Loading...
HomeMy WebLinkAboutCOC RequestCAPE COD ENGINEERING, INC. Robert M. Perry, P.E. P.O. Box 1517 East Dennis, MA 02641 Tel 508-385-1445 / Fax 508-385-1446 bobperryna,capecod.net July 11, 2023 Town of Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 RE: 911 Great Island Road, West Yarmouth; SE 83-1852- Certificate of Compliance To the Conservation Commission, Attached please find Form 8A and a check in the amount of $75 for a Request for Certificate of Compliance for SE 83-1852 issued in 2009 for coastal stabilization at 911 Great Island Road, West Yarmouth. A series of efforts were made during the term of the Order for maintaining sand cover. Several storms occurring in 2018 eradicated the southern segment of coir logs. The north segment, north of the stairs remains in place. The applicant intends to file a Notice of Intent for purposes of continuing with sand cover. However, an alternate approach would be some form of on -going, perhaps time limited, provision for sand nourishment in the COC. That option is requested with this application but is at the discretion of the Commission. Based on my knowledge, information, belief and with professional judgement from a long-term monitoring of the site and related permit plans, the completed project warrants issuance of a Certificate of Compliance. Thank you for your assistance and cooperation. Sincerely, Cape Cod Engi a ring, Inc. Robert M erry Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands Ll' WPA Form 8A — Request for Certificate of Compliance SE 83-1852 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. rab s� 1. This request is being made by: Cape Cod Engineering, Inc. Name PO Box 1517 Mailing Address East Dennis City/Town 508-385-1445 Phone Number MA State 2. This request is in reference to work regulated by a final Order of Conditions issued to: Upon completion of the work 3• authorized in an Order of Conditions, the property owner must request a Certificate of Compliance 4' from the issuing authority stating that the work or portion of the work has been satisfactorily completed. Dewey & Margaret Awad Applicant 3/23/2009 SE 83-1852 Dated DEP File Number The project site is located at: 911 Great Island Road West Yarmouth Street Address City/Town 3 3 Assessors Map/Plat Number Parcel/Lot Number The final Order of Conditions was recorded at the Registry of Deeds for: Property Owner (if different) Barnstable County Doc# 1,110,121 Cert #182034 Certificate (if registered land) 5. This request is for certification that (check one): Book 02641 Zip Code Page ® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doc -- rev. 5/29/14 Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A — Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information (cont.) DEP File Number: SE 83-1852 Provided by DEP 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. FEW B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass.ciov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office- for-your-city-or-town.htmi). wpaform8a.doc -- rev. 5129/14 Page 2 of 2