Loading...
HomeMy WebLinkAboutEngineer Certification Letter JC ENGINEERING, Inc. Qk_ Civil & Environmental Engineering '� 2854 Cranberry IIIghway s, East Wareham, Massachusetts 02538 Ph. 508-273-0377 June 16, 2023 Mr. Jay Gardiner Health Director Town of Yarmouth Ilealth Division 1146 Route 28 South Yarmouth, MA 02664 RE: Substantial Compliance for Newly Installed Septic System Located at 49 Early Red Berry Lane, Yarmouth, Massachusetts Dear Mr. Gardiner: This letter is to certify that the new septic system located at 49 Early Red Berry Lane was constructed in substantial compliance with the approved design plan entitled,Proposed Septic System Upgrade, dated March 8, 2023, prepared by our office. See attached as-built plan provided by the contractor(Robert B. Our Co., Inc.). Should you have any questions or comments, please do not hesitate to contact our office. Sincerely, John L. C chill, Jr., PE, PLS President � JUiN 2 0 2023 JL,C/mcp HEALTH DEPT. cc: R130 File