Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH • SEWAGE PLAN REVIEW CHECKLIST Location: A.M. ,A 7 Lot 70 Zone of Contribution: In Out l Acreage SC / Commercial: Residential: !/-- Street: 3 / ( f,,g r al ; 1( 4 r, ) , Village: Floor Plan: 1 #Bedrooms: 3 Owner: i 7 i G� y/A �„ „� 0 v� Installer: 0C, r Address: / Phone: Phone: Builder: Engineer: R i ci, t1-- ! J: /c. O Address: Phone: /� Phone: 100 re S e C -t B I-a i/ns - N/A YES NO 1. Required#of copies received ✓ 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material,above water table / - 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ✓ 5. Water line 10 ft from septic components Var.: I L/ 6. Benchmark indicated and shown-NGVD if near wetlands 1 7. Septic tank minimum 10 ft from foundation, deck Var.: ✓ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab L_.. - 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: / 13. Uses adjustment for maximum high groundwater Var.: l 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5' removal 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", %"preferred _18. System meets breakout requirements PVC liner: Wall: ,----"/ 19. Specified tee sizes are proper, gas baffle on outlet tee , 20. Sewage is under 10,000 gpd for parcel \/_ 21.No Qarbaae disposal I 2 System ade uately sized for its intended use- 1/_r, 3 d, 1,„ re vet ,..� I L---•"". 23. inimum 6 and dbox 24. Manhole covers within 6"of grade,pump chamber cover to grade 25. Inspection port on plastic chambers/leach field / 26. Electrical permit for pump chamber/Separate meter for duplexes / 27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size / 28. Septic tank/pump chamber to be factory waterproofed - 1 29. Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber . 3-1. Engineer to inspect and certify soils: -- wall: commercial: - - - 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic,groundwater / 34.Title V Application and permit fee,installer signature 35.Foundation footing min.2 feet above adjusted ground water for new house r 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: Cy_G".4„„yd__ _S(,�. /_�� _ ,o:o: /`V' � Z