Loading...
HomeMy WebLinkAbout103 River St plan 95 4 r-----------� FINISH FLOORING 3/4" OSB T&G, S&G. JOIST SEE STRUCTURAL FOAM INSULATION R=3C STEEL BEAM i F---------- FINISH FLOORING 0 3/4" OSB T&G, S&G. 0o IMJOIST SEE STRUCTURAL INSULATION R=30 STRAPPING & GWB OR FIREPROOF TRUSS JOIST STEEL BEAM ASPHALT SHINGLES 15 LB FELT PAPER EX 2 5/8" CDX SHEATHING EXISTING SHEATHING METAL CONNECT OR SISTER EXISTING RAFTERS WITH 2X10 3 - 3/8" LAGBOLTS ADD 2X10 FOR 16"' O.C. MIN. SPACING BEAM TO COLUMN. FOAMED IN PLACE INSULATION R=49 2.5" EMBEDMENT. STRAPPING TYPICAL RAFTER HANGERS TYPICAL GWB ex RAISE EXISTING FLOOR HEIGHT a f —_-- 5.25X5.25 MICROLAM HEADER f FINISH FLOORING I H 3/4" OSB T&G, S&G. ( DRAWINGA6 JOIST SEE STRUCTURAL I I EXISTING 8X8 SUMMER BEAM FOAM INSULATION R=30 ICI TO BE RELOCATED III FT 7n I RELOCATED EXISTING 8X8 SUMMER BEAM 00 REUSE EXISITNG BEAMS UNDER NEW FLOOR STRUCTURE I I t STEEL COL. STEEL COL. 5" CONCRETE SLAB W/ 6x6 WWF 10 MIL VAPOR BARRIER COMPACTED SAND 7' 29'_6" - - - 3U' . . d. 4 'a d 0 Building Section 1 n ASPHALT SHINGLES STB S 15 LB FELT PAPER TE (ICE & WATER @ EAVE) 5/8" OSB A 2X10 @ 16" O.C. R=49 SPRAY FOAM INSUL. STRAPPING COMPOSITE DECKING 1/2" GWB SHAPED PT JOIST MEMBRANE STRIP MEMBRANE ROOFING MEMBRANE BACKER TAPERED INUSLATION 3 Sto 3/4" T&G SHEATHING ry R=49 SPRAY FOAM INSUL. STRAPPING GWB / / I ♦ 2X8 LEDGER W/ 2-3/8" LAGS 2" EM .01 i� I �� �1� TO TARGET ` II II �, 1iiJ II II � II II II II II II - ASPHALT SHINGLES I I I I 15 LB FELT PAPER FINISH FLOORING (( T&G 4X8 @ 3' O.C. 3/4" OSB T&G, S&G. JOIST SEE STRUCTURAL I f \ (� FOAM INSULATION R 30 ' 2 Story 1 \ I I II 1 I II STEEL BEAM I I II o a) FINISH FLOORING 5/4 COMPOSITE DECKING \ 3/4" OSB T&G, S&G. I 00 PT 2X8 @ 16" O.C. JOIST SEE STRUCTURAL I I R= 30 INSUALTION I I I GWB OR FIRE PROOF TJI I T LEDGER W/ 2-3/8' LAGS 2" EMBEDME TO TARGET 1 Story 'li II a: II I( I II e 5" CONCRETE SLAB W/ 6x6 WWF I I 10 MIL VAPOR BARRIER I COMPACTED SAND 23'-1" -8" -1 storyliI I d Building Section 2 `I® a d +18'-8" 3 Story +8'-6"Ah 2 Story ±0"Ah 1 Story DRAWING A3 E ,gk+ 3 Story ,gk+8'-6" 2 Story 1 Story -qr -1 Story ASPHALT SHINGLES 15 LB FELT PAPER (ICE & WATER @ EAVE) 5/8" OSB 2X10@16"O.C. R=49 SPRAY FOAM INSUL. STRAPPING 1/2" GWB FINISH FLOORING 3/4" OSB T&G, S&G. JOIST SEE STRUCTURAL INSULATION R=30 STRAPPING 5/8" GWB Project: DATE: 103 River South Yarmouth MA Feb.-21-23 Owner: The Hearn's Architect" Sangiolo Associates Architects www.sangioloassociates.com 617 272 5402 / Structural 9 fi C* Drawing: A8 BUILDING SECTIONS PERMIT DRAWINGS 5" CONCRETE SLAB W/ • • WWF 10 • • • ■ BARRIER COMP 'CTED SAND Building Section 3 a 5