Loading...
HomeMy WebLinkAboutReview Checklist 'T TOWN OF YARMOUTH I Z SEWAGE PLAN REVIEW CHECKLIST Location: AlV1 53 LOT 4.-7a V Date of Subdivision Approval - Street 7/ /- ei 7 " t:' '�2./ M Zone of Contribution: In Out ''' Village S . 7`x4 f172.-r Commercial Residential ('- Owner: a2‘ fl Installer (2- Y,C _ -77 s - -7c1Z) Builder: Engineer ,-- ��pi/ 6iz); N/A YES NO 1. Required number of copies received. `tz9 2. Date of soils exam and percolation test not older than 2 years. 3. 4 feet of naturally occurring pervious material, above water table(new construction) 4. Foundation 2 feet above high point of fronting road for new construction. ?o 5. Water availability letter from Water Department for new construction. b 6. Benchmark indicated and shown- NGVD if near wetlands. 7. Building sewer does not exit center of house. 8. Septic tank a minimum of 10 feet from house and deck. 9. Leaching a minimum of 20 feet from house and 10 feet from deck. 10. Leaching a minimum of 100 feet from wetlands. Y 11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. X 12. System meets all other setback requirements. 5 13. Uses adjustment for maximum high groundwater. 1 f !-�intt d c feet above adiusted water table or bottom of test pit. 1 :: , ,. ;p or subsoil or 5 foot removal. 16. Proposed contours are suitable. X , 17. System meets slope requirements - min. 1/8", 1/4" preferred. >C '8. System meets breakout requirements- peastone elevation carried out 15 feet minimum. X. 1-9. Specified tee sizes are proper, gas baffle on outlet tee. 20. Sewage flow under 10.000 epd for parcel. k7 1 \To : .:3- : 17^,7al. 22. System adequately sized for its intended use. X 23. Minimum 6" stone or mechanically compacted below the tank and d-box. X 24. Manhole covers within 6" of grade - septic tank and pump chamber. >= 25. Electrical hermit for pump chamber. 26. Pump system - 2" line. weep hole. check valve, sanitary in d-box. alarm on separate circuit.�e 27. Septic tank and pump chamber to be Factory waterproofed. , 28. Vent provided if leaching below 3 feet or under driveway or parking. lc 29. Engineer to inspect and certify : a. clay removal 1° b. wall construction schedule c. commercial system 30. Engineer and Land Surveyor stamp and signature. > 31 . H2O loading when system subject to vehicular traffic. ?0 32. Title V application and fee signed by a licensed installer. ?" 33. Foundation footing 2 feet above adjusted water table. 34. Lot subdivided prior to July 31, 1986 - Nitrate Loading. X' 35. Subdivided prior io April 7_1989 - Phosphorus Zone 300'. Plan reviewed by: