Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. r;L2- Lot ..J Zone of Contribution: In_ Out / Acreage i� Commercial: Residential: ...�- Street: 1 `p //�_ , (� Village: f > , Floor Plan: v' #Bedrooms: Owner: Installer: m , 30� i Phone:Address: Phone: Builder: Engineer: i3 SC L^ , Address: Phone: F-w Phone: 1. Required#of copies received N/A YES I NO .,----- 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material; above water table :_i 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.:5. Water line 10 ft from septic components Var.:6. Benchmark indicated and shown-NGVD if near wetlands7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.. I �y 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: ` 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: f V f 15. System not in top or subsoil (A;B horizons)or 5' removal 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", %"preferred 18. System meets breakout requirements PVC liner: Wall: I 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel /- 21. No garbage disposal - 22. System adequately sized for its intended use I 23.Minimum 6"stone or compacted below tank and dbox I 24. Manhole covers within 6" of grade, pump chamber cover to grade /- 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes ,----- 27.Pump system-2"line,weep hole,check valve, tee in dbox, pump size 28. Septic tank/pump chamber to be factory waterproofed r 29. Vent provided if leaching below 3 feet,under driveway/parking 30. Buoyancy calculations for-tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: • 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature �� 33.H-20 loading is subject to vehicular traffic, groundwater / 34.Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house /' 36. Deed Restriction required max. #bedrooms: max. flow: gpd / " 37. Check area lots for groundwater/Label groundwater in Assessor's Map I I Plan reviewed by: .______I_C.f ...>"--C.-.04 coo: