Loading...
HomeMy WebLinkAboutReview Checklist . TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST ° Location: A.M. Lot 41� Zone of Contribution: In_ Out LP Acreage Commercial: Residential: t---) Street: 7/ >''f��,�'1 lC frr,,a �� Village: , li/• Floor Plan: # Bedrooms: 'VL2,u41 Installer: kir Owner: sz fin/ Address: Phone: -Phone: Builder: Engineer: CQ I UK(M Address: 7 Phone: S}j 9 7 '& Phone: N/A YES NO 1.Required#of copies received 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table L----- 4.Foundation 2 ft above high point of road H.P.:• Fnd: Var.: 5. Water line 10 ft from septic components Var.: L . 6. Benchmark indicated and shown-NGVD if near wetlands Ll 7. Septic tank minimum 10 ft from foundation, deck Var.: \,,,/. 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: a-/-. 9. Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: _ 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: -- 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj.water or bottom of test hole Var.: ....----- 15. System not in top or subsoil(A,B horizons)or 5' removal 16.Proposed contours are suitable `.1 17. System meets slope requirements-min. 1/8", 'A"preferred 18. System meets breakout requirements PVC liner: Wall: • �� 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel ��. 21.No garbage disposal `� 22.System adequately sized for its intended use �.� 23.Minimum 6"stone or compacted below tank and dbox i / a 24.Manhole covers within 6"of grade,pump chamber cover to grade `..././ 25. Inspection port on plastic chambers/leach field `� 26.Electrical permit for pump chamber/Separate meter for duplexes ._�: 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed _.---' 29.Vent provided if leaching below 3 feet,under driveway/parking 30. Buoyancy calculations for tank/pump chamber ` 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature / 33. H-20 loading is subject to vehicular traffic, groundwater / 34.Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: z CW03/03