Loading...
HomeMy WebLinkAboutBLD-23-002544 7cJVE; NOV 04 2022 LD ART Nr BUILDING DEP ME . e. ay: , o 4414.::) d pryry.. * - ✓ Zaro ea t1 +. it vu4` ° � .<**FF 1146 28, Saud p* r , 'Etf 02664 APPLICATION FOR FIRE PROTECTION PERMIT Date 1! f t J . PERMIT NUMBER 8 Lb-23--obastf‘f Projected Start Date: III ff / aa__ _ Date of issue In accordance with the provisions of 780 CMR and M.G.L. Chapter 148,as provided in Section This a plication is hereby made by ct S Z Rc.c-R-r.c U C. (Full name of person,Firm or Corporation ) Address bb E C/C ? - 0.2 /t'1i 66 L.-Lora MA oat 3 Y E. (Contact 4) 7If1 656 7/90 Email D a.,4 D . E[cc-n1 c Q., Ut.ri 2.o.1 ..kT- Owner of property Jra•, Do tick,- elk AS T-c,,,.,s Job Location ' E 4,5Y ,5 r (Street&City or Town) For permission to(state clearly purpose for which permit is requested) 1,n.S 7 Q L C Tt-c.A lcks-w ,S Y3"r`c.-, :" ct 7 y - rex e.S me..) u;Lc.-5 Name of competent operator(if applicable) Dan ,D,Ceara Cert. or License No. oil 0275A Estimated Cost ofConstruction: _ /g, Qo o By r4' (ignature of Applicant) Building Official: ____� Initial Construction Control Document To be submitted with the building permit application by a i ill; i Registered Design Professional ' "` for work per the 9th edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: 24 Easy Street#3 Date:9-22-2022 Property Address: 24 Easy Street#3, Yarmouth,MA 02675 Project: Check(x)one or both as applicable: (X)New construction Existing Construction Project description: New 7,100 sq. ft. single story garage I,W.Mark Gendron,MA Registration Number: 38320 Expiration date: June 30,2024, am a registered design professional and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Structural Mechanical Fire Protection Electrical (X) Other: Fire Alarm for the above named project and that to the best of my knowledge, information,and belief such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I(or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review,for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official,I shall submit field/progress reports(see item 3.) together with pertinent comments,in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a `Final Construction Control Document'. Enter in the space to the right a"wet"or electronic signature and seal: 4S, MARK , GE aN 7.1 : Nu Ntiln, Phone number: 508-906-6370 Email: Building Official Use Only Building Official Name: Permit No.: Date: Note 1.Indicate with an`x'project design plans,computations,and specifications that you prepared or directly supervised.If'other'is chosen, provide a description. Version 06 11 2013 Sears, Tim From: Huck, Kevin Sent: Tuesday, November 22, 2022 10:23 AM To: Randi Mellot; Sears, Tim Cc: Bearse, Matt; Steve Bobola Subject: Re: 24 Easy Street Tim, Fire Department is all set with Fire Alarm plan. We will need to know who the monitoring company is. A/Deputy Huck From: Randi Mellot<Randi@sanddollarcustoms.com> Sent:Wednesday, November 9, 2022 11:50 AM To:Sears,Tim<tsears@yarmouth.ma.us> Cc: Huck, Kevin<KHuck@yarmouth.ma.us>; Bearse, Matt<MBearse@yarmouth.ma.us>; Steve Bobola <Steve@sanddollarcustoms.com> Subject: RE: 24 Easy Street Attention!:This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. Thanks Tim Best, Randi Mellott Chief Rockstar Sand Dollar Customs 259 Great Western Rd. Unit B South Dennis MA 02660 508-694-5618 www.sanddollarcustoms.com HB&RACC Ls HB Home Builders&Rernooelers Association of Cape Cod From:Sears,Tim<tsears@yarmouth.ma.us> Sent:Tuesday, November 8, 2022 2:45 PM To: Randi Mellot<Randi@sanddollarcustoms.com> Cc: Huck, Kevin <KHuck@yarmouth.ma.us>; Bearse, Matt<MBearse@yarmouth.ma.us>;Steve Bobola 1 <Steve@sanddollarcustoms.com> Subject: RE: 24 Easy Street Randi, We did receive the application, I have to let the Fire Department review before we can issue. Regards, Timothy Sears CB() Deputy Building Commissioner Town of Yarmouth 508-398-2231 Ext. 1259 mailto:tsearsPyarmouth.ma.us From: Randi Mellot<Randi@sanddollarcustoms.com> Sent:Tuesday, November 8, 2022 2:37 PM To:Sears,Tim<tsears@yarmouth.ma.us> Cc: Huck, Kevin<KHuck@yarmouth.ma.us>; Bearse, Matt<MBearse@yarmouth.ma.us>; Steve Bobola <Steve@sanddollarcustoms.com> Subject: RE: 24 Easy Street Attention!:This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. Hi Tim, Just following up my voicemail with a reply to this email. Dan said he was sending out the permit and plans next day air last week.Were those received?Just checking on the status of this. Best, Randi Mellott Chief Rockstar Sand Dollar Customs 259 Great Western Rd. Unit B South Dennis MA 02660 508-694-5618 www.sanddollarcustoms.com � 4 HB&RACC Home Binders&Remodelers Association of Cape Cod 2 From:Sears,Tim <tsears@yarmouth.ma.us> Sent:Tuesday, November 1, 2022 11:03 AM To: Randi Mellot<RandiC«@sanddollarcustoms.corn> Cc: Huck, Kevin<KHuck@yarmouth.ma.us>; Bearse, Matt<MBearse@varmouth.ma.us> Subject: RE: 24 Easy Street Randi, I have an alarm plan, but no fire protection permit application.The alarm company needs to apply for a permit.We will need 2 copies of larger plans, the writing on the plans here is too small. The numbers are required to be a minimum of 4" I would check with the Fire Department about any additional numbering. If you are going to put mailboxes you would want to check with the postmaster in town, as they determine how the units will be numbered. Regards, Timothy Sears CBO Deputy Building Commissioner Down of Yarmouth 508-398-2231 Ext. 1259 mailto:tsearsPyarmouth.ma.us From: Randi Mellot<Randi@sanddollarcustoms.corn> Sent: Monday, October 31, 2022 3:39 PM To:Sears,Tim<tsears@yarmouth.ma.us> Cc:Steve Bobola <Steve@sanddollarcustoms.com> Subject: 24 Easy Street Attention!:This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. Hi Tim, I'm just checking on a couple of things. I believe we were waiting on the fire alarm plan to be signed off on?Steve dropped it off around the 17tn In regards to numbers/signage for the units—I just want to confirm the height/size the numbers of the units on the building need to be at least 4"tall? Due to the way the building is positioned, is there additional numbering or signage that will need to be done as viewable from Easy street and not just at the front of each door facing the parking lot/Power lines? Are mailboxes required?Or is this a USPS question? Thank you! Best, Randi Mellott Chief Rockstar Sand Dollar Customs 3 Sears, Tim From: Sears, Tim Sent: Wednesday, November 9, 2022 1:46 PM To: D&D Electric, LLC Cr Huck, Kevin; Sanddollar Customs Subject: 24 Easy St Dan, I have reviewed your application along with the Fire Department and there are some items to address. The plans do not show any radio coverage required by section 916.2 of the 9th Edition Mass State Building code v2. The Fire Department does not directly monitor alarm systems,the narrative implies that the p system will contact the Fire department directly. Will there be a 3`d party monitoring system? Please advise, Timothy Sears CBO Deputy Building Commissioner Town of Yarmouth 508-398-2231 Ext. 1259 mailto:tsears@yarmouth.ma.us 1