i(_2,--z� 7e "S Jz", N/A YES NO 1. Required number of copies received. )(' 2. Date of soils exam and percolation test not older than 2 years. x 3. 4 feet of naturally occurring pervious material, above water table(new construction) xi 4. Foundation 2 feet above high point of fronting road for new construction. 5. Water availability letter from Water Department for new construction. X 6. Benchmark indicated and shown - NGVD if near wetlands. XC 7. Building sewer does not.exit center of house. 8. Septic tank a minimum of 10 feet from house and deck. .3( 9. Leaching a minimum of 20 feet from house and 10 feet from deck. X 10. Leaching a minimum of 100 feet from wetlands. X 11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. X 12. System meets all other setback requirements. V 13. Uses adjustment for maximum high groundwater. i\ 14. Leaching 4 -5 feet above adjusted water table_or bottom of test pit. 4 1, a / . >.' 15. System not in top or subsoil c r 5 foot removal x 16. Proposed contours are suitable. y 17. System meets slope requirements - min. 1/8", 1/4" preferred. X 18. System meets breakout requirements - peastone elevation carried out 15 feet minimum. x 19. Specified tee sizes are proper. gas baffle on outlet tee. X 20:Sewage flow under 10,000 gpd for parcel. X 21. No garbage disposal. 22: System adequately sized for its intended use. 21. Minimum 6" stone or mechanically compacted below the tank and d-box. X 24. Manhole covers within 6" of grade - septic tank and pump chamber. 25. Electrical permit for pump chamber. 26. Pump system - 2" line, weep hole, check valve, sanitary in d-box. alarm on separate circuit. X 27. Septic tank and pump chamber to be Factory waterproofed. '< 28. Vent provided if leaching below 3 feet or under driveway or parking. >` 29. Engineer to inspect and certify : a. clay removal b. wall construction schedule c. commercial system = 30. Engineer and Land Surveyor stamp and signature. 31. H2O loading when system subject to vehicular traffic. N` 32. Title V application and fee signed by a licensed installer. X 33. Foundation footing 2 feet above adjusted water table. 34. Lot subdivided prior to July 31, 1986 - Nitrate Loading. 35. Subdivided prior to April 7, 1989 - Phosphorus Zone 300'. Plan reviewed by: ' `.