Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot 7.,‘ Lot 2 Zone of Contribution: In Out/ Acreage .--, Commercial: Residential: Street: ci 7 r.v C Village: Floor Plan: r Bedrooms: Owner: Installer:�� , ( " Address: Phone: h �' ��, Phone: Builder: Engineer: p Ai Address: g L /t �" P Phone: Phone: 1. Required#of copies received N/A YES /� I NO 2. Date of soils exam and percolation test not older than 2 years - ,V� 3. 4-5 ft of naturally occurring pervious material, above water table �t.---•"" - 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: "- - 5. Water line 10 ft from septic components Var.: 1 - 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: [i 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: I I f .` 9. Leaching minimum 100 ft from wetlands Var.: I / 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: a 11. Tank/leaching minimum 10 ft from property line Var.: dam', 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: < 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil (A,B horizons)or 5' removal 16. Proposed contours are suitable w / 17. System meets slope requirements- min. 1/8", 'A"preferred % 18. System meets breakout requirements PVC liner: Wall: 67 19. Specified tee sizes are proper, gas baffle on outlet tee (� 20. Sewage is under 10,000 gpd for parcel / 21.No garbage disposal w 22. System adequately sized for its intended use 23. Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade, pump chamber cover to grade v v 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27. Pump system-2"line,weep hole,check valve, tee in dbox, pump size g/ 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature I L� 33.H-20 loading is subject to vehicular traffic,groundwater 34.Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house „ ---- 36. Deed Restriction required max. #bedrooms: max. flow: gpd / 1 37. Check area lots for groundwater/Label groundwater in Assessor's Map , Plan reviewed by: . '7 __/C.„. .._ c o,