Loading...
HomeMy WebLinkAbout24 Wharf Ln plan 3"TYVEK" HOUSEWRAP �2' CDX PLYWOOD 2x6 * 16" O.C. R-21 FIBERGLASS INSUL. 6 MIL. POLY VAPOR BARRIER �2' G.W.B. :U<A 3/4" T4G PLYWD. SUBFLOOR GLUE $ NAiL TO JOISTS SIDING SEE ELEVATION RIM JOIST OR DBL. PERIMETER %2 CDX P.T. PLYWD. BOTTOM 6" 2x6 P.T. SILL X lo's @16" O.C. SILL SEALER 5/5" ANCHOR BOLTS 0 36" O.C. MIN. 7" EMBEDMENT I w/3"x3"x1/4" PLATE WASHER ii FILL It TAMP 5' OUT FOR ° I"/FT. SLOPE- PROVIDE 12" BED OF 3/' STONE I I a WHERE NO GUTTERS 4 ° _ a 2 CAD #5 REBARS CONT. $ AROUND ALL OPENINGS a a a DAMPROOFING ° I DO NOT BACKFILL WALL UNTIL CONCRETE HAS ATTAINED 7 DAY STRENGTH AND BOTH TOP It BOTTOM OF WALL ARE PROPERLY SERCURED. 20 #5 REBARS, CONT. TOP t BOTTOM CARRY DAMPROOFING OVER TOP OF FOOTING 2X4 KEYWAY TYPICAL SILL DETAIL SCALE 1-1/2" = 11-011 ° d d. 4 ° — d d ° d d d d— — a I ° ° d d a ° d BiT. JT. FILLER, TOP OFF W/ FLEXIBLE JOINT SEALANT WWF 6X6 6/6, TOP 1/3 OF SLAB 4" CONC. SLAB 6" COMPACTED FILL d d ° NOTE: FOOTING SHALL BEAR ON COMPACTED GRANULAR FILL OR NATURAL UNDISTURBED GRANULAR SOILS FREE OF CLAY, PEAT, LOAM. VEGETATIVE OR ORGANIC MATERIAL NOTIFY ARCHITECT IMMEDIATELY IF DIFFERENT CONDITIONS ARE ENCOUNTERED. GARAGE FOUNDATION DRAIN I SLAB t FOOTING SCALE i—i/2" = l'-0" DOWELS EVERY 12" AND SEAL LINE OF EXISTING STRUCTURE LINE OF EXISTING STRUCTURE SCALE: N.T.S. 2 3/, END DIST, E CONNECTION BEAM I$ STRAP LSTA 0 EA. RAFTER RIDGE PLATE �� NOTE: RIDGE STRAPS ARE NOT REQUIRED WHEN COLLAR TIES OF NOMINAL 1x(o OR 2x4 LUMBER ARE RIDGE SAND STRAi� LOCATED THIRDOF T14E IN TIC SPACE AND SCALE: N.T.S. ATTACHED TO RAFTERS USING 5)106 NAILS EACH END SASEIYENT NOTES: 1. MAIN FOUNDATION WALLS TO BE 5" POURED CONC. W/ 20#5 BARS TOP 4 BOTTOM REST FOUNDATION ON 10"X16" STRIP FOOTING, PROVIDE 30#5 HORIZ. BARS CONTINUOUS IN STRIP FOOTING W/ KEYWAY. PROVIDE #5 VERT. DOWELS 0 24" O.C. HORIZ. EXTENDED V-6" MIN. ABOVE TOP OF FOOTING. PROVIDE 5/8" ANCHOR BOLTS 0 36" O.C. MAX. MIN 7" EMBEDMENT w/3"x3"xl/4" PLATE WASHER 2. ALL STRUCTURAL STEEL COLUMNS TO BE 3 1/2" CONCRETE FILLED LALLY COLUMNS TO EXTEND TO FOOTING BELOW. PROVIDE 6"x6"x5/8" CAP PLATE * 7"xi2"x3/4" BASE PLATE W/ 2 03/4" DIA. BOLTS. WELD ALL CONNECTIONS FOOTINGS TO BE 36"x36"x12" SQUARE CONCRETE W/ 3 #5 BARS EACH WAY. 3. DOUBLE FLOOR JOISTS UNDER ALL PARALLEL PARTITIONS. 4. CONCRETE SLAB TO BE 4" POURED CONC. ON COMPACTED FILL. CUT JOINTS ALONG WALLS AND BEAM COLUMN LINES. 5. CONTRACTOR TO PROVIDE BASEMENT VENTILATION AS REQUIRED BY CODE (WINDOWS OR MECHANICAL) 6. CONTRACTOR SHALL ENSURE THAT ALL FOUNDATION WALLS MAINTAIN 4'-0" MINIMUM COVER. 7. PROVIDE WEB STIFFENING PLATES AT ENDS OF STEEL BEAMS, TYR. 8. SEE STRUCTURAL DRAWINGS FOR LOCATIONS OF ALL STRUCTURAL COLUMNS. q. CONTRACTOR SHALL NOT SCALE DRAWINGS FOR DIMENSIONS. ANY MISSING, INCORRECT, OR QUESTIONABLE DIMENSIONS NOT BROUGHT TO THE ATTENTION OF THE DESIGNER BECOME THE RESPONSIBILITY OF THE CONTRACTOR. I C0 ' —011 24' —011 L 5/8" ANCHOR BOLTS 0 36" O.C. 2868 MINI 7"EMBEDMENT PROPOSED w/3 x3' xi/4' PLATE WASHER FOUNDATION PLAN AREA: 570 SQ, FT. 4" CONC. SLAB PITCH TO GARAGE OPENING DOWELS EVERY 12" AND SEAL , 21 _0" 24' -0" FOU N DAT 1 ON F L.AN SCALE: 1/4" - 1'-0" CONTINUOUS RIDGE VENT ASPHALT ROOF SHINGLES 5/8" CDX SHEATHING — 15# BUILDING PAPER — 21X1015 ® 16" O-C. RAFTER VENT -t 1X FASCIA W/ ALUMINUM GUTTER SECOND FLOOR COR-A-VENT STRIP VENT iX SOFFIT FIRST FLOOR GARAGE FLOOR 2 X 12 RIDGE 2 X 8' @ 16" O.C. ALIGN WITH EXITING DORMER EDROOM \ r � � PROPOSED Nt BEDRO M # BE OM #I PROPOSED RCFOSE5 �q 2'X1015 ® 16" O.G. 3)1 3/4x14" LVL GARAGE PROPOSED 6" COMPACTED FILL 6X6 6/6 WWF TOP 1/5 OF SLAB 24' —0'1 SECTION SCALE: 1/4" = 1'=0" PROPOSED - R-21 FBGLS. INSUL 2X6616" O.C. 1/2" CDX. SHEATHING 1/2" GWB VAPOR BARRIER - TYVEK HOUSEWRAP SIDING (SEE ELEVS.) 2X6 P.T SILL W/ SILL SEALER Front Elevation Method PFH (Portal Frame With Hold -Downs) Extent of header with double portal frame (two braced wall panels) Extent of header with single portal frame (one braced wall panel) —� A I 2'-0" to 1 1' finished width of opening for single or double portal A Section A Min. 3°x111la"header (if padded out for thickness. Min. 31s"thick wood f structural panel (WSP) Pony wail ° place spacer material on the interior side height of header). Steel headers are prohibited. Tensian strap per eoa< Table R602.10.6.4 (placed on interior side of wall) Fasten wood structural panel (WSP) to header with 8d common or o Fasten top plate to Max. ° galvanized box nails in 3" grid pattern as shown header with two rows 12' 0" os 41e e ofl6dsinker nails at oral wall 9 e Header to jack stud strap per Table R602.10.6.4 on both e o 3" o.c. typ. Fasten king height Max. o a sides of opening, placed on interior side of wall o stud to header with 10 -O' ° Min. double 2x4 framing covered with min. 3l8"-thick WSP (6)16d sinkers. height with 8d common or galvanized box nails at 3" o.c. in all Min. double If needed, panel splice edges � a ° o ° framing (studs, blocking, and sills), typical 2x4 post (king ° shall occur over and he nailed 1 I and jack stud). to common blocking within Min. length of panel per Table R602.10.5 ° fJurn er of jack 24" of the portal leg mid -height. Min. (2) 3.56114. strap type hold-down anchors studs per Tables o One row of 3" D.C. nailing is R602 (embedded into concrete and nailed into framing) J(1l and (2). ° ° required in each panel edge. Min.1,000-lb. hold-down device (embedded into Min. (2) strap type ° ° a concrete and nailed into framing) hold-down anchors I IJ II Ii Min, reinforcing of Min. (1) 51e"-diameter anchor bolt installed per Section R40 A with 2"x 2"x 3hs" plate washer foundation, (1) #4 bar top A A and bottom of footing. Min. footing size under opening is 12"x 12 A tumed-down slah shall be permitted at door openings. Lap bars 15" minimum. i i P� Q � L � W Z W �3 W � W o o V) Q � W z W 3 Q U