HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. I 1 S Lot S 3 Zone of Contribution: In Y Out Acreage O. 2-3 AC
i Commercial: Residential: ✓
Street: 6, Se-4, P P(- LAC
Village: Floor Plan: #Bedrooms: 2-
Owner: /-/ 'S Ez r-T- Installer:
Address: Phone:
Phone:
Builder: Engineer: O' C-t' -' - rf-Z.r ti/ A-s
Address: Phone:
Phone:
N/A YES NO
1. Required#of copies received ✓
2. Date of soils exam and percolation test not older than 2 years ✓
3. 4-5 ft of naturally occurring pervious material, above water table V
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: V
5. Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown-NGVD if near wetlands ./
7. Septic tank minimum 10 ft from foundation, deck Var.: C---'/c t Si"
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.: t/
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: /
11. Tank/leaching minimum 10 ft from property line Var.: V
12. System meets all other setback requirements Var.: I
13.Uses adjustment for maximum high groundwater Var.: ✓
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: t/
•
15. System not in top or subsoil (A,B horizons)or 5' removal /
16. Proposed contours are suitable ✓
17. System meets slope requirements-min. 1/8", %"preferred V
18. System meets breakout requirements PVC liner: Wall: /
19. Specified tee sizes are proper, gas baffle on outlet tee V/
20. Sewage is under 10,000 gpd for parcel ✓
21.No garbage disposal
22. System adequately sized for its intended use f
23.Minimum 6" stone or compacted below tank and dbox I
24. Manhole covers within 6"of grade,pump chamber cover to grade
25. Inspection port on plastic chambers/leach field t/
26. Electrical permit for pump chamber/Separate meter for duplexes
27. Pump system-2"line,weep hole,check valve,tee in dbox,pump size c/
28. Septic tank/pump chamber to be factory waterproofed V
29. Vent provided if leaching below 3 feet,under driveway/parking
30.Buoyancy calculations for tank/pump chamber
31.Engineer to inspect and certify soils: wall: commercial: I
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature ✓
33. H-20 loading is subject to vehicular traffic, groundwater ✓ .
34.Title V Application and permit fee, installer signature I
35. Foundation footing min. 2 feet above adjusted ground water for new house ✓
36. Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map t/
Plan reviewed by: 6 03 03