HomeMy WebLinkAboutWater Level Computation Permit Number: Date: /`/ • /r'
Completed by: /. ,, . I""1 �'c�-C- + ti_.:.._
HIGH GROUND-WATER LEVEL COMPUTATION
Site Location: - \f/4",— + 1 _) J -7 Lot No.
Owner: Z/ (<'. 1-0 ? 72 A L)i Q Address:
Contractor: s +'._>%2-`f Address:
Notes:
STEP 1 Measure depth to water table
to nearest 1/10 ft. Date V/- ' '? '7- 0
month/ ay/year
4=. STEP 2 Using Water-Level Range Zone
and Index Well Map locate
site and determine:
OAppropriate index well.......... / SW
• UB Water-level range zone
air- STEP 3 Using monthly report "Current
Water Resources Conditions"
ifs determine current depth to �J
water level for index well .... 4f 37 Jo- 1
month/year
STEP 4 Using Table of Water-level Adjustments
for index well (STEP 2A), current depth
k 'a
to water level for index well (STEP 3),
•
and water-level zone (STEP 2B)
•
determine water-level adjustment
STEP 5 Estimate depth to high water
by subtracting the water-
level adjustment (STEP 4)
from measured depth to water
level at site (STEP 1) 9
Figure 14. Suggested computation form.
5
rf�
13
•0 ti