Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. ci q Lot r) -42 Zone of Contribution: In X Out Acreage 4'2),3e;6 5E= Commercial: Residential: L...---- Street: *78 0124 1-4-Qik►›-tJt S -0A" Village: y4,44-1.„4 �- Floor Plan: tl #Bedrooms: 4- Owner: S ��C--P S (4-v Installer: Address:ii, Si tie-L-14-va_.Rb, 5tilt-4: Se,- Phone: Phone: cole, 4t,ln3 Z4 o,1 jPPych+-T- -Buiiuer:- --b cv FR-/t-S - g �s..�o�a,� (SCAN-+��t�L En ineer: ►J LAhE Address: Phone: cos-S4L 4S'4 1 Phone: N/A YES NO 1. Required#of copies received 0..) r v- cL Z. -- V 2. Date of soils exam and percolation test not older than 2 years t/- 3. 4-5 ft of naturally occurring pervious material, above water table V 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: t/ 5. Water line 10 ft from septic components Var.: , -- 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: ✓ 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: I/ 9. Leaching minimum 100 ft from wetlands Var.: ,✓ 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: V 11. Tank/leaching minimum 10 ft from property line Var.: / 12. System meets all other setback requirements Var.: v/ 13. Uses adjustment for maximum high groundwater Var.: ✓ 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: / 15. System not in top or subsoil (A,B horizons)or 5' removal / 16. Proposed contours are suitable V 17. System meets slope requirements-min. 1/8", '/"preferred t/ 18. System meets breakout requirements N -€.�S PVC liner: Wall: V 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel V 21.No garbage disposal J 22. System adequately sized for its intended use ✓ 23. Minimum 6"stone or compacted below tank and dbox ' 24. Manhole covers within 6"of grade,pump chamber cover to grade 25. Inspection port on plastic chambers/leach field V 26. Electrical permit for pump chamber/Separate meter for duplexes ✓ 27. Pump system-2"line,weep hole,check valve, tee in dbox,pump size / 28. Septic tank/pump chamber to be factory waterproofed / 29. Vent provided if leaching below 3 feet,under driveway/parking V 30. Buoyancy calculations for tank/pump chamber ✓ 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ✓ 33. H-20 loading is subject to vehicular traffic, groundwater ✓ 34. Title V Application and permit fee,installer signature ✓ 35. Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: ' 'ftick 6/03/03