HomeMy WebLinkAbout296 Station Ave plan 21
)R
1"HUNE C
® I�
C
E
12 TB4 CP 1 N
101%1.lvel 8
tNGUAGE SIM
201 SIM7 A7.04 !
10 SIM
\— EXISTING
6 FEC
5.04
__.—_ ---.— ---_____.___` i
p`
341
U JAIL,
I,
GIRLS BOYS
TOILET TOILET
GT-4 — BT-4 it
I
t
VESTIBULE;
t i 341
t €
t
t i
i 1
t r
3
IT"
I
3 ..s
MATCHLI F
E
FIRST FLOOD. PLAN - PART F 300 WIN
SCALE: 1/8" =1'-0. 1957 BUILDING
EX319—
t
t
E
I
t
t f
t i f
_ 9
SCRAPE, PRIME AND PLA TER\
EXISTING COLUMNS BY 09900,
T P. --o
t -
t
t
t
REFER FO CML DRAWINGS
FOR A ITIONAL INFORMATION 1
5:04 ON RA P AND STAIR. LINE OF CANOPY ABOVE
`"" _
6 _
A2:03
a
1
RAILING BY 05500 REFER LINE OF CONCRETE PAD
TO CIVIL DRAWINGS
SCRAPE, PRIME AND
PAINT EXISTING COLUMNS
BY 09900, TYP
`mot ;y
SIM
RAILING BY 05 00 'REFER
TO C�VIL DRAWINGS
� I
r
10 �
4.01 TYP
:f
REViAT10NS>
f
1. CONTRACTOR SHALL PROVIDE STAGING THROUGHOUT
ZEFER TO SHEET A7.01 FOR APPLIANCE LEGEND.
THE AUDITORIUM SEATING AREA TO FACILITATE OVERHEAD
V N *- 2-
UTILITY AND CEILING FINISH WORK FROM BELOW.
'ATCH, GRID SMOOTH, FILL AND/OR LEVEL ALL EXISTING
2. CONTRACTOR SHALL INSTAII TI lsfPORARY PLANKING
3S AT LOCATIONS OF REMOVED PARTITIONS, REFER TO
IN TRUSS SPACE TO FACILITATE a"CESS AND INSTALLATION
IM FINISH SCHEDULE FOR SCHEDULED FINISH.
OF WORK ABOVE THE EXISTING CEILING TO REMAIN,
3ATCH AND REPAIR ALL WALLS AT REMOVED PLUMBING
REMOVE UPON COMPLETION.
URES, INFILL EXISTING OPENINGS WfFH PARTITIONS
I 3. AFTER SEATS FAVE BEEN REMOVED AND CARPET HAS
ISTRUCTED TO MATCH OPENINGS.
BEEN REMOVED (Bt` CONTRACTOR) PATCH THE CONCRETE
'ATCH FLOOR AS REQUIRED AT LOCATION OF TRENCHING
FLOOR THROUGHOUT. RE —SLOPE PER 13540, REFER TO
IOTH LEVEL TO MATCH ADJACENT FLOOR,
STPUCTURAL DRAWINGS. PROVIDE NEW SMOOTH SURFACE
SUBSTRATE FOR APPLICATION OF NEW CARPET AND PAINT.
'ROVIDE TOP AND BOTTOM LANDING RAILING EXTENSIONS
EXPOSED CONCRETE FLOOR THROUGHOUT. REINSTAI:'-
ALL REPLACEMENT RAMP AND STAIR LANDINGS.
EXIST NG
____l
�NOTES
,AU ITORIUM NOTES
�� HLINE I
C 1
22 SIM
7.05
HISTORY
CLASSROOM
401
CP
1.- (34) EXISTING LOCKERS, (2) ,'vrW ADA LOCKERS I,
`)SET
4I�t a
fznl rvinrw^ i nniirMn 1
GAFJIIIYV !_V1.�f1C11J
CP
i
PS
ENGLISH
CLASSROOM
402
SIM
MATCHLINE
Irt
480.A
WALL PROTECTION MAT
661.A
TELESCOPING BLEACHER MODIFICATI
661.B
BLEACHER GUARDRAILS
,930.A
FIRE HOSE CABINET
OOO.J
FIN TUBE RADIATOR AND COVER
000Y
IRE ALARM ITEM
KEYNOTES
KEY PLAN
SCALE: NTS
NORTH
UV,
SYMMES MAIN[ ae_MC$• 41 ASSOCIATES
1000 Massachusetts Avenue
Cambridge, Massach! ISe s 02138
617.547.5400 Fax 617.354.5758
OWNER REVIEW
NAME DATE
0 12/02/03 CONSTRUCTION DOCUMENTS
NO. DATE DESCRIPTION
ISSUE LOG _
= CLOUDED CHANGE —
DENNIS YARMOD I H
REGIONAL NIGH SCHOOL
296 STATION AVENUE
SOUTH YARMOUTH, MASSACHUSLTTS 0266t
FIRST FLOOD PLAN
PAIN F
I _ _
j SCALE 1,1811 = VO" _
DRAWN BY JLL
CHECKED BY
PROD. ARCH, P ENIGR. PH
PROD. MGR. JGS
JOB NG02095 00
fl SYMMES, MAiNI & MGKEE ASSOCIATES, INC. 2003
0
J