Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH Zal- { 7 SEWAGE PLAN REVIEW CHECKLIST 6'�'. / - _) / G�/'" Location: A.M. 71 Lot Zone of Contribution: In (` Out Acreage /3. il`-- (tP 5 `�-t Commercial: Residential: ' Street: J' Village: Floor Plan: `_7. # Bedrooms: Owner: G/j //416---Z-7Installer: CifiZe4A.6i6 Address: Phone: Vg=f 2k `-fG).1? Phone: Builder: Engineer: 6Lp( &./e/.c Address: Phone: J E--4 77 ` c.413 Phone: N/A YES NO 1. Required#of copies received l./ 2. Date of soils exam and percolation test not older than 2 years L------ 3. 4-5 ft of naturally occurring pervious material, above water table 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: ,....______-- 5. Water line 10 ft from septic components Var.: L� 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: %1` 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ,, � 9. Leaching minimum 100 ft from wetlands Var.: t..____ 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: c./ 13. Uses adjustment for maximum high groundwater Var.: ,/ 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: ...__--- 15. System not in top or subsoil(A,B horizons)or 5' removal l� 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", ''A"preferred ✓' 18. System meets breakout requirements PVC liner: Wall: �� 19. Specified tee sizes are proper, gas baffle on outlet tee `----- 0. Sewage is under 10,000 gpd for parcel �_.---- 21. No garbage disposal 22. System adequately sized for its intended use l� 23. Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade,pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes _/'" 27. Pump system-2" line,weep hole,check valve, tee in dbox, pump size ��� 28. Septic tank/pump chamber to be factory waterproofed `___----- 29. Vent provided if leaching below 3 feet, under driveway/parking __,--'''' 30. Buoyancy calculations for tank/pump chamber ____,' 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic, groundwater / 34. Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: _ : gpd / 37. Check area lots for groundwater/Label groundwater in Assessor's Map �------- Plan reviewed by: 6/03103