Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot Zone of Contribution: In Out X. Acreage I �/ �/� Commercial: Residential: Street: t'' car Mat/4 .i 1 f�-=� q Village: Floor Plan: FITS # Bedrooms: q Owner: Installer: Address: Phone: Phone: Builder: Engineer: 1 �� I�� i0 Address: Phone: Phone: N/A YES NO 1.Required# of copies received 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: v- 5. Water line 10 ft from septic components Var.: 1,-- 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: c'Gi7• T2cL14,01'91 9. Leaching minimum 100 ft from wetlands Var.: i% 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: i/ 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: 14.Leaching set 4-5 ft above adj. water or bottom of test hole Var.: t � 15. System not in top or subsoil(A,B horizons) or 5' removal 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", '/"preferred 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel V 21.No garbage disposal ✓ 22. System adequately sized for its intended use ✓ 23.Minimum 6" stone or compacted below tank and dbox ✓ 24.Manhole covers within 6"of grade,pump chamber cover to grade ✓ - 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size ;//' 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet, under driveway/parking 30. Buoyancy calculations for tank/pump chamber di. Engineer to inspect and certify soils: wall: commercial: Z: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature t/ 33. H-20 loading is subject to vehicular traffic, groundwater V' 34. Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd V 3 7. Check area lots for groundwater/Label groundwater in Assessor's Map V Plan reviewed by: (Vj �/ 6/03/03