HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Lot Zone of Contribution: In Out X. Acreage
I �/ �/� Commercial: Residential:
Street: t'' car Mat/4 .i 1 f�-=� q
Village: Floor Plan: FITS # Bedrooms: q
Owner: Installer:
Address: Phone:
Phone:
Builder: Engineer: 1 �� I�� i0
Address: Phone:
Phone:
N/A YES NO
1.Required# of copies received
2. Date of soils exam and percolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material, above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: v-
5. Water line 10 ft from septic components Var.: 1,--
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: c'Gi7• T2cL14,01'91
9. Leaching minimum 100 ft from wetlands Var.: i%
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.: i/
12. System meets all other setback requirements Var.:
13. Uses adjustment for maximum high groundwater Var.:
14.Leaching set 4-5 ft above adj. water or bottom of test hole Var.: t �
15. System not in top or subsoil(A,B horizons) or 5' removal
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", '/"preferred
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel V
21.No garbage disposal ✓
22. System adequately sized for its intended use ✓
23.Minimum 6" stone or compacted below tank and dbox ✓
24.Manhole covers within 6"of grade,pump chamber cover to grade ✓ -
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size ;//'
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet, under driveway/parking
30. Buoyancy calculations for tank/pump chamber
di. Engineer to inspect and certify soils: wall: commercial: Z:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature t/
33. H-20 loading is subject to vehicular traffic, groundwater V'
34. Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd V
3 7. Check area lots for groundwater/Label groundwater in Assessor's Map V
Plan reviewed by: (Vj �/
6/03/03