Loading...
HomeMy WebLinkAbout185 Seaview Ave plan 1CLASS11FICATON STATE/TPA APPROVAL STAMP T0WH 0F MR,F71.`17;ul-94 PFS Corporation OF REVIEWED FOR BUILDING AND ZOINIIING CODE COMPt.1- V�11 DAVID ANCE. �ERRORS OR OMMISSIONS DO NOT RELIEVE THE Approval Limited to Factory -Built Portion only FEEN S BUI 0 State: Massachusetts N0.54747 APPLICANT FROM THE RESPONSIBILITY OF 'AL Signature: 144A && 4 aISTE COIN? ICE Title: Staff Plan Re -viewer AL Date: 04/0642022 417CURRALRWISWR2 UN-M DAM, W31m. N.WRGRNvIm 8URRRA17915 ney 246 SAND HILL ROAROAD0 SELINSGROVE, PA 17870 PHONE: (570) 374-3280 fu�ONICI est4 LEGACY 2007 FAX: (570) 374-1122 CUSTOM MODULAR HOMES WWW.ICONLEGACY.COM L L C -11; 0111 OX'3 4 0 C 9 DRY C) to-O C-, Cq U 0 ' Cq 44 4;:� .4 4 < 171- 0 o M It b - 0 CIO U Cq z0 u 0�o� a Z" SHEET#_ DESCRIPTION OCCUPANCT LOAD: SINGLE FAMILY CV COVER SHEET USE GROUP: ONE FAMILY C1 SITE PLAN CONSTRUCTION TYPE: VB (WOOD FRAME UNPROTECIFD) GN GENERAL NOTES STRUCTURE SQ. FT.: 1,660 (1,066 1ST FLOOR/594 2�ND FLOOR) EVI FRONT ELEVATION EV2 REAR ELEVATION— DEMON LOADS EV3 LEFT ELEVATION CLIMATE ZONE: 5 (6137 HDD) EV4 RIGHT ELEVATION NUMBER OF STORIES: 2 FP1 1ST STORY FLOOR PLAN ROOF LIVE LOAD: 40 P9 PSF / 30 Pf' PSF 10 PSF FP2 2ND STORY FLOOR PLAN ROOF DEAD LOAD: Swi 1ST STORY BRACED WALLS CEILING DEAD LOAD: 10 PSF Bmi IST STORY BEAMS CEILING LIV[ LOAD: 20 PSF BM2 2ND STORY BEAMS FLOOR LIVE LOAD: 40 PSF IN COMMON AREAS 30 PSF IN BEDROOMS ELI 1ST STORY ELECTRICAL PLAN FLOOR DEAD LOAD: 10 PSF EL2 2ND STORY ELECTRICAL PLAN HORIZONTAL WIND LOAD: 140 VULT per ASCE 7-10 ELC ELECTRICAL LOAD CALC EXPOSURE: C CS CIRCUIT SCHEDULE SITE ELEVATION: -- 7 FT ABOVE SEA LEVEL ELN ELECTRICAL NOTES - - - - - - 77- - - - - - - — - - - - - - - - - - - - - - - - - --=77= 111 11 L 1 "[1-] 111 - _1111 12 L m Cn cn Cn cn (f) C/1 cr) D __j GROUND SNOW LOAD: 35 PSF FIND FOUNDATION PLAN SEISMIC CATEGORY: B 12 SE1 12/12 TWO STORY CROSS SECTION - - - - - - - - == ::= 7 - - - - - :: - - - -== - - - - - -- ROE- - - - - - ------ -- - - - - - - - - - - - - - - - - - - - - WINDBORNE REGION: NO 0 Cn I-d 01 � = Cr Cr CL __j < __j w C11- -i LI-1 a_, 0 SE2 7/12 RANCH CROSS SECTION LOT LINE SEPARATION: NO ( >5 FEET SEE PAGE CI) SE3 7/12 SINGLE CROSS SECTION FLOOD ZONE: AE SE4 SECTION FASTENING BASE FLOOD ELEVATION: 11 FEET BIRD BIRD'S EYE APPLICABLE CODES - MA 1&2 FAMILY DWELLING CODE -(780 CMR) 9TH EDITION . 248 CMR, THE MASSACHUSETTS STATE PLUMBING AND GAS CODE . 2015 INTERNATIONAL MECHANICAL CODE W/ MA AMENDMENTS . 2020 NATIONAL ELECTRICAL CODE W/ MA AMENDMENTS , 2018 INTERNATIONAL ENERGY CONS. CODE W/ MA AMENDMENTS TR1 19'-10" WIDE 12/12 RAFTER (R-1) -�2/12 TR2 RAFTER CONNECTIONS TR3 27'-6" WIDE 7/12 RAFTER (R-8) TR4 7/12 RAFTER CONNECTIONS - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- -- -- - - - - - - - - =--=-===3 -===== - ==�== - I ====--] - - - - - - — I ====- - = - - - j I - - - - - - - - - - - - - - - - - -T - - - - - - - - - - - — — - - - - - - - - - - - - I - - - - - - LP, I 7117jF ----- - - - - - - - - - — - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 9 F- " FIRONT ELEVATION INDEPENDENTBUILDERS CONTRACTOR TO PROVIDE ACCESS TO GRADE IS RESPONSIBLE INDEPENDENT LDER'S ALGA FOR DESIGN AND INS TALLAMN OF FOUNDATION BUILDER TO FOLLOW 780 CMR R322 (HOUSE LOCATED IN ZONE AE FLOOD PLAIN) IM HOUSE IS IN A STFETCH ENERQY CODE AFEA INDEPWANT BDILDER 15 FIESPMBLE TO MEEr BLOWER DOOR AND DUCT TIGHTNESS TEST MUST BE OR EXCEED MFETCH EINERaY CODE COMPUANCE PERFORMED ON -SITE BY A MA CERTIFIED PROFESSIONAL THIS HOUSE IS� REPLACING AN EXISTING HOUSE SHEARWALL DESIGN PE EXISTING �OUSE TO BE TORN DOWN RYAN W. BORING HOUSE DESIGNED TO BE SOLAR PANEL READY PO BOX 2941 TRUSS SYSTEM DESIGNED WITH TC DIL OF 10 PSF- SOLAR PANELS INSTALLED FLAT ON ROOF ELKHAF(r, IN 46515 SYSTEMS SHALL NOT EXCEED 10 PSF DL. IF SOLAR PANELS EXCEED 10 PSF OR ARE INSTALLED MA LIC #49506 IN A MANNER THAT ALLOWS THE SOLAR PANELS TO BE INSTALLED IN AN UPRIGHT MANNER THAN (574) 575-4872 THE ROOF SYSTEM NEEDS TO BE REVIEWED FOR THE SPECIFIC SOLAR PANELS. OPEN JOIST TRUSS PE RAFTER CALCS PE PHILLIP E. ROBBINS, P.E. JAMES J. BARLOW SERIAL J/ ORD. I SCALE; 1/4! - 1`9 T777 STATE ROUTE 167 244 HOLDING AVE., PO BOX MA CERTIFICATION * 352 VICTORIA, L 61485 WAKE FOREST, INC 27588 EXP. DATE: 04/30/2022 MA LIC #51081 MA LIC #49508 0#10394 (309) 879-2337 (M) 845-1600 TR5 13'-9- WIDE 7/12 RAFTER & CONNECTIONS (R-9) A 48 HOUR NOTIFICATION IS REQUIRED PRIOR TO THE SET. THE CSL ON RECORD WILL RELAY THIS TO THE LOCAL BUILDING AUTHORITY. IF ANY CONNECTIONS HAVE BEEN CONCEALED PRIOR TO INSPECTION, THE BUILDING OFFICIAL MAY REQUEST HAVING THE REMOVAL OF ELEMENTS THAT CONCEAL THE CONNECTIONS TO PROVIDE ACCESS. THIS WOULD NOT CONSTITUTE 'DESTRUCTIVE DISSASSEMBLY" * ALL CONNECTIONS ON SITE MUST BE INSPECTED BY THE LOCAL AUTHORITY. Ln 00 CN CN C, CD TRIS 6'-9" WIDE 12/12 DORMER (R-2 & R-5) -12/12 TR7 DORMER CONNECTIONS TR8 6'-6" WIDE 4/12 DORMER (R-3 & R-7)) -T/12 Lj __j W CD mo SCE �> W < Lij < Ljj cr) Ln 2 0 CO n=D > No <C LLJ m < a: TR9 DORMER CONNECTIONS TRIO 7'-0" WIDE PORCH RAFTER & CONNECTIONS IINSULATIJON VALUES TR11 14'-7" WIDE VALLEY PANEL & CONNECTIONS — — ROOF TO EXTERIOR: R-51 (ATTIC)/R-35 (BETWEEN KNE—EWALLS) FFI 1ST STORY FLOOR FRAMING EXTERIOR WALLS TO EXTERIOR: R-21 HIGH DENSITY FF2 2ND STORY FLOOR FRAMING FLOOR TO BASEMENT OR CRAWL SPACE: R-21 (BASEMENT WALL) CR 1ST STORY CEILING FRAMING SEE RESCHECK FOR ADDITIONAL INSULATION REQUIREMENTS CF2 2ND STORY CEILING FRAMING WHOLE HOUSE VENTILATION PM W507-N1103.6 —ACHEWD WITH BATH FAN SEE PAGE ELC FOR CALCULATION + ELI (BATH#1)/EL2 (BATH#2) FOR LOCATION STA STAIR DETAIL DWS DOOR AND WINDOW SCHEDULE ON-SIITE WORK BY OTHERS FSI FASTENING SCHEDULE MANDATORY ENVELOPE AIR SEALING/TESTING ON -SITE AT THE COMPLETION OF THE MODULAR ENVELOP SET-UP = F- Z) C) :2i � < = V) = CY-1 8 z -< FS2 FASTENING SCHEDULE CONTINUED CONNECTION OF MODULE TO FOUNDATION FOUNDATION PL1 PLUMBING SCHEMATIC CONNECTION OF MODULE TO MODULE ACCESS TO GRADE PI-2 PLUMBING NOTES HEATING SYSTEM INSULATION IN IST STORY FLOOR RIDGE VENT KITCHEN APPLIANCES PL3 PLUMBING/MECHANICAL VENT DETAILS COMPLETION OF SHINGLES WINDOW GUARDS 1-4 WIND CALCULATIONS INSTALLATION OF SIDING RADON PUMP 0 "t- -- INDEX CALCULATIONS INDEX WASHER & DRYER SPOT LIGHTS & EXTERIOR LIGHTS— WATER HEATER RANGE HOOD & DRYER VENTS C -RC51 RAFTER AND BEAM CALCULATIONS BASEMENT STAIRS EXTERIOR CORNER TRIM FCI-EC8 ----- -- ENERGY CODE CH -ECKLIST— PLUMBING CONN. BETWEEN MODULES PADDLE FANS INTERIOR RAILINGS AND GUARDS FLOORING - THROUGHOUT TOTAL PAGES EXTERIOR POSTS, RAILINGS, & GUARDS CLG GYPSUM AT OMIT AREAS INSTALLATION OF PORCH ROOF PANELS INSTALLATION OF ROOF VALLEY PANELS INSTALLATION OF DORMER ROOFS INSTALLATION OF ROOF PANELS (R- COVER PAGE NOTE: SITE CONNECTIONS TO BE \/ERIFIEID BY CONSTRUCTION SUPERVISOR WSTALLATION OF ROOF PANELS (R-9) CV I LABEL LOCATIONS: DATA PLATE @ KITCHEN SINK —LABEL PFS7STATE LOCATIONS: "A" @ BED#1 WIC, "B" @ KIT "C" @ BED42 CLO, & "D" @ BEDO -�—1 INK, CLO - ------ 13 HEATING SYSIEM PROHIBIT THE CUTTING/NOTCHING/BORING OF FRAMING MEMBERS BY ON -SITE INSTALLERS OF M/E/P [TOOK UP PLUMBING TO MAIN MUST HAVE APPROVAL MANUF. AND/OR , "0 0 -Ak%