Loading...
HomeMy WebLinkAboutEngineer PlanSEPTIC TANK INSTALL RISERS & COVERS OVER INLET & OUTLET AND SET TO 6" OF FINISH GRADE T.O.F.=104.1 t -F.G. EL. 9 8t /-F.G. EL.=97.4t EXIS L=4' @ S=1% (MIN.) 4"SCH40 PVC 14' EXISTING Q. LIQUID INV.=95.62t LEVEL VERIFY GAS BAFFLE INV.=93.47 PROPOSED SEPTIC TANK NOTES: 1) CONTRACTOR SHALL VERIFY ALL EXISTING PIPE INVERTS, PRIOR TO INSTALLATION. 2) D-BOX SHALL BE SET LEVEL AND TRUE TO GRADE ON A MECHANICALLY COMPACTED SIX INCH CRUSHED STONE BASE, AS SPECIFIED IN 310 CMR 15.221(2). 3) INSTALL INLET & OUTLET TEES AS REQUIRED. 4) GAS BAFFLE TO BE INSTALLED ON OUTLET TEE AS MANUFACTURED BY TUF-TITE, ZABEL OR EQUAL. GENERAL NOTES: NOTE: TO PREVENT BREAKOUT, THE PROPOSED FINISH GRADE SHALL NOT BE < EL: 93.5 FOR A DISTANCE OF 15' AROUND THE PERIMETER OF THE S.A.S. PROPOSED D-BOX PROPOSED S.A.S. INSTALL RISER AND COVER INSTALL RISER & COVER OVER ONE CHAMBER(MIN.) SET TO WITHIN 6" OF FINISH AND SET TO WITHIN 3" OF FINISH GRADE TO SERVE GRADE AS AN INSPECTION MANHOLE. /-F.G. EL. =97.Ot F.G. EL.=97.0t CAA S=1% (MIN.) 4"SCH40 PVC 2" LAYIRR OF 1 /8" ® O ® TO 1 /2 DOUBLE 6 12 WASHED STONE (OR APFAOVED FILTER F PROPOSED '_ -//- D-BOX INV.=93.30 3' 3' 3 EFFECTIVE WIDTH = 9' DOUBLE 1WASHED y-90-RATED INV.=93.50 STONE W/INLET TEE USE 6 LC-5 LEACHING CHAMBERS IN SERIES WITH 3' OF DOUBLE WASHED STONE ON ALL SIDES H-20 RATED TOP CONC. ELEV.=94.33 _- --- - BREAKOUT INV. ELEV.=93.50 ®®®O ®®® ELEV.=94.0 BOTTOM ELEV.=92.50 3' 6x6'=36' 3' 4' OF NATURALLY OCCURRING PERVIOUS MATERIAL EFFECTIVE LENGTH = 42' 5' (MIN.) ABOVE G.W. BOTTOM OF TP, EL=84.8 = LEACHING SYSTEM SECTION SEPTIC SYSTEM PROFILE 1. ALL CHANGES TO THIS PLAN MUST BE APPROVED BY THE LOCAL BOARD OF HEALTH AND THE DESIGN ENGINEER. 2. ALL WORK AND MATERIALS SHALL CONFORM TO THE REQUIREMENTS OF THE STATE ENVIRONMENTAL CODE, TITLE V, AND ANY APPLICABLE LOCAL RULES AND REGULATIONS, EXCEPT AS REQUESTED BELOW: -310 CMR 15.405(1)(b): LOCAL UPGRADE APPROVAL 1) A 3' variance to max. depth of cover for up to 6' of cover. 3. THE SEWAGE DISPOSAL SYSTEM SHALL NOT BE BACKFILLED PRIOR TO INSPECTION AND APPROVAL BY THE BOARD OF HEALTH AND THE DESIGN ENGINEER. 4. ANY CONDITIONS ENCOUNTERED DURING CONSTRUCTION DIFFERING FROM THOSE SHOWN HEREON SHALL BE REPORTED TO THE DESIGN ENGINEER BEFORE CONSTRUCTION CONTINUES. 5. ALL ELEVATIONS BASED ON AN ASSUMED DATUM. 6. THE DESIGN ENGINEER IS NOT RESPONSIBLE FOR THE FAILURE OF THE CONTRACTOR OR OWNER TO NOTIFY THE LOCAL BOARD OF HEALTH FOR PROPER INSPECTIONS DURING CONSTRUCTION. 7. WATER SUPPLY PROVIDED BY TOWN WATER SERVICE. 8. THERE ARE NO WELLS WITHIN 150' OF THE PROPOSED S.A.S. 9. ALL AREAS CLEARED FOR CONSTRUCTION SHALL BE RESTORED AS AGREED UPON BY OWNER AND CONTRACTOR OR AS OTHERWISE DIRECTED BY THE APPROVING AUTHORITIES. 10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES, PRIOR TO BEGINNING CONSTRUCTION. 11. WHERE REQUIRED, CONTRACTOR SHALL REMOVE ALL UNSUITABLE SOILS IN THE AREA BENEATH AND FOR 5' ON ALL SIDES OF THE S.A.S. AND REPLACE WITH CLEAN SAND AS SPECIFIED IN 310 CMR 255(3). 12. AREAS REQUIRING STRIPOUT OF UNSUITABLE MATERIALS SHALL BE INSPECTED BY DESIGN ENGINEER PRIOR TO BACKFILL. 13. THIS PLAN IS TO BE USED FOR SEPTIC SYSTEM PURPOSES ONLY AND NOT CONSIDERED TO BE A PROPERTY LINE SURVEY. 14. THE ENGINEER IS NOT RESPONSIBLE FOR ANY UNDOCUMENTED SEPTIC SYSTEM COMPONENTS NOT SHOWN ON THE PLAN DESIGN CRITERIA NUMBER OF BEDROOMS: 3 BEDROOMS SOIL TEXTURAL CLASS: DESIGN PERCOLATION RATE: <2 MIN/IN DAILY FLOW: 330 GPD DESIGN FLOW: 330 GPD GARBAGE GRINDER: NO -AND NOT PERMITTED WITH THIS DESIGN LEACHING AREA REQUIRED: (330 GPD) = 445.9 SF .74 GPD/SF EXISTING SEPTIC TANK: 1000 GALLON CAPACITY, H-10 RATED PROPOSED DISTRIBUTION BOX: 1 INLET, 3 OUTLETS, H-20 RATED USE 6 LC-6 LEACHING CHAMBERS IN SERIES WITH 3' of DOUBLE WASHED STONE ON ALL SIDES SIDEWALL AREA: (9.0' + 42.0') x 2 x 1' = 102.0 SF BOTTOM AREA: 9.0' x 42.0' = 378.0 SF TOTAL AREA: ........................................................... 480.Q,,'jF= DESIGN FLOW PROVIDED: 0.74 GPD/SF(480.0 SF) �- 355.2 GPD SOIL LOG DATE: MARCH 30, 2023 SOIL EVALUATOR: ANNA WIMMER SE#14,615 WITNESS: JAY GARDNER IRS HEALTH AGENT ELEV. TP-1 DEPTH 96.8 0" FILL 94.4 Ab SANDY LOAM 10YR 3/2 93.6 6 MED. SAND 10YR 5/4 91.8 C1 MED. SAND 2.5Y 7/4 87.8 C1 FINE SAND 2.5Y 6/4 84.8 PER�CR-ATETFI��IA1,_$c C.-- NO GROUNDWATER ENC r S-L----- 4" KNOCKOUT 2W DIA. COVER I i 4" KNOCKOUT 4" KNOCKOUT I I I I 4' KNOCKOUT -7-----------J 29" 39" 60" 108" 144" "C" HORIZONS M f 72• `l PLAN VIEW r------- ® ® ® 0 ® ® ® 2 2 INVERT I 1z" I i 72" SIDE VIEW WIGGIN LC-6, H-20 LOADING LEACHING CHAMBER N.T.S. PROPOSED SEPTIC SYSTEM UPGRADE PLAN 382 NORTH MAIN STREET, SOUTH YARMOUTH, MA Prepared for: Francis Clarke, 382 North Main St, South Yarmouth, MA 02664 Engineering by: SCALE DRAWN JOB. NO. Engineering Works, Inc. N.T.S. P.T.M. 141-23 12 West Crossfield Road, Forestdale, MA 02644 DATE CHECKED SHEET NO. (508) 477-5313 4/5/23 P.T.M. 2 Of 2 --64-- EXISTING CONTOUR x 60.98 EXISTING SPOT GRADE —W— EXISTING WATER SVC. — EXISTING GAS SERVICE —� - OVERHEAD WIRES IS TEST PIT BENCHMARK LEGEND LCP 30101 C 94,78 `�S` 00'52'50" E 100.04' M. 97.64 EXISTING LEACH PIT TO BE PUMPED, FILLED WITH SAND & ABANDONED o 99,5 4N EXISTING SEPTIC TANK TOP OF TANK, EL.=95.97 IN V. (OUT)= 95.62f 1' 96.19 vi VENT. GREEN TENT HOUSE 96.72 .. ,t . 97,13 42�r" P.... O x ��" O _J 011 .:ARMM DECK TIO e mY E 7.6 MC6*4en=_' c H-y Thompson e5ue .n House Cape Cod �o-ate" PROPOSED S.A.S. 6 LC-6 UNITS SURROUNDED WITH 3' OF STONE, ALL SIDES l JJ ypJ X 9 E 9PEN 9758 0 +/ 1 EXISTING HOUSE(#382) T.O.F.=104.1t1 98.44 1+ 00. ! 00 10L37 101.48 LOT 51 02.26 1,175±-�5. F. COMBINED AREA 12, 615±S. F. __.o SMAP LE BENCHMARK TOP OF SONOTUBE EL. = 97.40 �02,23 32' ,102 59 • i° . � b.UU — N 00 43'10" E ..~ ►4"�'43'10" E 99,59 .STONE PARKING AREA APRON 100.26 99.86 99,57� ® 99.01 98.34 of M4ss9�y� o PETER T. McENTEE CIVIL 35109 NORTH MAIN STREET IT < r -�Ct N .3 w OWNER OF RECORD FRANCIS H. CLARKE 382 NORTH MAIN STREET SOUTH YARMOUTH, MA 02664 Yarmouth Health Department APPROVED name Date PLAN REFERENCE CERTIFIED PLOT PLAN BY BAXTER & NYE, DATED 9/8/76 MAP ID: 100-144 PROPOSED SEPTIC SYSTEM UPGRADE PLAN 382 NORTH MAIN STREET, SOUTH YARMOUTH, MA Prepared for: Francis Clarke, 382 North Main St, South Yarmouth, MA 02664 Engineering by: SCALE DRAWN JOB. NO. Engineering Works, Inc. 1 "=20' P.T.M. 141-23 12 West Crossfield Road, Forestdole, MA 02644 DATE CHECKED SHEET NO. (508) 477-5313 4/5/23 P.T.M. 1 Of 2