Loading...
HomeMy WebLinkAboutEngineer PlanSCHEDULE OF ELEVATIONS EXISTING 1 INV. OF PIPE AT FOUNDATION = BUILDING #� 1 2 INV. OF PIPE AT SEPTIC TANK INLET = 3 INV. OF PIPE AT SEPTIC TANK OUTLET = 4 INV. OF PIPE AT FAST TANK INLET = 5 INV. OF PIPE AT FAST TANK OUTLET = 6 INV. OF PIPE AT D-BOX INLET = 7 INV. OF PIPE AT D-BOX OUTLET = 8 INV. OF PIPE AT LEACHING FIELD INLET = 9 BOTTOM OF LEACHING FIELD = 10 TOP OF STONE = 11 FINISHED GRADE OVER LEACHING FACILITY = 12 FINISHED GRADE OVER D-BOX = 13 FINISH GRADE OVER SEPTIC TANK = 14 FINISH GRADE OVER EXISTING SEPTIC TANKS = 15 FINISH GRADE AT FOUNDATION = I EXISTING OUTLET CONCRETE BAFFLE TO BE REPLACED WITH 4" PVC OUTLET "T". CONTRACTOR SHALL CONFIRM EXISTING INVERT ELEVATION PRIOR TO INSTALLATION OF SYSTEM 15 34.5 - 34.0 14 34.0± UE- EXISTING ' BUILDING SEWER TO JEMAIN P 4 30.45 TANK #1 30.15 TANK #2 3 1 EXISTING * *TO BE CONFIRMED L I EXISTING SEPTIC PIPE, REPLACE WITH PVC SCH. 40 AS NEEDED. in SCH. 40 PVC TEES r; GAS BAFFLE SEWAGE SYSTEM PROFILE & DETAILS NOT TO SCALE PROPOSED 4" PVC TEES AND SEWER PIPE. CONTRACTOR SHALL CONFIRM EXISTING INVERT ELEVATION PRIOR TO INSTALLATION OF SYSTEM BLOWER UNIT TO BE -COVER SET TO LOCATED AWAY FROM DWELLING 13 33.2± (SUB -SURFACE INSTALLATION) FINISH GRADE COVER SET TO WITHIN 6" OF FINISH GRADE 1 1 EXISTING j-L. PROPOSED 1,500 GALLON LOW 2 1 EXISTING EXISTING SEPTIC TANK TO BE PROFILE FAST TANK, INTERNAL INSPECTED AND TO REMAIN IF MOUNT MICROFAST MODEL 0.5 & FOUND IN WORKING CONDITIONS. MODEL 0.9 (H-10 LOADING), USE REPLACE IF DETERMINED TO BE ACME PRECAST UNIT OR EQUAL INADEQUATE WITH A 1,500 GALLON H-10 LOADING TANK. * EXISTING BUILDING SEWER NOTES 1 - SEPTIC PIPE INVERT ELEVATIONS TO BE CONFIRMED PRIOR TO CONSTRUCTION. 2 - CONTRACTOR SHALL INTERCEPT EXISTING SEWER WITH NEW 4" PVC IN CONFORMANCE WITH TITLE 5. / p %� L J °a m m� ch U rnrn I 00 / - / - - �% 1 / 5:-n `` ' ' III S D/ z / ry Q O p / Z&3 !! / / / / z> i r co Lk X, FAST VENT AND BLOWER UNIT, LOCATION TO BE DETERMINED IN 31.7 FIELD PER OWNER (TYP. OF 2) i 31.9 n 0 �' I 1,500 GALLON FAST / /x 32.5 " 30.9 SAS #1: THREE(3) 500 GALLON Z / TANK "1" w/ MICROFAST S 3�4� x 31.7 CHAMBERS: 37.5' x 10.83' x 2' I Q 0 ii l / INSERT MODEL 0.5 ;c 32 28 81Q I 37 5 T 28,2 � --/ ' �_ x % I WATER METER PIT X32.3; -�'----1 u c11 / REMOVE ALL UNSUITABLE MATERIAL WATER METER PIT 0 31-9x DOWN TO "C" SOIL &REPLACE w/ j / (_9 69 O o 5(3), AS0 CLEANOARSE NECESSARY (TYPICAL) T CIVIR SAND PER 310 5O (/ S♦ \� 38' 15'MIN. i i >C / 33.4 / 0 `v) -C 14 0 30. W a f / CLEAN OUT 0} O x33.0 �, C x 31.Ox Q if l I ° I i / I EXISTING TREATMENT x 34.0 O o �_ 34.1x 15'M1, / SEPTIC TANK TO REMAIN i -� a� BREAKOUT / (TYPICAL OF 3) O i DECK ,�� ( �o, '- mj - - p 31.Ox CLEAN OUT 77.3- o S S #2: EIGHT (8) 500 GALLON i CLEAN OUT j AMBERS: 75.33' x 10.83' x 2' i' GV 4" PVC SCH. 40 'o x33. / 4" PVC SCH. 40 r DCK -� L=51 L.F. CO �I / 33.7 L=16 L.F. - - CONC / P NC. DFC / 1,500 GALLON FAST pqT/O AT �, - K = 32 2 u- EXISTI LEACHING PITS TO BE PUMPED 1\ TANK "2" w/ MICROFAST REMOV D & DISPOSED OF OFF SITE AS i b INSERT MODEL 0.9 / x 31.( NECESS RY FOR CONSTRUCTION, \ -U� 33.19x / F.�(/STD (APPRO (MATE LOCATION) (TYPICAL) J -I VVODO41 L//toS1-OR U `� K29.6 '_' i l / TP#1 / r ll(12 BOOR NG #� �cK �D STOR o o �,n J� 14.6 / U / MS,rOTq� *29.6 / SHED x 32.9 / - 1 x32.2 -G- l SH FM c x 27.2 \�� ti x 24.7 `ED Pq RFD SHED U _ 31.8 / i� -`f 9 fi x326 R R 7/MgE Frq/ FM� x 32.2 x 31. NING WgLt F'y� \ \` s>t O� _-- - - W - LL yV- I \ \ \ -OOP x 33.0 32.7 9.1 2 ij \ 34.2 II __- �- x32.t, 27.8 \ \ x25.1 \\ _ - x � � EXISTING WATER MAIN (APPROXIMATE LOCATION) a ^ - _ - \ �� TP#2\ \ x 33.5 x 33.6 x 33.3 -� 1 o - x 33.2 -33.5 S) CONC. I � �� x34.4/ �; 30.1 \\ SLAB x 32.7 x 33.6 DFC CONC ` ` c 30.0 \ y \ �N i i I x 32.4 k PgT/O \ x 2�.T w' x x 25.4 Z I x 32.4 x 33.1 x32.1 �� '3 \ 25.7 \ !`O Z �\ I x 34 .9 x 32.1 x 32.9 �� CO/VC. PA ONC x 30.9 \ \ c x 35 \ T/0 C N Q c'? x 33.4 AT/�C��C_ PA7 OC pA�No �2 3 \ " 28.4 Cp I ? m /%) DECK I x 33.5 P 770 CO/VC x ` x 28.3 qT/O. qT/0 1 O -33.5 x 34.1 ��Q` x 30.1 CONC. ' ®! ,,` �35.oe ,�p�� WOOD LNG 2 ST \ x 28.,,1 -2 .1 SLAB �` '��' t'O � _ / F B(//CD/ CRY \ fi x 34.1 - i , _ _ \\ FE�32 NG`s 30.2 , r / ELECTRICAL 34 c1 _ x 34.6 / 12 x35.0FM � 1 DECK / x�0.1 �. x33.9 x33.9 TELE I / i SERVICONE441 1 DECK S' co � UTILITIES NOTE: 5 130.20 TANK #1 29.90 TANK #2 S=0.01 MI = N L 69' (SAS #1) S=0.01 MIN L=38' (SAS #2) v 6 1 29.37 SAS #1 29.72 SAS #2 6" MIN. CRUSHED STONE BASE 12 1 33.1, 32.2 1 S=2% MINIMUM N H-20 D-BOX WITH SPEED LEVELERS NOTES: SEPTIC SYSTEM NOTES 1. FURNISH RISERS TO SET COVERS WITHIN 6 INCHES OF FINISH GRADE. 2. H-10 SEPTIC TANK AND CHAMBERS, (H-20) DISTRIBUTION BOX (D-BOX), AND SCHEDULE 40 PVC PIPE THROUGHOUT. 1. ALL CONSTRUCTION AND MATERIALS SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE, 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A TRENCH PERMIT FROM THE LOCAL MUNICIPALITY TITLE 5 (310 CMR 15.00), AND THE LOCAL BOARD OF HEALTH. IN WHICH THE WORK IS BEING PERFORMED. 4. BIO-MICROBICS MICROFAST: MASS DEP GENERAL USE APPROVAL, TRANSMITTAL NUMBER X232831. 2. THERE SHALL BE NO CHANGES MADE IN THIS PLAN WITHOUT THE WRITTEN PERMISSION OF THE ENGINEER AND LOCAL BOARD OF HEALTH. 11 32.3 - 31.0 SAS#1 RISER AND COVER TO BE SET TO 33.0 - 31.0 SAS#2 3. ALL ERRORS, OMISSIONS, AND CHANGE OF CONDITIONS AT THE SITE SHALL BE BROUGHT TO THE WITHIN 6" OF FINISHED GRADE & SERVE AS INSPECTION PORT FILTER FABRIC � 10 29.8 SAS #1 30.0 AS #2 BACK FILL WITH FIRST 2' SHALL 9" MIN. 36" MAX. BE SET LEVEL CLEAN MATERIAL - S=0.01 L=VARIES, T - 35' J= LU OO O O O® N W - O O O O O O O= W 000000 �o - w PRECAST 500-GALLON CHAMBERS �- 29.20 SAS #1 (H-20 LOADING) 29.55 SAS #2 7 8 9 1. CONTRACTOR SHALL CONTACT DIG -SAFE AND HAVE ALL UNDERGROUND UTILITIES WITHIN THE AREAS ADJACENT TO THE PROPOSED WORK MARKED PRIOR TO ANY EXCAVATION. 2. UNDERGROUND UTILITY ALIGNMENTS SHOWN ON THE PLANS DEPICT APPROXIMATE LOCATIONS AND ARE NOT A ACTUAL REPRESENTATION OF EXISTING CONDITIONS. 0 10 20 40 SCALE: 1" = 20' 8 9 1. CONTRACTOR SHALL CONTACT DIG -SAFE AND HAVE ALL UNDERGROUND UTILITIES WITHIN THE AREAS ADJACENT TO THE PROPOSED WORK MARKED PRIOR TO ANY EXCAVATION. 2. UNDERGROUND UTILITY ALIGNMENTS SHOWN ON THE PLANS DEPICT APPROXIMATE LOCATIONS AND ARE NOT A ACTUAL REPRESENTATION OF EXISTING CONDITIONS. 0 10 20 40 SCALE: 1" = 20' 9 1. CONTRACTOR SHALL CONTACT DIG -SAFE AND HAVE ALL UNDERGROUND UTILITIES WITHIN THE AREAS ADJACENT TO THE PROPOSED WORK MARKED PRIOR TO ANY EXCAVATION. 2. UNDERGROUND UTILITY ALIGNMENTS SHOWN ON THE PLANS DEPICT APPROXIMATE LOCATIONS AND ARE NOT A ACTUAL REPRESENTATION OF EXISTING CONDITIONS. 0 10 20 40 SCALE: 1" = 20' 1. CONTRACTOR SHALL CONTACT DIG -SAFE AND HAVE ALL UNDERGROUND UTILITIES WITHIN THE AREAS ADJACENT TO THE PROPOSED WORK MARKED PRIOR TO ANY EXCAVATION. 2. UNDERGROUND UTILITY ALIGNMENTS SHOWN ON THE PLANS DEPICT APPROXIMATE LOCATIONS AND ARE NOT A ACTUAL REPRESENTATION OF EXISTING CONDITIONS. 0 10 20 40 SCALE: 1" = 20' ATTENTION OF THE ENGINEER PRIOR TO PERFORMING THE RELATED WORK. 4. ALL DISTURBED AREAS ARE TO BE LOAMED, SEEDED AND MAINTAINED TO PREVENT EROSION. 5. FOR PROPER PERFORMANCE, SEPTIC TANK SHOULD BE INSPECTED AT LEAST ONCE A YEAR AND WHEN THE TOTAL DEPTH OF SCUM AND SOLIDS EXCEEDS 1/3 THE LIQUID DEPTH OF THE TANK, THE TANK SHOULD BE PUMPED. 6. THIS SYSTEM HAS BEEN DESIGNED FROM DATA REVIEWED AND ACKNOWLEDGED BY THE MASS. 15' MIN. BREAKOUT GRADE D.E.P. AND THE LOCAL BOARD OF HEALTH; AND CONFORMS WITH THE REQUIREMENTS OF THE STATE ENVIRONMENTAL CODE, TITLE 5. NO GUARANTEE OF PERFORMANCE IS EXPRESSED OR IMPLIED. 7 TEST HOLE INFORMATION SHOWN HEREON IS LIMITED TO SOIL CONDITIONS FOUND AT THAT PARTICULAR TEST HOLE LOCATIONS AND IS NOT CONSIDERED AN IMPLIED OR EXPRESSED WARRANTY OF SOIL CONDITIONS BEYOND LIMITS OF SUCH TEST HOLES. CONTRACTOR SHALL CONTACT ENGINEER TO ASSESS 8. ALL ORGANIC AND UNSUITABLE MATERIAL MUST BE REMOVED FROM THE AREA DIRECTLY UNDER EXISTING SOIL MATERIAL PRIOR TO INSTALLATION OF AND 5 FEET BEYOND THE PROPOSED LEACHING FACILITY. THIS AREA MUST BE BACKFILLED TO THE LEACHING SYSTEMS. UNSUITABLE MATERIAL ELEVATIONS INDICATED ON THESE PLANS WITH SELECT ON -SITE OR IMPORTED SOIL MATERIAL, ENCOUNTERED DURING INSTALLATION SHALL BE CONSISTING OF CLEAN GRANULAR SAND OR OTHER GRANULAR MATERIAL, FREE FROM ORGANIC REMOVED - REFER TO SEPTIC SYSTEM NOTE 8 MATTER AND OTHER DELETERIOUS SUBSTANCES. MIXTURES AND LAYERS SHALL NOT BE USED. THE FILL MATERIAL SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE TITLE 5 - 310 CMR SAS #1: USE (3) 500-GALLON CHAMBERS WITH DOUBLE WASHED CRUSHED STONE: 48" AT ENDS, 36" ALONG SIDES AND 24" BETWEEN EACH CHAMBER. EFFECTIVE DIMENSIONS: LENGTH=37.50', WIDTH = 10.83', HEIGHT = 2.0' SAS #2: USE (6) 500-GALLON CHAMBERS WITH DOUBLE WASHED CRUSHED STONE: 48" AT ENDS, 36" ALONG SIDES, AND 44" BETWEEN EACH CHAMBER. EFFECTIVE DIMENSIONS: LENGTH=77.33', WIDTH = 10.83', HEIGHT = 2.0' SECTION 15.255 (3) AND SHALL HAVE PERCOLATION RATE OF BETWEEN TWO AND FIVE MINUTES PER INCH, BEFORE AND AFTER PLACEMENT. 9. ALL STONE MUST BE DOUBLE WASHED AND FREE FROM FINES AND ANY ORGANIC MATERIAL AND MUST HAVE LESS THAN 0.2 PERCENT MATERIAL FINER THAN A NUMBER 200 SIEVE. 10. THE DESIGNER HAS NOT BEEN RETAINED BY THE CLIENT TO CONSTRUCT OR SUPERVISE THE CONSTRUCTION OF THE SYSTEM. THE CONTRACTOR IS RESPONSIBLE FOR MAKING ARRANGEMENTS FOR INSPECTION OF INSTALLATION OF THE SYSTEM WITH THE LOCAL BOARD OF HEALTH. 11 THEGENERAL CONTRACTORIS RESPONSIBLE FOR ALL HORIZONTAL AND VERTICAL CONTROL OF DESIGN DATA LCOMPONENTS. 1. TYPE OF ESTABLISHMENT: MULTI -FAMILY RESIDENCE (12-BEDROOMS TOTAL) 12. TIGHT JOINT PIPING MATERIAL TO CONSIST OF POLYVINYL CHLORIDE (P.V.C_) SCHEDULE 40, UNLESS OTHERWISE NOTED. SEWAGE SYSTEM #1 DESIGN FLOW: 110 GALLONS PER BEDROOM = 110 x 4 = 440 GPD SEWAGE SYSTEM #2 DESIGN FLOW: 100 GALLONS PER BEDROOM = 110 x 8 = 880 GPD 13. THE CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER FOR CONSTRUCTION INSPECTION AFTER EXCAVATION FOR THE LEACHING BED (PRIOR TO THE PLACEMENT OF STONE) AND ALSO AFTER 2. NOTE: PROPOSED SEPTIC SYSTEMS ARE NOT DESIGNED FOR A GARBAGE GRINDER PLACEMENT OF PIPE & STONE PRIOR TO BACKFILLING. 3. EXISTING SEPTIC TANKS TO REMAIN AND SERVE AS THE 200% VOLUME TANKS 14. DESIGN ENGINEER SHALL CERTIFY CONSTRUCTION OF SYSTEM AND MATERIALS INSTALLED. THE ADD 1,500 GALLON FAST TANK UNITS TO SERVE AS 100% VOLUME TANKS CONTRACTOR SHALL PROVIDE A SIEVE ANALYSIS OF THE FILL MATERIAL REQUIRED. AN AS -BUILT (USE MICROFAST INSERT MODEL 0.5 FOR SYSTEM #1, MODEL 0.9 FOR SYSTEM #2) PLAN SHALL BE SUBMITTED TO THE LOCAL BOARD OF HEALTH UPON COMPLETION. 4. DESIGN PERCOLATION RATE: ASSIGNED LESS THAN 5 MINUTES PER INCH 15. NO RUBBER TIRE CONSTRUCTION MACHINERY SHALL DRIVE OVER THE PROPOSED SEPTIC BED 5. SOIL ABSORPTION SYSTEM TYPE: CHAMBER SYSTEM EXCAVATION DURING CONSTRUCTION. 6. SYSTEM #1 LEACHING AREA REQUIRED: MINIMUM 440 GPD / (0.74 GPD/S.F., CLASS I SOIL) = 595 S.F. 16. DIG -SAFE AND ALL OTHER NECESSARY AUTHORITIES SHALL BE NOTIFIED FOR THE PROPER SYSTEM #2 LEACHING AREA REQUIRED: MINIMUM 880 GPD / (0.74 GPD/S.F., CLASS I SOIL) = 1,189 S.F_ LOCATION OF EXISTING UTILITIES PRIOR TO ANY EXCAVATION. 7. PROPOSED LEACHING SYSTEM #1: 37.5' LONG x 10.83' WIDE x 2' HIGH SYSTEM 17. WATER SERVICE LINE SHALL BE LOCATED AND MARKED PRIOR TO ANY EXCAVATING AND 10' MIN. BOTTOM AREA PROPOSED = 10.83' x 37.5' = 406 S.F. SETBACK DISTANCE FROM SAID SERVICE TO THE SEPTIC SYSTEM SHALL BE MAINTAINED. SIDE AREA PROPOSED = 2 x (10.83' + 37.5') x 2' = 193.3 S.F. 18. ALL WATER LINES WITHIN 10' OF SEPTIC SYSTEM COMPONENTS SHALL BE SLEEVED WITHIN 4" PVC TOTAL AREA PROPOSED = = 599 S.F. SCHEDULE 40 PIPE. 19. DESIGN ENGINEER SHALL SET A SITE BENCH MARK PRIOR TO CONSTRUCTION. PROPOSED SYSTEM #1 CAPACITY = 599 S.F. x 0.74 GPD/S.F_ = 443 GPD MICROFAST NOTES 9. PROPOSED LEACHING SYSTEM #2: 77.33' LONG X 10.83' WIDE X 2' HIGH SYSTEM BOTTOM AREA PROPOSED = 10.83' X 77.33' = 837.5 S.F. SIDE AREA PROPOSED = 2 X (10.83' + 77.33') X 2' = 352.6 S.F. 1. BLOWER MUST BE WITHIN 100 FEET (30.5m) OF FAST UNIT AND USE A MAXIMUM OF 4 ELBOWS IN THE PIPING SYSTEM (@ 100 FT.) FOR DISTANCES GREATER THAN 100 FT - CONSULT FACTORY. TOTAL AREA PROPOSED = = 1,190.1 S.F. BLOWER BASE MUST BE LOCATED ABOVE NORMAL FLOOD LEVELS. PROPOSED SYSTEM #2 CAPACITY = 1,190.1 S.F. X 0.74 GPD/S.F. = 881 GPD 2. VENT TO BE LOCATED ABOVE FINISH GRADE OR HIGHER TO AVOID INFILTRATION. CAP WITH 6" SOIL EVALUATOR'S LOG VENT GRATE W/AT LEAST 7.1 SQ. IN. OPEN SURFACE AREA. SECURE WITH STAINLESS STEEL OR• Depth from surface in inches Soil Horizon Soil Texture (USDA) Soil Color (Munsell) Soil Mottles and Depth Other Relative Factors DEEP OBSERVATION HOLE TP#1, ELEVATION 24.0, ASSIGNED DATUM 0-36 FILL 36 - 60 B MEDIUM SAND 7.5 YR 6/6 SINGLE GRAIN DEEP OBSERVATION HOLE TP#2, ELEVATION 26.0, ASSIGNED DATUM 0 - 32 FILL 32 - 36 Ab SANDY LOAM 7.5 YR 3/3 36 - 51 B SANDY LOAM 10 YR 5/6 51 - 120 C MEDIUM SAND 2.5 Y 6/6 SINGLE GRAIN RUN VENT TO DESIRED LOCATION AND COVER OPENING WITH 3" VENT GRATE W/AT LEAST 7.1 SQ. IN. OPEN SURFACE AREA. SECURE WITH STAINLESS STEEL CREWS. VENT MUST NOT ALLOW EXCESS MOISTURE BUILDUP OR BACK PRESSURE. 3. ALL APPURTENANCES TO FAST (e.g. SEPTIC TANK, PUMPOUTS, ETC.) MUST CONFORM TO ALL COUNTY, STATE, PROVINCE, AND LOCAL CODES. 4_ LOWER CONTROL SYSTEM BY BIO-MICROBICS, INC. 5. COPYRIGHT (C) 2001, BIO-MICROBICS, INC. 6. MUST INCREASE TANK SIZE BY 20% IF MINIMUM OF 10 INCHES IS USED BETWEEN THE UNIT AND THE BASE OF TANK. CONSULT FACTORY FOR APPROVAL. 7. THE PRIMARY COMPARTMENT MAY BE A SEPARATE TANK. 8_ FOUR LEG EXTENSIONS MAY BE USED TO STAND UNIT IN TANK ELIMINATING NEED FOR LID. 9. EITHER THE INFLUENT PIPE TEE SHALL BE FITTED WITH A PIPE CAP OR THE BAFFLE SEPARATING PERCOLATION RATE _ < 2 MINUTES / INCH THE TWO ZONES SHALL BE EXTENDED ALL THE WAY TO THE TOP OF THE CONCRETE TANK. IF DEPTH TO GROUNDWATER = NO GROUNDWATER ENCOUNTERED @ 120"± CHOOSING TO USE THE PIPE CAP, THEN THE BAFFLE SHALL BE AT LEAST 3" HIGHER THAN THE OBSERVATIONS BY: LARRY CARREIRO WATER LEVEL AS SHOWN ON THE DRAWING. WITNESSED BY: A. VAN HONE DATE TESTED: AUGUST 11, 2016 -\NOF�{Iq ODN. DOUGLAS Qz RAU( yG SCHNEIDER L�D1-RtvERA m v CIVIL Yarmouth Health �'*ltrtlttment No. 47383 p ca DD �j U NO 46845 �1 1tU • I,gROFESSI�NPDQ� �'P �FG/ST�R�V �kQ' suRvti'� o� �? �--� FSSI q1- ENG Nam Date NOTICE THIS PLAN MAY NOT BE ADDED TO, DELETED FROM, OR ALTERED IN ANY WAY BY ANYONE OTHER THAN CAPE & ISLANDS ENGINEERING, INC- UNLESS AND UNTIL SUCH TIME AS AN ORIGINAL (RED) STAMP APPEARS ON THIS PLAN NO PERSON OR PERSONS MUNICIPAL OR PUBLIC GENERAL NOTES OFFICIAL MAY RELY UPON THE INFORMATION CONTAINED HEREIN; AND THIS PLAN REMAINS THE PROPERTY OF CAPE AND ISLANDS ENGINEERING, INC_ LOCATIONSARE BASED ON AN "ON THE GROUND" INSTRUMENT SURVEY AND ELEVATIONS BASED ON COPYRIGHT (C) BY CAPE & ISLANDS ENGINEERING, INC. ALL RIGHTS RESERVED THE (NGVD) NATIONAL GEODETIC VERTICAL DATUM DATUM: U.S. SURVEY FEET. 4-27-23 ADD WATER METER PIT- ADJUST SYSTEM LOCAITON LAC RLR DIMENSIONS OF EXISTING BUILDINGS AND BUILDING OFFSETS SHOWN HEREON ARE TO CORNER BOARDS OR SIDING EXTENTS AND ARE DISPLAYED IN ENGINEERING UNITS WITH A PRECISION OF ONE DATE DESCRIPTION Drawn Checked TENTH (0.1') OF A FOOT. R E V I S 10 N S THE FINISHED FLOOR ELEVATION (FIN. FL. EL.) SHOWN HEREON IS BASED ON AN ASSUMED 1" LOWER THAN THE SURVEYED THRESHOLD ELEVATION. AN INTERIOR INSPECTION OF BUILDINGS WAS NOT PLAN PERFORMED. ZONING DISTRICT: R-40 & AQUIFER PROTECTION DISTRICT OF PROPOSED SEWAGE DISPOSAL SYSTEM REPAIR PREPARED FOR PROPERTY IS LOCATED WITHIN AN AREA HAVING A ZONE DESIGNATION OF X - MINIMAL HAZARD ZONE BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA), ON FLOOD INSURANCE RATE MAP NO. HORSE POND CORPORATION 25001C0586j, WITH A MAP EFFECTIVE DATE OF JULY 16, 2014. #300 BUCK ISLAND ROAD, BUILDING #11 THIS LOT IS NOT WITHIN THE WINDBORNE DEBRIS REGION (ONE MILE FROM SHORELINE) AS SHOWN ON IN THE FALMOUTH HIGH WIND DISTRICT MAP. WEST YARMOUTH, MA. THIS LOT IS PARTIALLY LOCATED WITHIN A DEP APPROVED ZONE II WELLHEAD PROTECTION AREA. THIS LOT IS NOT MAPPED WITHIN A MESA NATURAL HERITAGE AND ENDANGERED SPECIES AREA. SCALE: 1 "=20' DATE: JANUARY 30, 2023 WIND EXPOSURE CATEGORY: ZONE C CAPE & I S L AIV D S PLAN REFERENCE: PLAN BOOK 32462 E N G I N E E R I N G OWNER: HORSE POND CORPORATION SUMMERFIELD PARK800 FALMOUTH ROAD SUITE 301C 508.477.7272 PHONE 800 FAL ROAD 300 BUCK ISLAND ROAD E, MA 2649 508.477.9072 FAX www.CapeEng.com YARMOUTH, MA DRAWN: LAC CHECKED: RLR ASSESSORS INFORMATION: 47 / 97 1 SHEET 1 OF 1 28.95 SAS #1 NOTE: SOIL EVALUATION TO BE PERFORMED AT TIME OF + 29.20 SAS #2 INSTALLATION BY THE ENGINEER AND 26.95 SAS #1 WITNESSED BY A TOWN OF YARMOUTH BOARD OF HEALTH AGENT 27.20 SAS #2 POND HIGH WATER ELEV. = 17±' RIEGICIVEID MAY 2 2 2023