Loading...
HomeMy WebLinkAbout103 River St plan 3MATCH HORIZONTAL REINF. AND LAP 36 BAR DIA. MINIMUM N N( > 1 ��7 PROVIDE WATER STOPS AT RETAINING WALLS AND BASEMENT WALLS 1" CHAMFER STRIP EACH FACE TYPICAL NOTE: THIS DETAIL CAN BE SUBSTITUTED FOR A WALL CONTROL JOINT IF 12F'Im;7r)pf1INt; Iq gmr)()TH Project: DATE: 103 River South Yarmouth MA Feb.-21-23 Owner. The Hearn's Sangiolo Associates Architects -- www.sangioloassociates.com f' 617 272 5402 ' Efas.7�4 C} Structural 1 ", Drawing: FOUNDATION • PERMIT DRAWINGS r— — — — — — — — — — — — — — — — — — — — — — — — — 7/16" SHEATHING OVER I EXISTING SHEATHING EXISTING SHEATHING I I BLOCKING @ PLYWOOD SPLIFE CUT BACK JOIST AND INSTALL NEW SHOE I I CUT BACK EXISTING SHEATHING /2X6 SHOE AND REPLACE WITH NEW PLYWOOD T&G 3/4" CDX PLYW�OD SHEATHING TO MATCH THICKNESS GLUE &SCREW EXTEND UP V MIN PAST BOTTOM OF SHOE. NAIL WELL. E—®__-----_— — SHAPED 1X DRIP. RUBBER BACKFLASH I 1.75" THICK LVL BAND JOIST I 1X10 BAND I I 3/4" STONE VENEER CONTINUOUS PT BLOCKING I PT 2X6 SILL AND SILL SEA4 00 � I I I I I L— — — — — — — — — — — — A3 GENERAL CONCRETE AND FRAMING NOTES 1. ALL CONCRETE fc = 3000 PSI @ 28 DAYS 2. ALL REINFORCING fs = 40,000 PSI 3. ALL STRUCTURAL WOOD fb = 900 PSI MIN. 4. ALL ENGINEERED WOOD fb = 2800 PSI MIN. 5. DO NOT BACKFILL FOUNDATION UNTILAFTER FIRST FLOOR FRAMING IS IN PLACE 6. BACKFILL IN Z LIFTS COMPACT TO 95% OF A MODIFIED PROCTOR 7. ALL CONCRETE WORK SHALL FOLLOW AMERICAN CONCRETE GUIDELINES ACI 305 HOT WEATHER GUIDELINES ACI 306R-16 COLD WEATHER GUIDELINES FOUNDATION PLAN