HomeMy WebLinkAbout103 River St plan 95
4
r-----------�
FINISH FLOORING
3/4" OSB T&G, S&G.
JOIST SEE STRUCTURAL
FOAM INSULATION R=3C
STEEL BEAM
i
F----------
FINISH FLOORING
0 3/4" OSB T&G, S&G.
0o IMJOIST SEE STRUCTURAL
INSULATION R=30
STRAPPING & GWB OR
FIREPROOF TRUSS JOIST
STEEL BEAM
ASPHALT SHINGLES
15 LB FELT PAPER
EX 2 5/8" CDX SHEATHING
EXISTING SHEATHING
METAL CONNECT OR SISTER EXISTING RAFTERS WITH 2X10
3 - 3/8" LAGBOLTS ADD 2X10 FOR 16"' O.C. MIN. SPACING
BEAM TO COLUMN. FOAMED IN PLACE INSULATION R=49
2.5" EMBEDMENT. STRAPPING
TYPICAL RAFTER HANGERS TYPICAL
GWB
ex
RAISE EXISTING FLOOR HEIGHT
a
f —_-- 5.25X5.25 MICROLAM
HEADER
f
FINISH FLOORING I H
3/4" OSB T&G, S&G. ( DRAWINGA6
JOIST SEE STRUCTURAL I I EXISTING 8X8 SUMMER BEAM
FOAM INSULATION R=30 ICI TO BE RELOCATED
III
FT 7n
I RELOCATED EXISTING 8X8 SUMMER BEAM
00
REUSE EXISITNG BEAMS
UNDER NEW FLOOR STRUCTURE
I
I t
STEEL COL. STEEL COL. 5" CONCRETE SLAB W/ 6x6 WWF
10 MIL VAPOR BARRIER
COMPACTED SAND
7' 29'_6" - - - 3U'
. . d. 4 'a d
0
Building Section 1
n
ASPHALT SHINGLES
STB S 15 LB FELT PAPER
TE (ICE & WATER @ EAVE)
5/8" OSB A
2X10 @ 16" O.C.
R=49 SPRAY FOAM INSUL.
STRAPPING
COMPOSITE DECKING 1/2" GWB
SHAPED PT JOIST
MEMBRANE STRIP
MEMBRANE ROOFING
MEMBRANE BACKER
TAPERED INUSLATION
3 Sto 3/4" T&G SHEATHING
ry R=49 SPRAY FOAM INSUL.
STRAPPING
GWB / / I ♦ 2X8 LEDGER W/ 2-3/8" LAGS 2" EM
.01 i� I �� �1� TO TARGET
` II II �, 1iiJ
II II � II
II II II
II II -
ASPHALT SHINGLES
I I I I 15 LB FELT PAPER
FINISH FLOORING (( T&G 4X8 @ 3' O.C.
3/4" OSB T&G, S&G.
JOIST SEE STRUCTURAL I f
\ (� FOAM INSULATION R 30 '
2 Story
1
\ I I II
1 I II
STEEL BEAM I I
II o
a) FINISH FLOORING 5/4 COMPOSITE DECKING
\ 3/4" OSB T&G, S&G. I 00 PT 2X8 @ 16" O.C.
JOIST SEE STRUCTURAL I I
R= 30 INSUALTION I I I
GWB OR FIRE PROOF TJI I
T LEDGER W/ 2-3/8' LAGS 2" EMBEDME
TO TARGET
1 Story
'li
II
a:
II
I(
I II e
5" CONCRETE SLAB W/ 6x6 WWF I I
10 MIL VAPOR BARRIER I
COMPACTED SAND
23'-1"
-8"
-1 storyliI I
d
Building Section 2
`I®
a
d
+18'-8"
3 Story
+8'-6"Ah
2 Story
±0"Ah
1 Story
DRAWING A3
E
,gk+
3 Story
,gk+8'-6"
2 Story
1 Story
-qr
-1 Story
ASPHALT SHINGLES
15 LB FELT PAPER
(ICE & WATER @ EAVE)
5/8" OSB
2X10@16"O.C.
R=49 SPRAY FOAM INSUL.
STRAPPING
1/2" GWB
FINISH FLOORING
3/4" OSB T&G, S&G.
JOIST SEE STRUCTURAL
INSULATION R=30
STRAPPING
5/8" GWB
Project:
DATE:
103 River South Yarmouth MA
Feb.-21-23
Owner:
The Hearn's
Architect" Sangiolo Associates Architects
www.sangioloassociates.com
617 272 5402
/
Structural
9
fi
C*
Drawing:
A8
BUILDING SECTIONS
PERMIT DRAWINGS
5" CONCRETE SLAB W/ • • WWF
10 • • • ■ BARRIER
COMP 'CTED SAND
Building Section 3
a
5