Loading...
HomeMy WebLinkAboutC4 Details & Notes (6.6.23)ROADWAY PAVEMENT SECTION: DRIVEWAY PAVEMENT SECTION: WOODEN GUARDRAIL SECTION: w z w V) 2' (MIN. oQ�`\NF���.1 v 3 ti�P�S GAS MAIN - CABLE/ELECTRIC LINES 9 1/2" DENSE GRADE CRUSHED STONE BASE ((2) 4 3/4" LIFTS)* (MIN) 4" CLEAN SAND (SUB -BASE) ALL ROADWAY FILL SHALL BE CLEAN SAND PLACED IN (MAX) 6" LIFTS AND COMPACTED TO 95% DENSITY AS DETERMINED BY THE MODIFIED PROCTOR TEST (*SEE BELOW NOTES FOR SPECIFICATIONS ON ROAD CONSTRUCTION WITHIN ROUTE 6A STATE HIGHWAY LAYOUT) STATE HIGHWAY LAYOUT PAVEMENT NOTES: • PROPOSED ROADWAY (WITHIN SHLO) SHALL HAVE AN 8" GRAVEL BASE THAT HAS BEEN MACHINE COMPACTED THEN PAVED WITH 4" OF HOT MIX ASPHALT (HMA) LAID IN TWO COURSES CONSISTING OF A 2-1/2" BINDER COURSE AND A 1-1/2" FINISH COURSE. • ANY EXISTING HMA BERM THAT EXISTS WITHIN THE PROPOSED DRIVEWAY MUST BE SAWCUT AND REMOVED. THE NEW PAVEMENT MUST TIE INTO, AND NOT OVERLAP, THE EDGE OF THE HARDENED SURFACE OF THE ROADWAY. ALL ABUTTING EDGES OF THE EXISTING PAVEMENT SHALL BE COATED WITH A HOT POURED JOINT SEALER IMMEDIATELY PRIOR TO THE PLACEMENT OF THE HMA. M1 DRAINAGE FACILITY SECTION: NOT TO SCALE erm 24"x24" Cast Iron Frame and Grate Raised to Grade Use EJIW LF248-2 OR EQUAL 12" IAM. HDPE @ 1% PITCH 51.3 24" Diam. Cast Iron Frame and Cover Raised to Grade Use EJIW LK 110A or Equal 12" IAMrE09 )PITrCH w z w 0 V) TYPICAL WOODEN GUARDRAIL mA " TOPSOIL 8" WATER MAIN 5' MINIMUM SEPARATION FROM ALL DRAINAGE STRUCTURES NOT TO SCALE REQUIRED ACCESS PRUNING ZONE (12' TALL X 14' WIDE) 10' (ACCESS) yl 2' 20' (PARKING) 2' �P 1/4" PER FOOT PITCH X/, �P 1" FINISH COVER (ROLLED) 1.5" BINDER COURSE (ROLLED) 4" DENSE GRADE CRUSHED STONE BASE (14' WIDE) (MIN) 4" CLEAN SAND (SUB -BASE) ALL DRIVEWAY FILL SHALL BE CLEAN SAND PLACED IN (MAX) 6" LIFTS AND COMPACTED TO 95% DENSITY AS DETERMINED BY THE MODIFIED PROCTOR TEST HOT MIX ASPHALT NOTES: • ALL HOT MIX ASPHALT (HMA) PAVEMENT SHALL BE CONSTRUCTED PER MASSDOT'S 2023 STANDARDS AND SPECIFICATIONS FOR HIGHWAYS AND BRIDGES, SUBSECTION 460: HOT MIX ASPHALT PAVEMENT FOR LOCAL STREETS. • EACH HMA PAVEMENT COURSE SHALL BE COMPRISED OF ONE OF THE MIXTURE TYPES LISTED ON TABLE 460.10-1, SUBSECTION 460. Berm M 1 Dry Water Quality Swale SEE SWALE NOTES 12" DIAM. HDPE @ 1% PITCH 50.8 RIM=50.01/ sn BOTTOM=48.5 in ul n En 4' 4' m I. Solid 4' Dia. Solid 4' Dia. CDS 2015-4 Catch Basin Manhole Treatment Unit USE H-20 USE H-20 USE H-20 AS MANUFACTURED BY AS MANUFACTURED BY AS MANUFACTURED BY SHOREY OR EQUAL SHOREY OR EQUAL CONTECH ENGINEERED SOLUTIONS, LLC. (SEE CDS DETAIL SHEET) M2 DRAINAGE FACILITY SECTION: NOT TO SCALE 24" Diam. Cast Iron Frame and Cover Raised to Grade 24"x24" Cast Iron Frame and Grate Use EJIW LK 110A or Equal Raised to Grade Use EJIW LF248-2 OR EQUAL 30' RIP -RAP SPLASH PAD SEE RIP -RAP DETAIL DRIVEWAY NOTES: • IN ORDER TO ALLOW SAFETY VEHICLE ACCESS TO DRIVEWAYS, ALL DRIVEWAYS SHALL BE 10' WIDE WITH 2' GRASSED SHOULDERS ON EACH SIDE (2% MAX. GRADE). • GRASSED SHOULDERS SHALL BE UNDERLAIN WITH CRUSHED STONE BASE, AS SHOWN, TO PROVIDE ADDITIONAL SLOPE STABILITY FOR SAFETY VEHICLE ACCESS. • VEGETATION SHALL BE PRUNED TO ALLOW A 14' WIDE, 12' TALL ACCESS WAY. NOT TO SCALE APRON DETAIL: NOT TO SCALE ROUTE 6A on[ 20'---)/ MIN. ACCESS TO CONSTRUCTION SITE if (4) 3/4" Galvanized Bolt & Nut Fasteners, per post 6 Wood Posts RON SHALL BE THICK LAYER HED STONE. E UNDERLAIN IC. MINIMUM S SHOWN. DRAINAGE CONSTRUCTION NOTES: 1.) ALL COMPONENTS, SUBJECT TO WHEEL LOADS, SHALL BE RATED H-20. 2.) ALL WORKMANSHIP PROVIDED SHALL BE IN CONFORMANCE WITH THE TOWN OF YARMOUTH PLANNING BOARD & ENGINEERING SPECIFICATIONS. 24" Diam. Cast Iron Frame and Cover 24"x24"x4" Tall'Beehive' Raised to Grade (ALL 5 UNITS) 3.) ANY MODIFICATIONS AND/OR DEVIATIONS FROM THE PLANS SHALL BE REVIEWED Cast Iron Frame and Grate Use EJIW LK 110A or Equal AND APPROVED BY THE ENGINEERING DEPARTMENT. Raised to Grade FILTER FABRIC (GEOTEXTILE) Use EJIW 1020-01 OR EQUAL AROUND TOP AND SIDES Lf CATCH BASIN AND LEACHING NOTES: 18" MAX. WATER DEPTH ° - _ - _ 1.) ALL PROPOSED CATCH BASINS, LEACHING GALLERIES, AND TRENCHING ACROSS - - PARKING AREAS AND SIDEWALKS SHALL BE BACKFILLED, AND COMPACTED IN 6-INCH - _ - = 1-1/2" WASHED STONE LIFTS. COMPACTION SHALL MEET 95% STANDARD PROCTOR REQUIREMENTS. ALL 12" DIAM. HDPE @ 1% PITCH s _ - BACKFILL MATERIAL SHALL BE DENSE GRADED CRUSHED STONE WITH A MAX SIZE OF - - 3/4" OR ENGINEERED APPROVED EQUAL. 47.5 _ _ _ 6 - -4r _ 2.) THE LEACHING CHAMBERS SHALL BE SET FULLY INTO CLEAN SAND. DESIGN 46.8 - - - - - ENGINEER SHALL INSPECT THE SOILS AROUND AND BELOW THE LEACHING FACILITY - - - - PRIOR TO FACILITY INSTALLATION . - - 3.) ALL CAST IRON FRAMES AND SEALS FOR DRAINAGE COMPONENTS SHALL BE 4' m - - - - - - - FINISHED WITH MORTAR CEMENT. • + _ - _ - _ - _ 4.) CATCH BASIN GRATES SHALL BE PLACED OVER FILTER FABRIC UNTIL SITE IS PAVED - 67- _ _ _ _ _ _ _ _ _ _ _ _ _ _ WITH BINDER COARSE. CONTRACTOR IS RESPONSIBLE TO MAINTAIN THE FILTER FABRIC SO SEDIMENT DOES NOT GET INTO CATCH BASINS. 1000 Gallon 41.3 Solid 4' Dia. 5.) EXISTING CATCH BASIN ON ROUTE 6A SHOULD BE FITTED WITH SILT SOCK SO AS TO Catch Basin Leaching Pit (6'x6'0) PROTECT DRAINAGE DURING CONSTRUCTION OF THE ROADWAY. 6.) THE TWO CATCH BASINS AT STA 1+95.14 ON FAITH ROAD SHALL BE FITTED WITH USE H-20 USE H-20 CASCADE STYLE GRATES, IN ORDER TO HANDLE FAST-MOVING RUNOFF IN THE 6% AS MANUFACTURED BY SHOREY OR EQUAL AS MANUFACTURED BY SHOREY OR EQUAL SLOPE AREA OF THE ROAD. 28' x 14' x 6' Leaching Facility: ROOF RUN-OFF: (2) Pits, spaced 14' on center with 4' of 1-1/2" washed stone around and 6" below 1.) ALL ROOF GUTTERS SHOULD BE DIRECTLY CONNECTED TO LEACHING FACILITIES Berm M2 Dry ' rBerm RIM=38.2 RIM=38.6 RIM=38.4 Water Quality a I ity Swale 24" Diam. Cast Iron Frame and Cover > . ° SEE SWALE NOTES 24"x24"x4" Tall 'Beehive' Cast Iron Frame and Grate Raised to Grade (ALL 5 UNITS) Use EJIW LK 110A or Equal 12" IAM. HDPE @ 1% PITCH 12" IAM. HDPE @ 1% PITCH 12" DIAM. HDPE @ 1% PITCH Raised to Grade Use EJIW 1020-01 OR EQUAL FILTER FABRIC (GEOTEXTILE) AROUND TOP AND SIDES 35.7 35.4 ul 35.3 RIM=34.5 35.5 35.3 35.0 BOTTOM=33.0 18" MAX. WATER DEPTH En 20' ° - - - - - 1-1/2" WASHED STONE 4' m 4' m 12" DIAM. HDPE @ 1% PITCH + 9 RIP -RAP SPLASH PAD- SEE RIP -RAP DETAIL 32.0 31.5 � - - Solid 4' Dia. Solid 4' Dia. CDS 2015-4 � _-_ Catch Basin Manhole Treatment Unit Ln 4' 4' - - USE H-20 USE H-20 USE H-20AS MANUFACTURED BY AS MANUFACTURED BY AS MANUFACTURED BY 6" - - - - - - - - - SHOREY OR EQUAL SHOREY OR EQUAL CONTECH ENGINEERED Solid 4' Dia. 26.0 1000 Gallon SOLUTIONS, LLC. (SEE CDS DETAIL SHEET) Catch Basin Leaching Pit (6'x6'0) TYPICAL CATCH BASIN & MANHOLE SECTION: USE H-20 AS MANUFACTURED BY SHOREY OR EQUAL USE H-20 AS MANUFACTURED BY SHOREY OR EQUAL NOT TO SCALE 70' x 28' x 6' Leaching Facility: PIPE CONNECTIONS TO (10) Pits, spaced 14' on center with 4' of DRAINAGE NETWORK (TYR) 12" DIAM. HDPE 1-1/2" washed stone around and 6" below Solid 4' Dia. Solid 4' Dia. Solid 4' Dia. Catch Basin Manhole Catch Basin USE H-20 USE H-20 USE H-20 AS MANUFACTURED BY SHOREY OR EQUAL AS MANUFACTURED BY SHOREY OR EQUAL AS MANUFACTURED BY SHOREY OR EQUAL NOTE: ALL MANHOLE RIM AND INVERT ELEVATIONS ARE CALLED OUT ON THE C4- GRADING & DRAINAGE PLAN. STRAW WATTLE/EROSION CONTROL DETAIL: TYPICAL SECTION Fill 3" Height -Wood Stake FLOW DIRECTION traaww Wattle ! Existing Grade 1.) LIMIT OF WORK SHALL BE MADE UP OF A 9" DIAMETER STRAW WATTLE INSTALLED PER THE MANUFACTURERS SPECIFICATIONS. 2.) CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING EROSION/ RUNOFF DURING CONSTRUCTION. 3.) LIMIT OF WORK SHALL BE INSTALLED PRIOR TO ANY WORK BEING STARTED TRANSFORMER PAD DETAIL: NOT TO SCALE 1.) TYPICAL PAD -MOUNTED TRANSFORMER SHOWN IS FOR LAYOUT PURPOSES ONLY. EVERSOURCE TO PROVIDE 0 DESIGN LAYOUT AND SPECIFICATIONS FOR ALL ELECTRICAL UTILITY WORK. • • 0 2.) EACH UTILITY TRANSFORMER LOCATION SHALL BE SCREENED AS SHOWN ALONG THE SIDES AND BACK OF THE TRANSFORMER PAD, USING (6) OF THE SHRUB w • PLANTINGS SPECIFIED FOR THAT AREA OF THE 41. DEVELOPMENT ON THE LANDSCAPE PLAN. i 3' 3' i 3.) MAINTAIN A MINIMUM OF 3' SEPARATION BETWEEN PLANTINGS AND THE TRANSFORMER, TO ALLOW PROPER PERFORMANCE AND MAINTENANCE. I] I I 4.0' 4.) THE FRONT OF THE TRANSFORMER (THE SIDE FACING THE ROADWAY, WITH ACCESS DOORS) SHALL BE KEPT FREE OF SHRUBS, TO ALLOW ACCESS FOR MAINTENANCE. Transformer Pad Shrub Planting (Typ.) �#2936C M1 LEACHING PLAN VIEW: SCALE: 1"=20' 70' M2 LEACHING PLAN VIEW: 00 SCALE: 1"=20' 0 0 0 0 0- ROOF RUNOFF DOWNSPOUT SECTION: NOT TO SCALE PROPOSED 6" ADS HDPE'T' CONNECTION - PROPOSED 6" ADS HDPE 90° PROPOSED DOWNSPOUT (SEE ARCHITECTURAL PLANS FOR DETAILS AND LOCATIONS) ADS DOWNSPOUT ADAPTER FINISH GRADE MINIMUM 0% PITCH 6" ADS HDPE TO LEACHING RIP -RAP DETAIL FOR OUTFALL PIPE: NOT TO SCALE RIPRAP NOTES: 1.) RIP -RAP SHALL BE PLACED INTO CLEAN SAND, FREE OF SILT AND DEBRIS. 2.) RIP -RAP STONE SHALL BE 6" TO 8" STONE PLACED IN RANDOM PATTERN WITH UNEVEN SURFACE SO AS TO REDUCE DISCHARGE ENERGY. 3.) THE BED OF RIP -RAP SHALL BE 1.5 FEET THICK. 4.) RIP -RAP STONE SHALL BE LAID ON A DOUBLE LAYER OF FILTER FABRIC. 12' PERMEABLE SOIL (50% SAND, 50% LOAM) FILTER FABRIC 3/4" TO 1-1/2" STONE NATIVE SOIL SUB -BASE - FREE FROM LOAM / ORGANIC MATERIAL 6" ADS HDPE FROM ROOF PIPE SHALL EXTEND 12" INSIDE CHAMBERS ^'^ HDPE OUTFLOW PIPE 12" FLARED END SECTION :TAL OUTLET GUARD SPLASH PAD: 6" TO 8" STONE ON FILTER FABRIC USING 6" ADS PIPE 2.) EACH DWELLING SHALL UTILIZE A TOTAL OF (4) CULTEC RECHARGER 330XLHD STORMWATER LEACHING UNITS, SPLIT INTO (2) 10.5' x 6.33' LEACHING FACILITIES 3.) LEACHING FACILITIES SHALL BE SET WITHIN A CLEAN SAND BASE WITH ANY UNSUITABLE SOILS AND/OR ORGANIC MATERIAL REMOVED. CHAMBERS SHALL BE SURROUNDED BY 6" STONE ON TOP AND BOTTOM, 12' STONE ON SIDES. SEE ROOF RUNOFF LEACHING DETAIL. ACCESS ROAD: 1.) DURING CONSTRUCTION, A 20' WIDE STONE APRON SHALL BE CONSTRUCTED AT THE PROPOSED ENTRANCE FOR DUST/SILT CONTROL. 2.) STONE APRON SHALL REMAIN IN PLACE UNTIL THE ENTRANCE HAS BEEN PAVED PRIOR TO CONSTRUCTION, A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) WILL BE PREPARED AND SUBMITTED ALONG WITH THE ACCOMPANYING NOTICE OF INTENT TO THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY. THE SWPPP WILL CONTAIN ALL SPECIFICATIONS AND REQUIREMENTS FOR STORMWATER AND EROSION CONTROL PROTOCOL DURING THE CONSTRUCTION PHASE. CONTRACTOR SHALL REVIEW THE SWPPP PLAN IN DETAIL IN ADDITION TO THESE PLANS AND DETAILS PRIOR TO START OF CONSTRUCTION. SWALE NOTES: 1.) ALL (7) SWALE SOIL BEDS AND LOWER SLOPED AREAS SHALL BE A MINIMUM OF 18" DEEP AND COMPOSED OF APPROXIMATELY 50% SAND AND 50% LOAM. UPPER SLOPED SWALE AREAS SHALL BE COVERED WITH A MINIMUM OF 4 INCHES OF LOAM. SEE SWALE DETAIL BELOW. 2.) ALL SLOPED SWALE AREAS SHALL BE COVERED WITH JUTE NETTING EROSION CLOTH, SECURED IN PLACE. 3.) SOIL BED AND SIDE SLOPES SHALL BE SEEDED WITH MEADOW / WILDFLOWER SEED MIX. APPLICATION RATE SHALL BE PER MFG'S SPECIFICATIONS. SIDE SLOPED AREAS SHALL BE PLANTED WITH NORTHERN BAYBERRY AND WINTERBERRY SHRUBS. SEE C9- LANDSCAPE PLAN. SWALE DETAIL: NOT TO SCALE VARIES 1~ (2' MIN.) ~I I I 18"(min) _- -_-_- 1 -_ 6 (min) - - - ------- . ROOF RUNOFF LEACHING SECTION: 1-1/2" WASHED STONE SURROUNDING CHAMBERS FINISH GRADE G:\AAJobs\THE DAVENPORT COMPANY -ROUTE 6A-YARMOUTHPORT\DWG\Definitive Site Plans.dwg NOT TO SCALE CULTEC NO. 410 NON -WOVEN GEOTEXTILE (OR APPROVED EQUAL) AROUND TOP AND SIDES OF STONE. 6" MINIMUM NATURALLY COMPACTED FILL \--10.5' x 6.33' LEACHING FACILITY - TWO (2) RECHARGER 330XLHD HEAVY DUTY CHAMBERS IN SERIES (8.5' LONG EACH, 1.5' OVERLAP) CULTEC NO. 4800 WOVEN GEOTEXTILE TO BE PLACED BENEATH ALL INLET PIPES (FOR SCOUR PROTECTION) C 51 THE DAVENPORT COMPANIES 20 NORTH MAIN STREET, YARMOUTH, MA DETAILS & NOTES LOT 2- ROUTE 6A- YARMOUTH-PORT, MA J.M. O'REILLY & ASSOCIATES, INC. Professional Engineering & Land Surveying Services 1573 Main Street - Route 6A P.O. Box 1773 (508)896-6601 Office Brewster, MA 02631 (508)896-6602 Fax DATE: SCALE: BY: CHECK: JOB NUMBER: 6/6/2023 As Noted RFR JMO JMO-8807