Loading...
HomeMy WebLinkAbout2023 Sign off Transmittal - Interior Remodel ° k TOWN OF YARMOUTH rt., trl t HEALTH DEPARTMENT ~.„, PERMIT APPLICATION SIGN OFF TRANSMITTAL SHEET To be completed by Applicant: Building Site Location: 19 , & EJLE'_4 /2-c— Proposed Improvement: ' 'S(4 a i c u. D C:c L cz. _ r 0 r tN►ccs ` r cf. Applicant: X.2ULA2-410 In Tel. No.: (o/) -L-/Z . 93 Address: 2_6 P l a c k. 4)cxy 8 et 5 kr,e o A 6 l Date Filed: V Iy Z-02_3 **If you would like e-mail notification of sign off please provide e-mail address: Owner Name: De, c S 6-c:`c,ha_ Owner Address: 2..c Lc 1 4j;If l C-r J N Oic<3 '3 Owner Tel. No.:? - /- CM- RESIDENTIAL AND/OR COMMERCIAL BUILDING HEALTH DEPARTMENT: Determines Compliance to State and Town Regulations; i.e., Requirements For Septage Disposal and other Public Health Activities. Please submit three (3) copies of plans, to include: (1.) Site Plan showing existing buildings, water line location, and septic system location; G-. LO ( D (2.) Floor plan labeling ALL rooms within building MAR 4 2�23 (all existing and proposed)- Note:Floor plans not required for decks,sheds, windows, roofing; HEALTH DEPT. (3.) If necessary, Title 5 application signed by licensed installer with fee. REVIEWED BY: /-;‘.r..,„.. C — DATE: 'r-L( -�' PLEASE NOTE COMMENTS/CONDITIONS: e- L� 1 ' piriL k N Garage DN-8 Open Breezeway Bedroom DN-9 Hall 17 z I f Living `? r p II C rm. o Kitchen D N-2 o Laundry DN-3 Front Porch DN-11 Master bedroom Exisitng First Floor INTERIOR: DN-1 Kitchen/Laundry bathroom: - Remove all cabinets, countertops, appliances, electrical & plumbing fixtures and rough -ins. - Remove wall and ceiliing finishes, remove finish floors - Remove the interior walls around the bathroom and between the kitchen and backhall/ laundry - Remove the step into the living room. DN-2 Living Room: - Remove the large window facing the porch and the front door. -Remove the closet door & frame. - Remove the carpet and finish fllor down to the subfloor. - Remove the moulding around the firplace and the mantel shelf. DN-3 Master Bedroom: - Remove wall and ceiling finishes, remove finish floors - Remove the interior walls around the closets. - Remove the extrior wall facing the garage. Shore to remove. - Remove the interior wall between the closets & bathroom/hallway. DN-4 Common Bathroom: - Remove and plumbing & electrical fixtures . - Remove wall and ceiliing finishes, remove finish floors - Note the plan is to replace the fixtures in the same locations, Rough -ins remain unless compromised. ENTASIS PC Jay C.Walter AIA 83 Pembroke Street Newton, Massachusetts 02458 e-mail:entasis@rcn.com telephone: (617) 527-8383 DN-10 ip Cn 0 m demolish the garage and breezeway in their entirety Selective Demolition Notes: DN-5 Hall: - Remove wall and ceiliing finishes, remove finish floors - Remove the interior walls around the closets. - Remove the wall between the hall and bathroom/ hall. - Remove the interior walls around the closet against the master. DN-6 Rear Bedroom: - Remove wall and ceiling finishes, remove finish floors - Remove the interior walls around the closets. - Remove a portion of the wall between the bedroom & hallway. See floor plan A-3 DN-7 Breezeway: - Remove the roof assembly in its entirety including all framing. - Remove the paving material between the garage and house. - Remove light fixture and assoc. wiring. DN-8 Garage: - Remove the garage structure in its entirety including roof and wall assemblies, foundation and floor slab.b DN-9 Bulkhead - Remove The bulkhead assembly entirely including wood door, and concrete walls and stairs to be replaced. DN-10 Rear Stoop: - Remove the Rear masonry stoop in its entirety. DN-11 Front Porch: - Remove all wod plank decking - Remove the trim around the columns: remoce the fascia & soffit. - Remove the finish ceiling & lighting fixtures. Existing Basement Plan BASEMENT NOTES: -Remove the basement windows (6) Openings to be infilled with CMU -Remove the bulkhead interior door, to be replaced. -Excavate and remove forst wall & retaining wall for new basement area. Refer to structural drawings for notes and details. GENERAL DEMOLITION NOTES: - Protect the interior from moisture and weather when doors and windows are removed. Cover openings with plastic or rigid board. - Remove the interior GWB from all exterior walls and remove the cavity insulation, to be replaced. - Remove the existing AC system including the condenser, air handling equipment and all ductwork and registers. SALVAGE ITEMS: Carefully remove the following items to be salvaged and donated to Habitat for Humanity. Store and coordinate pick-up. -Exterior 9 lite doors (2); Exterior 2 lite door ; - Garage door w/ track & motor assembly - 6 Panel interior doors & Frames & Louvered closet doors - Surface mounted light fixtrues - Bath tub; Drop -in sink & faucet. - Microwave; Refrigerator, Dishwasher - SS kitchen sink and faucet. - Shower Sliding door assembly (plastic panel) - Vanity w/ sink and faucet. - Exterior light fixtures, wall mounted (3) Existing Floor Plans &Demolition Notes Gagne Residence Addition &Remodeling 18 Bass River Road South Yarmouth, Ma. DATE: 5/2/22 pricing set 8/2/22 reduced scope SCALE: n _ � rSis✓' 1 / 16 1 0n t� SKETCH NO. v� A _ 2 1.T tr1f11}� Gagne Residence 12'-0" field verify 5' long vanity selected by owners w/ mirror above 3'x6' tiled shower stall w/ glass front \, pitch tiled floor to !• center drain Frame floor platform in - garage & breezeway to ar) align with house. Finish w/ T&G w0000d plank flooring 0 IS 1 \13 1I Bedroom 20 13 17 22 22 --- _ m1 F Remove the existing exterior door, remove hardware & patch Jamb at framed opng. 4 X25 Frame stoop & step; between walls: landing & _L tread composite decking Remove the exterior door & frame Patch to match inside and out CN- - - - -- NOTE: green shaded area indicates the addition Install outdoor shower w/ valve for seasonal draining. Solid fence and gate by others .Stone pavers over 6" crushed stone base 11 ' Rear Bedroom 0 2R ---------- -- CLinei, 12 dn. , j Common 2 bath i c;) i O L91 7'-9 1 /4" le addition ENTASIS PC Jay C.Walter AIA 83 Pembroke Street Newton, Massachusetts 02458 e-mail:entasis@rcn.com telephone: (617) 527-8383 Front Bedroom 1 2'-3 1 12'-7 1 /4" field verify Frame stoop & step; between walls: landing & tread composite decking Heat pump location Remove section of wall in hallway; patch to match wall, ceiling & floor. O O Frame new 4'6" finished 7opening into exist wall; partial infill exist. opening; patch to match wall finish and baseboard. Living room. Remove and replace all the fixtures and finishes in the common bathroom 6'-5" 01 field verify 7' Screen Porch 19'-3" field verify 5-0 1 /8" 15'-9" ill e L undry Kitchen -- 24 3'x4' pantry island 4 • i 5 ------ --- -- L - - - First Floor Plan Gagne Residence Addition & Remodeling 18 Bass River Road South Yarmouth, Ma. Remove & rebuild bulkhead. w/ concrete walls & floor slab; PT open riser stair & Bilco metal door. Infill existing window & door openings around new kitchen. Frame new openmings as shown. Build raised floor platform at kitchen, laundry and pantry to living room ht. Refer to structural sheet A-10 Infill existing window & door openings around new kitchen. Frame new openmings as shown. i 00 rod N in Q�25 00 N - Reframe doorway to raise opening to 27; new floor height. 27 Granite stoop 42" x 42" over -- - compacted base. U Ln 6'-8" Frame infill at depressed landing to align new decking with remaining porch Remove LR window, Frame opening for new 4 panel sliding door. Shore to install new header Aluminum full ht. screen panels set in trimmed jamb. Refer to post details Remove deck plank & replace with composite decking. Existing porch posts remain. Remove existing trim including arches between posts; New PVC trim. Refer to elevations. New trim to accommodate alumin. screen panels. DATE: 5/2/22 pricing set 8/2/22 reduced scope SCALE: 1/8" = 1'-01, blks . SKETCH NO. A-4 Gagne Residence DEEP OBSERVATION HOLE LOGS DATE OF TESTS: XXX XX, 202X PERCOLATION RATE: OBSERVATION HOLE #X & #X PERCOLATION RATE < 2MIN /INCH WITNESSED BY: XXX, CEC XXX, HEALTH AGENT NO GROUNDWATER ENCOUNTERED DEEP OBSERVATION HOLE 1. EL. = XX.X± DEPTH FROM SOIL SOIL SOIL COLOR SOIL OTHER SURFACE HORIZON TEXTURE (MUNSELL) MOTTLING pll-XXI, FILL XXX 10 YR X/X XXX xxx XX"-Xx" A' XXX 10 YR X/X xxx xxx xX" - XX" B XX" - XX" C XXX 10 YR X/X XXX xxx DEEP OBSERVATION HOLE 2. EL. = XX.X± O DEPTH FROM SOIL SOIL SOIL COLOR L� OTHER SURFACE HORIZON TEXTURE (MUNSELL '` FILL XXX it` ` xxx XX XX A Q B XXX XXX XXXx XX" - XX" XX" - XX" XXX C XXX XXX DEEP OBSERVATION HOLE 3 O DEPTH FROM SOIL _COLOR SOIL OTHER SURFACE HORIZON .MUNSELL) MOTTLING 0x_7tX^ FILL 10 YR X/X XXX XXX XX" - XX" _A 10 YR X/X XXX XXX XXX O 10 YR X/X XXX XXX DEEP OK HOLE 4. EL. = XX.X± DEPTH FROM AIL SOIL SOIL COLOR SOIL OTHER SURFACE F,JRIZON TEXTURE (MUNSELL) MOTTLING 0" )O(• FILL A XXX 10 YR X/X xxx xxx XX„ _ XX.. XXX 10 YR X/X XXX xxx XX" - XX" B XXII - XXI, C xxx 10 YR X/X XXX XXX NOTES: 1. GARBAGE GRINDERS ARE NOT ALLOWED WITH THIS DESIGN. 2. ALL WATER FIXTURES TO BE WATER TESTED BY CONTRACTOR TO VERIFY ALL SEWER EXIT LOCATIONS PRIOR TO INSTALLATION OF ANY SYSTEM COMPONENTS. 3. THE INSTALLER IS RESPONSIBLE FOR ASSURING THAT COMPONENTS OF THE SEWAGE DISPOSAL SYSTEM ARE DESIGNED WITH SUFFICIENT STRENGTH TO SUSTAIN ALL LOADS TO BE IMPOSED ON THEM. ANY COMPONENT OF THE SYSTEM SUBJECT TO VEHICULAR TRAFFIC SHALL COMPLY WITH A MINIMUM STANDARD OF A.A. S.H.T.O- H-20 WHEEL LOADS- 4 PROR TO STTING ANY SEWAGE SAL SYSTEM COMPONENT, INSTALLER SHALL VERIFY EXISTING COINDIT ONS EINCLUD NG ELEVATIONS OFOEXIT INVERTS, AND REPORT ANY DISCREPANCIES TO HE DESIGN ENGINEER. THE INSTALLER SHALL COORDINATE WITH THE PLUMBING SUBCONTRACTOR TO VERIFY THE COMPATIBILITY OF THE PROPOSED BUILDING SEWER EXIT ELEVATION WITH THE BUILDING'S EXISTING PLUMBING PRIOR TO CONSTRUCTION- ANY CONFLICTS SHALL BE REPORTED TO THE DESIGN ENGINEER 5. ALL GRAVITY SEWER PIPE SHALL BE 4" DIA. SCH 40 PVC UNLESS OTHERWISE NOTED. THE MINIMUM SLOPE OF 4" DIA. SCH 40 PVC SHALL BE 0.01 FTIFT. 6 THE AGENT OFIT THE CAL BOARD OF HEALTH. ALL REQUESTS FOR CHANGES SHALLLE BE ENGINEER NO PART OF MADE IN WRITING PRIOR TO CONSTRUCTION. 7. THE USE OF ALTERNATE MANUFACTURERS FOR SYSTEM COMPONENTS SHALL NOT BE APPROVED IF HE USE OF THEIR EQUIPMENT REQUIRES CHANGES IN DESIGN. I PRIOR 8 EXCAVATIONLAND SHALL PROTECTTHE INSTALER SHALL IUTIL TEES WITHINLOCATION HE WORK AREA DURING CONSTRUCTION OF EXISTING UNDERGROUND ES TO 9. ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC MARKING TAPE OR A COMPARABLE MEANS IN ORDER TO LOCATE THEM ONCE BURIED. IF APPLICABLE: ORGANIC 10. FILL MATERIAL FOR SYSTEMS CONSTRUCTED IN FILL SHALL BE CLEAN GRANULAR SAND, FREE OF MATTER AND OTHER DELETERIOUS MATERIALS. THE SAND SHALL BE GRADED SUCH THAT NOT MORE THAN 45 % OF THE SAMPLE, BY WEIGHT, SHALL BE RETAINED ON THE #4 SIEVE. THE FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN 2 INCHES. THE MATERIAL THAT PASSES THE #4 SIEVE SHALL MEET THE FOLLOVNNG GRADATION REQUIREMENTS: NOTE: SIEVE PERCENT ALL WATER FIXTURES TO BE WATER TESTED BY CONTRACTOR TO VERIFY ALL SEWER SIZE PASSING EXIT LOCATIONS PRIOR TO INSTALLATION OF ANY SYSTEM COMPONENTS. i 50 low-loox F ipp 096-20% # 200 o%su SOIL REMOVAL NOTE: REMOVE TOPSOIL AND UNSUITABLE MATERIAL WITHIN 5' OF LEACHING FIELD DOWN TO "C" HORIZON AND REPLACE WITH SAND FILL IN ACCORDANCE WITH NOTE #10. VIF NOTE: CONTRACTOR TO VERIFY IN FIELD THE EXISTING INVERT OUT OF THE BUILDING. NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO START OF CONSTRUCTION. HEAVY DUTY PRECAST CONCRETE COVERS WITHIN 9" MIN 3" OF FINISH GRADE (TYR) 36" MAX FINISH GRADE FLEXIBLE BUTYL RUBBER SEALANT - - - -t - L m LIQUID LEVEL 4- _ a'_l L DROP' 2" MIN. _ 14' 25 65± t° V.I.F. 25.45 N T 3" MAX. MIN SLOPE FOR A 4" 1,500 GALLON (H-20) 4'-0" LIQUID DEPTH PVC PIPE 0.01 FT/FT SEPTIC TANK (TYP) W/SANITARY TEES v I.D.-10'-6"Lx5'-0"Wx5'-O, Ij ,'.OD-11 6Lx6 OWx6-OH COMPACTED BASE WITH6"LAYER OF ��I IIII� IIIII�ryIII IIIIIIIII �IIII�III �III�II�IC o CRUSHEDSTONE (TAP.) ACME-SHOREY MODEL: ST152 U ±i p' (10' MIN) U 'o w U O 0 U) 0 PERC. @ EL. = XX.XX PERC. @ EL = XX.XX PERC. @ EL. = XXXX PERC. @ EL. = XXXX DESIGN CALCULATIONS: DESIGN FLOW: 3 BEDROOMS AT 110 GAL. PER DAY PER BEDROOM = 330 GPD REQUIRED SEPTIC TANK CAPACITY: 330 x 200%= 660 GAL. REQUIRED CAPACITY. USE 1,500 GAL. SEPTIC TANK (MIN. ALLOWED) REQUIRED LEACHING AREA: 12.83'W x 29.651 x 6.83'W x 29.65'L x 2'D LACHI NG CHAMBER CAN LEACH: Vt=129.65x2 x2 x.74)+(12.83x2 x.74)+(6.83 x2 x.74)+(290 x.74)=331.5 GPD Vt = 331.5 2 330 GPD RED. INSTALL: ONE (1) - 1,500 GAL. SEPTIC TANK (H-20) ONE ( 1) - DISTRIBUTION BOX - 5 OUTLET (H-20) ONE ( 1) - 12.83'W X 29.651 X 6.83VV X 29.651 X TO LEACHING CHAMBER ASSESSORS MAP 70 PARCEL 91 93 LAWN .4 POSED / RESERVE AREA \ / DOH*4 (±438 S.F.) / o 0 O x] ASSESSORS MAP 70 PARCEL 85 s,1 ASSESSORS MAP 70 PARCEL 84 29; GA'P4 , G�c 5 / A `A*-V y cyy�7 gP � Ag r c LAVAV _.J A2 51 "NE 1 I IX o � PROPOSED 1,500 GAL, SEPTIC TANK (H-20) L LOT28 SHIM 9,293 S.F.± 1711r (0.21 AC.) BA SS R/VET R 0,4 D PLAN 10 5 0 10 30 r,&=10k P�'F LOCUS Gy �0 BASS RNER RD. Z N 00 of O COASTAL engineering co. 2fi0 Qabeny Hwy, IIllraw, MA 02653 508.255.6S11 P S082SS6700 F 9 Q LF z a < ROUTE 28 z w YARMOUTH MA N KEY MAP o NO SCALE 0 REFERENCE: ASSESSORS MAP 70, PARCEL 92 L.C.P.22604A DATUM: ELEVATIONS SHOWN HEREON ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 1988) ASSESSORSP70 PARCEL ZONING CLASSIFICATION: R-40 \ MINIMUM REQUIREMENTS: L PROPOSED LEACHING CHAMBER AREA 40,000 SF. I1293 x 2965'x 6.83'x 2965'. H-20) LOT COVERAGE 25%Max. DROPOSED FRONTAGE 150 FT. OBSERVATION PORT SETBACKS: FRONT 30 FT. SIDE 20 FT- fo REAR 20 FT. SEAL O ..Y- PROPOSED 5'SOIL REMOVAL 82 'qOPOSED RESERVE ALL EXISTING SOIL SEWAGE AREA U 142 S F) DISPOSAL SYSTEM PROPOSED COMPONENTS TO BE DISTRIBUTION BOX PUMPED. RE IOVED, AND (CAB-5, H-20) Ot5POSED Of OFFSITE IN ACCORDANCE TO TITLE 5 AND LOCAL 9O11RD OF HEALTH REGULATIONS HEAVY DUTY PRECAS- CONCRETE COVERS TO BE PLACED WITHIN 5" OF - HEAVY DUTY PRECAST INSPECTION PORT TO FINISH GRADE (TYP ) AVY DUTY PRECAST - CONCRETE COVERS TO BE PLACED 1IMTi-m r - AO OIL wNYL ONCRETE RISERS ME PLACED WITHIN 6" OF OF FINISH GRADE. TIER OE Tt1 128M x 29.65'L x 6.831Nr7M1rt. ■ 14 LEACHING CHAMBER (TAP) F/iSH GRADE YP. SEE DIETFINISH GRADE = 28.0 - 26 B __ __^_ - _ _ T 1W PLACING THREE Sd X t--1E 1.t� LEACHING CHAMBER 4' YSH 40 PVCSQUARE KNOCKOUTS TO ' I I=11= 1' y I I 1 UNTME�DETAIL B OTO END. SEE DETAIL STONE DIMENSIONS. - GROUTED 9" MIN AM �4LMLLON LEACH CHAR LiR OUT PLUG BE AS MANUFACTURED BY -*AD LYFAFI �" TO oi� oou8LE MPT_ METH HYDRAULIC 36" MAX III kjl STONE 1 SHOREY PRECAST ON iO PIL► CEMENT (TYP) SPEED LEVELERS ' • __ .. _�----I T LAYER OF Ye" -'� "�- - � _':"'-^ a • r -- T U1'9L OF Ye TO TO X- STONE/ `/ V OR GEOTEXTILE / .. r 2_ M;' MMA.9ED STONE . •.i Li1 24.47 EFFECTIVE 2+2S 1= € �3 ti FABRIC _,�,p s,.,,,,. - 2520 DEPTH=2' tW., _ .�3, p' - t.::: . 2" MIN _ _ - 71 I =l l l I I- 51 E_= GAS BAFFLE USE MJF-TTTE OR LNES EXISTING D'BOX MUST -- - DEPTH TO ESTIMATED IfG" I APPROVED REMAIN LEVEL FOR 2 FT. _ c _ ,- 4' 10" VARE,S ,�GRIOUNDWATER = XX-II ro _ �'j{ � EOUNALENT (TYP.) BEFORE PITCHING DOWN TO y " -- 2!� o x � - `��-�I m J�'9tNMASHED STONE LEACHING FIELD - VARIES SEE DETAIL J I(. SUBGRADE LD-- zWWNt!m 4 RAP) 0 ACME-SHOREY 'j- MOOEL D8$2 ITEM #: LC52 pBOX'_i r aENawal.--C 9a n.ORANT a=ne � �n.rllroTE) V COVERS RALSED AT-914 3" OF F WASim GRACE 4"DA SCH 40 PVC -E BOTTGBI 12" TO BE &OITT®(S20 SL C - {ET AT SAN D/STC%._ IMf6FACE) 51 SOIL 124' _ - __- - -� A• SCH 40 PVC PIREMC. _ PE SCHEMATIC FLOW PROFILE DETAIL OF LEACHING CHAMBER OBSERVATION PORT NOT TO SCALE NOT TO SCA _ E AL_ INSTALLATIONS MUST CONFORM TO THE MNIMUM REOUMRfMENTS OF TITLE 5 m z 0 w 0 o PROPOSED 40 MIL < VINYL LINER ASSESSORS MAP 70 ~ PARCEL 93 O 2 D_ Y 0 5 G O V !! W 0 cn Z c� `J^ VJ ` I - 5 00 J� W O a U) w W > w J F ~ U) mw W U) SCALE 1.1 = 10' DRAWING FILE C19617-Cv.dwg DATE 03-17-2022 DRAWN BY DAV NOTE: CHECKED BY THE INFORMATION HEREON HAS BEEN PREPARED ACCORDING TO THE N BPM REQUIREMENTS OF TITLE 5 OF THE STATE ENVIRONMENTAL CODE FOR N SUBSUF=ACE DISPOSAL OF SANITARY SEWAGE AND LOCAL BOARD OF N HALTI'- REGULATIONS. O c ^ INSPECTION NOTE C2. THE STATE ENVIRONMENTAL CODE, TITLE 5, REQUIRES INSPECTION(S) m �+ • OF THE SEWAGE DISPOSAL SYSTEM BY THE DESIGN ENGINEER. "- INSTALLATION CONTRACTOR MUST NOTIFY THE DESIGN ENGINEER 4°Ii RIOR TO THE START OF INSTALLATION FOR DISCUSSION ON REQUIRED OF SHEETS INSPECTIONS. W @ m PROJECT NO. 0 C 19617.00