Loading...
HomeMy WebLinkAbout286 Old Main St plan 9�l 1 st Floor 1/4in=1ft Welch Prop 2 11/07 �P1k OF MASS MATTHEW gcyG SHAUN Co PETERS " STRUCTURAL A9N0.57000� Q '9pF FGISTER� Fss/ONAL ENG� V� Note, this area is part of the older building that is to be lifted with new foundation and floor frame as needed. Hayden Building Movers Inc. will be responsible for the lifting, floor frame repairs and new foundation portion of the project. Separately, the attic area floor is to be removed. Matt Peters P.E. of Peters Engineering LLC is supervising the structural repairs and modifications of the existing and new framing. Additional details forthcoming as the building is lifted and framing exposed. extend existing roofline over new back addition ■ red cedar shingles, existing rafters w/ new 2 x rafters as needed for reinforcement, foam insul.,1/2" gyp brd w/ plaster finish. (2) 1.75"x11.815" LVL ridge Cross Section 5 1/4in=1ft I I existing attic floor to be removed I I existing living room Exterior walls xisting walls, M clipboard Sidi , housewdap, t- 1/1" ply, foa i sul., 2 x Ituds as needed for reorcement,l1/2" gyp brd w/ pl s er finish . -T l framing repairs as needed I Ir— red cedar shingles, existing rafters w/ new 2 x rafters as needed for reinforcement, (2) 1.15"x11.615" LVL ridge foam insul.,1/2" gyp brd w/ plaster finish. Cross Section 6 1/4in=1ft I (2) 1.75"x1.25" LVL existing attic floor to be removed I I existing ceilinc new bFim w/ posts �u�aport Exterior walls: e i ting walls,) clapboard siding ousewra�, existing roof I I 1 /2" ply, foam ir s Al., 2 x sts as --0- _ I I need. c! for reinf r ement,'! to I I gyp Ord w/ plaster finish f II I I I IE I 15'-3" II new foundation and floor 0 m O O N Ur O 0- N O N 02 Z O a-o > '� O Q � � ca 6 t! %— O O � O1 c cB C O O O Q -f U O U E N0 Q N fn DATE: 1 I77120 22 SCALE: as noted SHEET: Pg-8