HomeMy WebLinkAbout286 Old Main St plan 9�l
1 st Floor
1/4in=1ft
Welch Prop 2
11/07
�P1k OF MASS
MATTHEW gcyG
SHAUN
Co PETERS
" STRUCTURAL
A9N0.57000� Q
'9pF FGISTER�
Fss/ONAL ENG�
V�
Note, this area is part of the older building that is
to be lifted with new foundation and floor frame
as needed. Hayden Building Movers Inc. will be
responsible for the lifting, floor frame repairs and
new foundation portion of the project.
Separately, the attic area floor is to be removed.
Matt Peters P.E. of Peters Engineering LLC is
supervising the structural repairs and
modifications of the existing and new framing.
Additional details forthcoming as the building is
lifted and framing exposed.
extend existing
roofline over new
back addition
■
red cedar shingles, existing
rafters w/ new 2 x rafters as
needed for reinforcement,
foam insul.,1/2" gyp brd w/
plaster finish.
(2) 1.75"x11.815" LVL ridge
Cross Section 5
1/4in=1ft
I
I
existing attic floor to be removed
I I
existing living room
Exterior walls xisting walls, M
clipboard Sidi , housewdap, t-
1/1" ply, foa i sul., 2 x Ituds as
needed for reorcement,l1/2"
gyp brd w/ pl s er finish .
-T l framing repairs as needed I Ir—
red cedar shingles, existing
rafters w/ new 2 x rafters as
needed for reinforcement, (2) 1.15"x11.615" LVL ridge
foam insul.,1/2" gyp brd w/
plaster finish. Cross Section 6
1/4in=1ft
I
(2) 1.75"x1.25" LVL
existing attic floor to be removed
I I existing ceilinc
new bFim w/
posts �u�aport Exterior walls: e i ting walls,)
clapboard siding ousewra�,
existing roof
I I 1 /2" ply, foam ir s Al., 2 x sts as --0- _
I I need. c! for reinf r ement,'! to
I I gyp Ord w/ plaster finish f
II I I
I IE I 15'-3"
II
new foundation and floor
0
m O
O
N
Ur O
0-
N
O
N
02 Z
O a-o
> '� O
Q � �
ca
6 t! %—
O O �
O1
c
cB
C
O
O
O Q
-f
U
O
U E
N0
Q N fn
DATE:
1 I77120 22
SCALE:
as noted
SHEET:
Pg-8