HomeMy WebLinkAbout286 Old Main St plan 8Cross Section 3
1/4in=1ft
U
red cedar shingles, 5/8"
ply, 2 x 10 rafters @ 16" (1) 1.15"xl 1.675" u
oc, H2.5 clips to plates, LVL ridge o
spray foam insul.
3 pitch, membrane roof o=
(D o
0-
(2) 1.75"0.25" o I )
match existing +/- g plaster ceiling, confirm N
pitch -� collar ties/beams LYL o Q Z
N O
l � d ❑
built in bench, confirm details 1^t15 I I Ad
D01 existing bedroom # 2 (3) 2xb headers 7' 6" be
W03 rebuilt wall yy2p
9 pitch W10 N I
I outdoor Exterior walls: match existing wall
I I sink or height, w.c. siding, housewrap, `Z
YY10 upper storage, kitchen I I storage Er1 /2" ply, foam insul., 2 x 6 studs
lower storage, bedroom I @ 16" oc,1 /2" gyp brd w/ plaster Q
finish ear bump out,
hed ceiling z
BATH ru 2x10 joists @ 16" o/c, mid -span blocking
E 15-2 1 /2"
6 BEDROOM existing/no j
2 change c
# 2 N existing/no
d (1) 1.15"xl1.875" LVL ridge change _ Cross Section 4
- - 1/4in=1ft
c
G
DINING
cathedral or high vault N 54 W
O N Q w
u u
' .5 +/- pitch
T 3" G curved vault
O
Q
O
L
Y402 , „ D01 Y412 1^t12 -C
11 -9 (2) 1.15"x11.815" LVL ri 4 existing dining o
2T - --____ _ __-__ U.� 0
raze and replace r room, preserve old L
bedroom #2 12 LIVING
plaster if possible
C: co
C CO < (N cf)f)
1 st Floor -\\A OF b},qs
1 /4 in = 1 ft MA HEW 1D1/7/2022
Welch Prop 2 SHAUN Gm
o PETERS
STRUCTURAL
A 9No. 57000Q Note, this area is part of the
90 �GISTEQ`� ��' as noted
FFsslONALEN�'\� older building that is to be lifted
with new foundation and floor SHEET:
11/07/2022 - frame repaired as needed.
Pg-7