Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 3/ Lot // Zone of Contribution: In_ Out Acreage, ,S /01 3 Commercial: Residential: 4. ��_ Street: 3 3 _S D f;.,.tl, e v-- Village: 1 J Floor Plan:'N , el #Bedrooms: Owner: Installer: C- . C4,�( er'D , Address: Phone: Phone: Builder:Address: Engineer: ENe ;f„ � ,-r,',L, 30 e-, .r Phone: Phone: N/A YES NO 1. Required#of copies received 2. Date of soils exam and percolation test not older than 2 years ---'� 3. 4-5 ft of naturally occurring pervious material,above water table 4.Foundation 2 ft above high point of road H.P.: End: Var.: 5. Water line 10 ft from septic components Var.: 6V 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: f 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: G/ 12. System meets all other setback requirements Var.: ` e/ 13. Uses adjust aximum high groundwater Var.: L/ 14. Leachin set 4-5 ft a ve adj. water or bottom of test hole Var.:l -,› 4/ 1---- --- 15. System n . p or subsoil (A,B horizons)or 5' removal 16. Proposed contours are suitable �/4/ 17. System meets slope requirements-min. 1/8", 'A"preferred ,/ __18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 4---.- 20. Sewage is under 10,000 gpd for parcel �_ 21. No garbage disposal ✓ 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade, pump chamber cover to grade j 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes I/ 27. Pump system-2"line,weep hole,check valve, tee in dbox, pump size 28. Septic tank/pump chamber to be factory waterproofed C 29. Vent provided if leaching below 3 feet,under driveway/parking /-' 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: ,/ 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic,groundwater 34.Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house N 36. Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map I 'Y 1 c Plan reviewed by: C'..ir- b /37 ) 600;