Loading...
HomeMy WebLinkAbout2023 Sign off Transmittal - Addition (2) oFgR TOWN OF YARMOUTH HEALTH DEPARTMENT PERMIT APPLICATION SIGN OFF TRANSMITTAL SHEET To be completed by Applicant: Building Site Location: 13 O U t h Si-• 5 o k �)Ct.vr► Yl oC a Proposed Improvement: 11 {c l l Vm 6 c +D P y i $ X q,`7 a- -f. tC D- Lt ,e_ r t d v T g , v-o van vim.u0 G.d 9..c 4.2 h + C r,A.i 6 tic�t�� V nA►9 c n` Applicant: 1 Ca l a-��ham, ( u �.�� � Tel. No.:5 o g Address: 02 I O t Act £t , Date Filed: **If you would like e-mail notification of sign off please provide e-mail address: Owner Name: �L A- IDo vt cJ d ca`7?\tit cc Owner Address: 2,,1 3 DlA )' &vn t Owner Tel. No.: �(T �'- Z 1 4 RESIDENTIAL AND/OR COMMERCIAL BUILDING HEALTH DEPARTMENT: Determines Compliance to State and Town Regulations; i.e.,Requirements For Septage Disposal and other Public Health Activities. RECEIVED Please submit three (3) copies of plans, to include: (1.) Site Plan showing existing buildings, water line location, APR 05 2023 and septic system location; (2.) Floor plan labeling ALL rooms within building HEALTH DEPT. (all existing and proposed) — Note:Floor plans not required for decks, sheds, windows, roofing; (3.) If necessary, Title 5 application signed by licensed installer with fee. REVIEWED BY: DATE: ,3 ` PLEASE NOTE COMMENTS/CONDITIONS: 9 El 67F (1-i-A f-. �_.__...___ �,. ._-....�..__.___...-._._._,_...ram..._.__ .._...`...... .: First Fkxx Demolition Notes 1. Make safe electrical prior to demolition. 2. Demolish and dispose of door and frame. 3. Remove and dispose of sheetrock on entry side of the garage wall. 4. Remove and dispose of window. 5. Remove and dispose of wall for new T-W door from existing bathroom to new addition. 6. Remove and dispose of wall for access to pantry in new apartment. 7. Demolish and dispose of all dotted wall sections. Repair ceilings as required in for re -use. 8. Remove and dispose of existing roof section over entry and a portion of the living room. Brace remaining walls as required until new framing and roof are installed. Kt7e-hr N I j I j -4 ---t \vf 40 (4 �.. g __ L P I'-0c0A\ (D6 1 RECEIVED AHK 05 2023 HEALTH DEPT. Sullivan / Pedersen Addition / Renovation 213 Old Main Street Bass River, Massachusetts First Floor Demolition Plan December 14, 2022 Scale: '/4" First Floor New Construction Notes 1. General Note: All new exterior wall framing to be 2"x6" construction. 2. Furnish and install pair of new 2'-6" doors — style by owner. 3. Furnish and install new bam door and track at 3'-0" opening — style by owner. 4. Furnish and install new Pella exterior 3'-0" x 6'-8" door with 1 "-0" side lights. 5. Extend existing bulkhead from grade to new first floor height and install new doors. 6. Furnish and install new Pella French doors (double acting) — each door 2'-6" x 6'-8". 7. Furnish and install new fireplace — style and model by owner. 8. Construct new footing and foundation system under new addition. Footings shall be 20" wide x 10" thick at 4'-0" minimum below grade. Foundation wall shall be 8" wide with 5f8" anchor bolts at 36" on center. 9. Furnish and install new Pella French door and fixed panel — each panel 2'-6" x 6'-8". 10. Furnish and install new Pella double hung windows — Model 3741— align with windows above. 11. Furnish and install new Pella awning windows — Model 2521— align with windows above. 12. New counter and sink by owner. 13. Furnish and install pair of 1'-3" closet doors on pantry — style by owner. " , n 14. Furnish and install new 3 -0 x 6 -8 door. i 15. Furnish and install pair of 3'-0" x 6-8" doors. �I 4,. UA ! '4 I i t CQ I' -- Al+ '14N Nc-w W^V4 w �n«IOf- cF -syFevr4V _4,.�,_ . 1a tQ �AC^t-,G Sullivan / Pedersen Addition / Renovation 213 Old Main Street Bass River, Massachusetts 1st Floor New Construction December 14, 2022 Scale: '/4" =1'-0" Second Floor Demolition J New Construction 1. Genera Note: All new exterior wall framing to be 2"x6" construction. 2. Center new window below the window in the attic — see south elevation. 3. Remove and dispose of window in existing fagade — frame and close opening. 4. Remove and dispose of existing door and framing for new corridor. 5. Remove existing framing on the east wall of the bathroom and re -frame wall with 2"x6" studs to a height of 8'-0" for new dormer. 6. Remove ceiling joists and rafters above bathroom and re -frame new dormer. 7. Furnish and install new pair of 2-6" doors — style by owner. 8. Fu mish and install new 3'-0" door — style by owner. 9. Furnish and install new 3-0" door and center in opening — style by owner. I C-1�047E-J Nr--W VMITY IL K 41. Of HOLA60 ALIGN NSW WALL, I WALL a ebE67'10N ?5- b C, Sullivan Pedersen Addition l Renovat6 213 Old Main Street Bass River, Massachusetts 2nd Floor Demolition New Construction December 14, 2022 Scale: 1/4" = 1'-0" r t4eW QqI *TON New o{ me j- f x -- NeW F <qI Nb / ForAN PATIoN —t WPLk- Fo� ArIt%t'ftt* ;'09,fOAD Nevi DIVVY, ftt^ ► 4 Pk**MS6 ff -AmW6 I tIze PY406114W. ti s G T _ New �L•G l � � � F�Ttt� %t�►� I,vAl.L-�`JaZt� f�( �Nr�fni��F� Sullivan / Pedersen Addition / Renovation 213 Old Main Street Bass River, Massachusetts Building Sections December 14, 2022 Scale: Y4" = V-0" INSTALL R15ER5 * COVER5 TO PIPE5 TO BE LAID LEVEL FOR 'VARIANCE WITHIN 6 OF FINISH GRADE 2 OUT OF DISTRIBUTION BOX 2" LAYER OF: DOUBLE WADNED PEASTONE REQUESTED: 3 10 CMR 15.221(7) - TO ALLOW PLAN VIEW FOR LOCATIONS) OVER. 3/4" - I lz" DOUBLE WASHED STONE 5A5 TO BE 42" BELOW GRADWHERE 3G" I5 THE MAXIMUM Itm (SEE ALL AROUND ALLOWED - w 3; installat Cape cod... ku U o'n � Q U+ tt-%I fl- EL. 100.7* t. N - a- EL. 100.7 - - _ _ - _ _ _ - - - ____ _ _ _ - - - _ - - - Q 16 T. O. F, LOCUS EL. 101 .4 4" SCH 40 PVC 4" SCH TOP @ EL. 97.2 0 !O" O PVC 4" 5CH 40 PVC .,f;r:r:„I :;+:?;Ln g !4" 97.50 I *< :::::_ :: (3) 500 GAL. PRECAST DRYWELL5 (H-20) � ,-; 98.4 IN5TALL GA5 13AFFLE 7 17 97.00 BOTTOM @ EL. 94.70 _ - Q IN OUTLET TEE 97.25 9G.70 1 500 GALLON PRECA5T SEPTIC TANK DB-G (H-20) ' IN5TALL TANK * D-BOX ON G" LAYER OF CRUSHED 5TONE 5EPTIC 5Y5TEM PROFILE �-- T13M = EL. 101 .0 CORNER OF STOOP P � -2� EXISTING �.' 100.4 �� I DWELLING EXISTING T.O.F. @ EL. 101 .4 CLEANOUT I00.7 i !0O \ EXISTING 5EPl-IC �� �� r • / 5Y5TEM TO BE \ r / REMOVED + �� , ` • r PROP05ED ADDITION r\ 100.7 1� 100 1 m 101.0 00ti / 100.5 / r LOT AREA: / 323G5.7 5.F, 2' DE51GN DATA DAILY FLOW: (4) BDRM5 x 110 GPDBDRM = 440 GPD SEPTIC TANK: 440 GPD x 200% = 880 GPD USE: 1500 GALLON PRECAST 5EPTIC TANK DISTRIBUTION BOX: DB-G - (G) OUTLET D15T. BOX (H-20) 501L A850RPTION 5Y5TEM: USE: (3) 500 GALLON PRECAST DRYWELL5 LINED w/4' OF DOUBLE WASHED STONE ALL AROUND CAPACITY: BOTTOM: 13' x 33.5' x 0.74 = 322.3 GPD 51DEWALL: 93' x 2' x 0.74 = 1 37.G GPD TOTAL: 459.9 GPD 99 STEVEN W, N o RUMBA No.3579? ZONING D15TKICT: R5-40 5' MINIMUM FRONT SETBACK: 30' MINIMUM SIDE 5ETBACK: 20' MINIMUM REAR SETBACK: 20' MAXIMUM GOT COVERAGE: 25% 130TTOM TH @ EL. 89.7 PROPOSED LOT COVERAGE: TOTAL AREA: 3824 S.F. 3824 5.F./323G5.7 S.F. = 1 1 .8% DEEP OBSERVATION HOLE LOGS DATE: 05-20-2003 TEST BY: D. MASON, RS 4 CSE WITNE55: A. VON HONE, HEALTH AGENT PERC RATE: < 2 MIN. / INCH DEEP OBSERVATION HOLE # I EL. 101 .2 DEPTh 501L SOIL 501L COLOF, 501L FROM HORIZON TEXTURE (MUN5ELQ MOTTLING OTHER REAC If 0" - 9" A SANDY LOAM I 0YR5/2 9° - 35" Bw LOAMY SAND I OYRG/G 35" - 135" C FINE -MEDIUM SAND I OYRG/4 NO GROUNDWATER ENCOUNTERED GENERAL NOTE5 I . 5EPTIC SYSTEM IS TO BE INSTALLED IN ACCORDANCE WITH 310 CMR 15.00: TITLE V 2. TH15 SEPTIC 5Y5TEM IS NOT DESIGNED FOR THE U5E OF A GARBAGE D15PO5AL. 3. THIS PLAN 15 NOT TO BE U5ED FOR PROPERTY LINE DETERMINATION 4. CONTRACTOR SHALL PROVIDE 48 HOUR NOTICE TO DESIGN ENGINEER FOR ANY REQUIRED INSPECTIONS 5. CONTRACTOR TO BE R.E5PON5I13LE FOR THE LOCATION OF ANY UTILITY, ABOVE OR UNDERGROUND, PRIOR TO ANY EXCAVATION OR CONSTRUCTION tV 0. 1 I •��.! WITA' SEPTIC DE51GN BY: MEYER* 5QN5, INC. 51 E - 5F=WAGF= PLAN FOR 213 OLD MAIN 5TREET SOUTH YARMOUTH, MA PREPARED FOR DONALD * JUDITH 5ULL VA 7AY IN = 30' VA"t 01-10-2023 DRAWN BY TMW .JOB NU't.6efk RP\43rp 9n PL p 5P- I WFLLER * A550CIATE5 P.O. BOX 417 CENTERVILLE, MA TEL: (508) 328-4G92 EMAIL: trl5weller@gmaii.com REGISTERED LAND 5URVEYOR5 4 ENVIRONMENTAL CON5ULTANT5 i'ravemt; PC INSTALL R15ER5 * COVERS TO WITHIN G" OF FINISH GRADE (5EE PLAN VIEW FOR LOCATION5) EL. 100.7 T.O.F. @ EL. 1 01 .4 4" SCH 40 PVC 98.4 97.50 003 INSTALL GAS BAFFLE IN OUTLET TEE 14" PIPES TO BE LAID LEVEL FOR 2' OUT OF DISTRIBUTION BOX 1 500 GALLON PRECAST SEPTIC TANK 4" SCH 40 PVC 4" SCH 40 97. 1 7 97.25 D5-6 (H-�7n INSTALL TANK - ON G" LAYER OF CRUSHED STONE Q , P EXISTING OLO �� DWELLING 100.4 ' T.O.F. @ EL. 10 1.4 2" LAYER OF DOUBLE WASHED PEA5TONE OVER 3/4" - 1 I/2" DOUBLE WASHED STONE ALL AROUND (3) 500 GAL. PRECAST DRYWELL5 (H-20) 9G.70 SEPTIC 5Y5TEM PROFILE T15M = EL. 101 .0 CORNER OF STOOP -EXISTING CLEANOUT 1 00.7/. 1.14, \ :: :::: t:. : ---- l01� EXI5TING SEPTIC \\ `\ • / SYSTEM TO BE / REMOVED \\ + �\ ` • / PROPOSED ADDITION 100.8 6' • o° 1 00.7 6 VENT 100 I (' t 1 lol.o I 'QOO� 100.5 / LOT AREA: / 323G5.7 S.F. I 23 \32. .. DE51GN DATA DAILY FLOW: (4) BDRMS x 110 GPD/BDRM = 440 GPD SEPTIC TANK: 440 GPD x 200% = 880 GPD USE: 1 500 GALLON PRECAST SEPTIC TANK DISTRIBUTION BOX: DB-G - (G) OUTLET DI5T. BOX (H-20) SOIL ABSORPTION SYSTEM: USE: (3) 500 GALLON PRECAST DRYWELLS LINED w/4' OF DOUBLE WASHED STONE ALL AROUND CAPACITY: BOTTOM: 1 3' x 33.5' x 0.74 = 322.3 GPD SIDEWALL: 93' x 2' x 0.74 = 137.G GPD TOTAL: 459.9 GPD IVA OF N4gs 2� Sycy -° STEVEN W. 1114 0 RUMBA - ° No.35791 v °1F ISTEa``o L LANDS *VARIANCE REQUESTED: 3 10 CMR 15.221(7) - TO ALLOW SAS TO BE 42" BELOW GRADE WHERE 3G" 15 THE MAXIMUM ALLOWED EL. 100.7* 5' TOP @ EL. 97.2 BOTTOM @ EL. 94.70 BOTTOM TH @ EL. 59.7 Hardwood flaorina 19 T installation Cape Cod -. St. David s Ti\4ir41 ti#'iaY Tf1 d'6aTc' LOCUS ZONING DISTRICT: R5-40 MINIMUM FRONT SETBACK: 30' MINIMUM SIDE SETBACK: 20' MINIMUM REAR SETBACK: 20' MAXIMUM LOT COVERAGE: 25% PROPOSED LOT COVERAGE: TOTAL AREA: 3824 S.F. 3824 5.F./323G5.7 S.F. = 1 1 .8% DEEP OBSERVATION HOLE LOGS DATE: 05-20-2003 TEST BY: D. MASON, RS * C5E WITNE55: A. VON HONE, HEALTH AGENT PEKC RATE: < 2 MIN. / INCH DEEP OBSERVATION HOLE # I EL. 101 .2 DEPTH 501L SOIL SOIL COLOR 501L ff HORIZON TEXTURE (MUN5ELL) MOTTLING OTHER SUROFM 0" - 9" A SANDY LOAM I OYR5/2 9" - 35" Dw LOAMY SAND I OYRG/G 35" - 1 38" C NNE -MEDIUM SAND I OYRG/4 NO GROUNDWATER ENCOUNTERED Yarmouth Health Department VED iam �-= �- Date GENERAL NOTE5 I . SEPTIC SYSTEM IS TO BE INSTALLED IN ACCORDANCE WITH 3 10 CMR 1 5.00: TITLE V 2. TH15 SEPTIC SYSTEM 15 NOT DESIGNED FOR THE USE OF A GARBAGE DISPOSAL. 3. THIS PLAN 15 NOT TO BE USED FOR PROPERTY LINE DETERMINATION 4. CONTRACTOR SHALL PROVIDE 48 HOUR NOTICE TO DESIGN ENGINEER FOR ANY REQUIRED INSPECTIONS 5. CONTRACTOR TO BE RESPONSIBLE FOR THE LOCATION OF ANY UTILITY, ABOVE OR UNDERGROUND, PRIOR TO I ANY EXCAVATION OR CONSTRUCTION SEPTIC DESIGN BY: MEYER * SONS, INC. SITE - 5EWAGE PLAN FOR 2 13 OLD MAIN 5TREET 50UTH YARMOUTH, MA PREPARED FOR DONALD * JUDITH 5ULLIVAN 5CALE I " = 30' UaTE 01 - 1 0-2023 oN 5 TMW roe vur�n5er: j1ffV151D JsH'-a SP- 1 WELLER * ASSOCIATES P.O. BOX 4 17 CENTERVILLE, MA TEL: (508) 328-4G92 EMAIL: trl5Weller@cgmall.com REGISTERED LAND SURVEYORS * ENVIRONMENTAL CONSULTANTS Traverse PC