Loading...
HomeMy WebLinkAbout17 Corporation Rd fire sprinkle narrative- — Pipe Strap HANGER ROD SPACING HANGER RODSPACING PIPESIZE 1 MAX SPACING �- ! PIPESIZE N-MSPACING WOOD SCREW ---PIPE --11e--- —_ _18 x 1'/i' PIPE STRAP STEEL 1' -, -r 12 0 CPVC 11, — 6'-0 /f ► (SHOR —}'s 1 STEEL 112"-5' 15A +CPVC J 1114 5-S THINWALL - 1 V1 - ,2`-0._�CPVC „12 TO - - - - DUCTILE 3,4,S,S. 15-0 CPVC Y _ 5-0 ICPVC � z12 I s-o� iiiiri�i<�ii LAGSCREW UPRIGHT CONCRETE WOOD JOIST BEAM OR DECK SPRINKLER/ CAGE 4' TO B' 3 18 DRY _ Nut & BELOW BARREL 5 -- HANGEO DROP -IN A.T.Rod CEILINGOR--rf EL ;,- Wash anger ' ROWANCHOR PER WOOD 'In9 LOCKING 9 _�3 Hanger Ring SPRINKLER NUT,'r - `• BAND HANGER �_ r I � — SUPPORT IF r S de Beam DROP -IN BEAM CLAMP EXCEEDS 2 4'I BRACKET ANCHOR NOTE: SURGE CLIPS TO CONCEALED 1" x 1/2' RECESSED BRANCH LINE PENDENT , REDUCER BE PROVIDED AT END FROM PENDENT OF ALL BRANCH LINES. STRUCTURE SPRINKLER CEILING SPRINKLER -___ __ -- - - - NOTE: 1. ALL CONCEALED SPRINKLER HEAD COVERS SHALL COME WITH FACTORY APPLIED FINISHES TO MATCH THE FINISH AND COLOR OF THE CEILINGS TO WHICH THE SPRINKLER HEAD WILL BE INSTALLED. COORDINATIONS WITH THE ARCHITECTURAL DRAWINGS FOR ALL ADJUSTABLE SWIVEL RING,. CEILINGS FINISHES AND COLORS AND HEAD COVERS TO MATCH. UUFM HANGER ASSEMBLY 2. ALL SPRINKLER HEADS COLORS AND LOCATIONS MUCH BE APPROVED PRIOR TO INSTALLATION. ENDTIGNHGTTO PIPE ALTERNATE: USE UUFM SURGE SUPPRESSOR CLIPS PIPE SPRINKLER AND HANGER DETAIL - NTS TYP. BRANCHRANCHLINE NEW 6.2.9 STOCK OF SPARE SPRINKLERS: ELECTRIC SUPPLY OF AT LEAST SIX SPARE BELL SPRINKLERS (TWO PER EACH TYPE) TO WET UNDER 300 - NO FEWER THAN 6 SYSTEM 3E TO 1000 - NO FEWER THAN 12 OVER 1200 - NO FEWER THAN 24. FIRE SPARE HEAD BOX; DEPARTMENT CONNECTION TO CHECK VALVE BE APPROVED - r , PER NFPA 13 SECTION AND FIELD i 8.17.4.6.1 MEANS SHALL LOCATED BALL DRIP FLOW BE PROVIDED WET RISER SWITCH DOWNSTREAM OF ALL CHECK VALVE $ACKFLOW PRESSURE PREVENTION VALVES GAUGE FOR TEST AT SYSTEM DEMAND DQ�T6 EXTERIOR BUTTERFLYVALVESlZRI UPERVISOR WITH C11PFR1JI_gnPV HUT -OFF FIRE SPRINKLER NARRATIVE FIRE PROTECTION NOTES: THE PURPOSE OF THIS NARRATIVE IS TO DESCRIBE THE FIRE PROTECTION SPRINKLER SYSTEM AT 17 CORPORATION RD. IN 1. SYSTEM DESIGN AND INSTALLATION TO CONFORM TO N.F.RA. 13,14 LATEST EDITION AND THE YARMOUTH, MA. MASSACHUSETTS STATE BUILDING CODE - 9TH EDITION THIS IS A NEW 1 STORY COMMERCIAL BUILDING, BUILDING STRUCTURE IS STEEL. TOTAL FLOOR AREA: 7,080 SQ. FT. A NEW WET 2. ALL MATERIAL, DESIGN AND WORKMANSHIP TO CONFORM TO N.F.P.A. 13, THE LOCAL FIRE SPRINKLER SYSTEM SHALL BE INSTALLED THROUGHOUTTHE BUILDING. BUILDING SHALL BE USED FOR COMMERCIAL VEHICLE DEPARTMENT AND ALL APPLICABLE CODES. STORAGE. THE SPRINKLER SYSTEM SHALL BE DESIGNED IN ACCORDANCE WITH NFPA 13, 2013 EDITION. BUILDING DESIGNED FOR 3. ALL NEW PIPING 1-1/4" AND SMALLER TO BE SCHEDULE 40 BLACK STEEL WITH CAST IRON SCREWED VEHICLE STORAGE AND VEHICLE REPAIRS. ANYADDITIONAL STORAGE APPLICATION BEYOND THIS DESIGN NOT INCLUDED, FITTINGS. ALL NEW PIPING 1-1/2" AND LARGER TO BE SCHEDULE 10 BLACK STEEL WITH GROOVED THE PROPOSED NEW SPRINKLER SYSTEM SHALL BE CONNECTED TO THE NEW 6" SERVICE (PROVIDED BY OTHERS). COUPLINGS, FITTINGS, MECHANICALTEES AND WELDED OUTLETS. THE SCOPE OF WORK CONSIST OF A NEW AUTOMATIC WET SPRINKLER SYSTEM THAT IS FED FROM THE RISER ASSEMBLY LOCATED 4. INSPECTORS TESTAND DRAIN ASSEMBLY LOCATIONS SHALL BE APPROVED BYAHJ, ARCHITECTAND IN THIS AREA (SEE DRAWING FOR DETAILS). THE NEW 6' BACKFLOW PREVENTER AND 6" WET RISER CHECK ARE LOCATED IN THIS OWNER. AREA. THE WET SPRINKLER SYSTEM IS SUPPLYING THE ENTIRE BUILDING. 5. ALL SPRINKLER HEADS SHALL BE QUICK RESPONSE TYPE. SEE SPRINKLER LEGEND FOR TYPE AND THE SYSTEM SHALL BE ACTIVATED WHEN A HEAT SOURCE WOULD FUSE A FIRE SPRINKLER HEAD, CAUSING THE HEAD TO OPEN AND QUANTITIES. PER NFPA13 8.3.2.5 - SPRINKLERS LOCATED WITHIN 2'-6" OF HEAT SOURCES SHALL FLOW WATER, WHICH SIMULTANEOUSLY TRIGGERS THE ALARM SYSTEM THAT WILL SIGNAL TO THE LOCAL FIRE DEPT. AND AN REQUIRE INTERMEDIATE TEMPERATURE SPRINKLER HEADS. SPRINKLER HEADS IN STORAGE AND APPROVED CENTRAL LOCATION. MECHANICAL AREA SHALL HAVE CAGES. THE BUILDING SHALL BE FITTED WITH AN AUTOMATIC FIRE ALARM SYSTEM (BY OTHERS) THAT SHALL PROVIDE AN AUDIBLE ALARM 6. FIRE STOP PROVIDED AT ALL PIPING PENETRATIONS THROUGH RATED WALLS. UPON ACTIVATION OF A FIRE SPRINKLER HEAD AND/OR TEST VALVE. 7. ALL PIPES SHALL BE SUPPORTED PER N.F.P.A. 13, 2013 EDITION AND MANUFACTURERS THIS DRAWING IS INTENDED TO SHOW GENERAL ARRANGEMENTAND SCOPE OF WORK TO BE PERFORMED. ALL LOCATIONS ARE INSTALLATION REQUIREMENTS. APPROXIMATE AND ARE SUBJECTTO CHANGE TO CONFORM TO STRUCTURAL AND/OR JOB CONDITIONS. 8. ALL EQUIPMENTAND DEVICES TO BE U.L. LISTED AND/ OR F M. APPROVED. 9. ALL CONNECTIONS OF SPRINKLER DEVICES TO THE FIRE ALARM SYSTEM SHALL BE PERFORMED BY OTHERS. 29-0 20'-0 2U-0 19'-0 10. ALL ELECTRICAL WIRING OF THE SPRINKLER DEVICES SHALL BE DONE BYA LICENSED - __ ELECTRICIAN. --- TESTCONNECTION --__-___ _ _ _. PROVIDED BYTHE OWNER AT40 DEG. F MINIMUM IN ALLAREAS WITH SPRINKLER 11. H EAT TO BE - -- 4 4 _-- - 4 � ` HEADS OR PIPING. cn 10''0 c* ,•1 �;,, 12. WHETHER OR NOT INDICATED ON THE DRAWINGS THE FOLLOWING ITEMS SHALL BE PROVIDED: - c*� /_ (�},11 -' �7. ' 1 r� 19-0 _� cis 1 ip-0 r� 10'-Q, T C r 4 D'•0 r • 9'-5 i u � �' u '� " SPARE HEAD CABINET WITH WRENCH I �- PROVISIONS FOR FLUSHING CONNECTIONS AND DRAINING OF ALL PIPE ! �, 1os _ INSPECTOR'S TEST CONNECTION FOR EACH SYSTEM. °' 6 `' 1 , 13. THE BUILDING OWNER IS RESPONSIBLE FOR MAINTAINING THE DESIGN OCCUPANCY 1 ARRANGEMENT WITHIN THIS BUILDING TO NOT EXCEED THE LIMITATIONS OF NFPA 13, 2013 EDITION FOR DESIGNATED AREAS IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA 13, 2013 EDITION AND SUPPORTING HYDRAULIC CALCULATIONS SHOULD BE PERFORMED. 102 105 ' 108 Q - SYSTEM TESTING: �! •- ` �- r LiJ �;, -, s_ -, Q, �— -, Q r r r -� r �;, ; i it I THIS SYSTEM SHALL BE TESTED AS REQUIRED BY NFPA 13. ADDITIONALLY, AMAIN DRAIN TESTAND AN '_- „ ;1 INSPECTORS TEST WILL BE CONDUCTED, CONTROL VALVE AND TAMPER SWITCH CLOSURE TEST WILL �� - -------- _------ __- --- - — -t ---- --- -- - ------ , - MI ALSO BE CONDUCTED. MA. STATE FIRE SPRINKLER CONTRACTOR: PAUL SWANFELDT LIC#SC004508 EXP. 4/21/24. i 1 110 107 104 1t�4 9-8 9 10 19-0 lt'"'-.-----_--- --------� ;-------- ------------. ._.._.------- 116 115 114 113 j r STORZ FDC Gig T- yy - •- •- r r 'f� s• ;- !! aMr a�2` •- /� ® ai JI ay I I TYPE AND LOCATION i SHALL BE APPROVED BYTHEAHJ OF FIRE DEPARTMENT 1 1 (ELECTRIC BELL BY OTHERS) (1) W DOUBLECHECK VALVE BACKFLOW ASSEMBLY (2) 6- BUTTERFLY VALVES WITH TAMPER SWITCHES (1) 6- SPRINKLER RISER: (1) 5' RISER CHECK VALVE- `� �' r" "- r r r r (1) G' WATER FLOW SWITCH %� t3� `- 66`- (1) 2- AGE TEST & DRAIN (PIPED TO THE OUTSIDE) Hydraulic Information Remote Area Open Area OCCUPANCY CLASSIFICATION Ordinary Group II DENSITY (gpmtff?) 0.20 for 1500 112 (Actual 1566 ft2) TOTAL HOSE STREAMS 250.00 TOTAL HEADS FLOWING 16 K-FACTOR 8 TOTAL WATER REQUIRED 619.83 TOTAL PRESSURE REQUIRED 29.269 BASE of RISER (gpm) 3%83 BASE of RISER (psi) 19.771 SAFETY MARGIN (psi) +18.505 (38.70%) � U-Sn _ _-_ _-. __. n �� n r : O� n --- _._. -_ -. -_ __-- _ ra _ ___. • �o' _ _ ___ �'� n , O� RETAIL AREA DESIGNED TO DELIVER A MINIMUM DENSITY OF 0.20 T HOLES 4 , �o , doh GPM/ . FT. OVER THE HYDRAULICALLY MOST REMOTE 1 950 SQ. TO BO WALLS OLES _J BOR ='� ro co So '� 43 co G SQ , cn �1 co Z;1 FT (SLOPED ROOF WITH A HOSE STREAM OF 250 GPM. ¢ T `' 1 1 F1 1 1 i SPRINKLERS SHALL BE A K FACTOR OF 8.0 RATED AT 155*F WITH A SERVICE F 6 6 ® 7-fi T 2=8 5'-10 7-8 MINIMUM OF 130SQ. FT SPACING. LINE U In In w 1 C; P �.� RISER DETAIL -Scale: NTS UNI FLANGE FLOOR5-0 m a�I tjIb 1'�? 4 N 4 $zv 4 4 cy 4 �-v- n (� 4 ' o, 4 n - - --- - - `- ...---- ------ _- Sprinkler Legend Symbol Manufacturer SIN Model Quantity K-Factor Type Size Response Finish Temperature Note v Reliable RA6322 F1FR80 70 8 Upright % Quick Brass 155 °F Reliable RA1435 F1FR66 10 5.6 Sidewall M2 Quick Brass 155 °F f Reliable RA7414 F1FR56 2 5.6 Pendent 1/2 Quick Chrome 165 "F Total = 82 Sc11 ale: 1 / 8" 1 ' -01 Supply Flow Test Data Test Conducted By Mass. Fire Services Date of Test 12/15/22 Time of Test 8:00pm Location 17 Corporation Rd. Static Pressure 60.000 Residual Pressure: 45.000 Flow 960.00 mmmmmmmmm MOP 0 66-7 7 - Z3 91JILDiNG AND ZONING C1 _lROMMISSIONSDONO, I4LLILV ai THE RESPONSIBILITY OF' csUILT" r) lu za z go O 0? r� m Z� co Z¢o O? U ~ °C CO WLL1z z� cr2 Oz� ��Uj O ChLL1 F- r CC Q a N LL. z cc o wP z 0 ILIL =Z zw ~� CLU q W W W W Z w m Q >LL Q4 Q m0aWN m. W}coo) �p�� 1 W JQ =-Ok to ZWQ �d ZO u}i 0))da Z�w it w�U O w0 �� O m30 z MW6 LL1 aim H$p w Ywa = Z°D= ZUw z uSI- F- F O wza Zz aiU,0 _I (7a9 g08 U Hz- ¢ Wiz- W Zoo 0 W ZWo0 F- F�uW d z ��� Zj UI w�w Y P2I m uJf cn WU_ Z Ua O XOM <QXQ a Q° MOD Wt0 =' ZWW UD3 (A ,W�ZQ. pUp ?a Ow z �g 00)� 1- �Qa Ni§ m `< Z„J 00 WZ MIyc-'-gMrg Wh Z.W W6 zW 020 W Wo�<F J22:2 wUMUOZ rw-Z- gg raoa u 6M 4Pw0 uiif THIS DRAWING IS PREPARED BYLYNCO FIRE PROTECTION FOR USE IN CONNECTION. WITH THIS PROJECT FOR USE SOLELY W ITH RESPECTTO LVNCO FIRE PROTECTION WORK ON SUCH PROJECT. LYNCO FIRE PRO'fECT�V R£iR(NS Atl COMMOYY CAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING COPYRIGHT. THE DRAWING SHALL NOT BE USED BY OTHERS ON OTHER PROJECTS OR FOR PERFORMANCE, COMPLETION, OR ADDITION TO THIS -- PROJECTBYOTHERSEXCEPTBYAGREEMEN70FLYNC,O FIRE PROTECTIONIN WRITINGANDWITHAPPROPRIATE COMRENSATION ,�y - TO LYNCO FIRE PROTECTION. a �N■ Residual. 45 psi Flow. 960 gpm Date: 12/15/22 Location. 17 Corporation Rd Information By: Mass. Fire Services 0' 2' 4' 8' Date. 314123 Designed by: B.G. stamp. 1A g o V Job Name: Commercial 17 Corporation Rd. - = Yarmouth, MA. 02675 Gontractmr No. 1 Foundations 559 Old Stage Rd. Centerville, MA. 02632 Dwg Name., Fire Protection Ground Floor Plan Notes and Details Dwg No: LFP-001 Sheet 1 of 1 I hm