HomeMy WebLinkAboutEngineer Certification Letter JC ENGINEERING, Inc.
Qk_ Civil & Environmental Engineering
'� 2854 Cranberry IIIghway
s, East Wareham, Massachusetts 02538
Ph. 508-273-0377
June 16, 2023
Mr. Jay Gardiner
Health Director
Town of Yarmouth
Ilealth Division
1146 Route 28
South Yarmouth, MA 02664
RE: Substantial Compliance for Newly Installed Septic System Located at
49 Early Red Berry Lane, Yarmouth, Massachusetts
Dear Mr. Gardiner:
This letter is to certify that the new septic system located at 49 Early Red Berry Lane was
constructed in substantial compliance with the approved design plan entitled,Proposed
Septic System Upgrade, dated March 8, 2023, prepared by our office. See attached as-built
plan provided by the contractor(Robert B. Our Co., Inc.).
Should you have any questions or comments, please do not hesitate to contact our office.
Sincerely,
John L. C chill, Jr., PE, PLS
President �
JUiN 2 0 2023
JL,C/mcp HEALTH DEPT.
cc: R130
File