Loading...
HomeMy WebLinkAbout897 Route 28 Comp Permit Update 07062023V I C I N I T Y M A P 'ƌĂƉŚŝĐ ƐĐĂůĞ͗ 0 25 50 100 Route 2 8- Mai n Streetcenterli n e driveway RESIDENTIALcenterline253. 44' 39.2 6' 28.3 5 '84.44 '28.06'178.48'152.43'180.03'151.96'Pine Grove Roadgas meter 1,500 gal.septic tank leaching field dist. box Trash parking lotsparking lotsparking lots parking lots driveway Proposed Customer owned transformer 1000 KVA Equipment pad with -Utility owned primary metering -Customer owned MV PSE-6 switch New utility riser pole with utility goab switch Existing utility pole#37 152 Point of interconnection circuit # 4-92A-562, 22.8KV Existing utility pole#37 153 RETAIL TRADE4,050 sq.ft.90' 4 5 ' 39' 1 5 '11'104'62' 71' 20' 4' 4' Preliminary Site Plan South Yarmouth Village Center 1"=40' AB 1 SCALE: DRAWN: REVISION: 6/30/23DATE: PROJECT TITLEDRAWING TITLE Nantucket Sound Group/ Autonomous CRE+ 897 Main Street, Rt 28 South Yarmouth, MA Mixed-Use Village Development Parcel ID: YARM M:0041 B:00046 L:000 SATELLITE MAP COPYRIGHT BY AUTONOMOUS CRE+ RIGHTS RESERVED. THIS DRAWING OR SPECIFICATIONS IS PROTECTED BY U.S. COPYRIGHT LAW AND INTERNATIONAL TREATIES. IT HAS BEEN EXPRESSLY PREPARED FOR THE CLIENT NAMED IN THE PROJECT TITLE BLOCK HEREIN AND SEPARATELY FOR AUTONOMOUS CRE+ TO BE USED IN CONNECTION WITH THIS PROJECT. NO OTHER USE, DISSEMINATION, OR DUPLICATION SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF AUTONOMOUS CRE+. Proposed Amended Preliminary Site Plan