HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M.- Lot- / (- �-J� Zone of Contribution: In_ Out / Acreage
� 7- Commercial: Residential:
Street: �� 1 4Vilge: 3g Sems' lJ; „he_ r
Floor Plan: #Bedrooms: 3
Owner: Q
Address:wner: Installer: ob. C our-
Phone:
/ `
Phone:
Builder: Engineer:
Address: r l ���T
Phone: Phone:
1. Required#of copies received i
NIA YES NO_
2. Date of soils exam and percolation test not older than 2 e yars !/
3. 4-5 ft of naturally occurring pervious material,above water table
4. Foundation 2 ft above highpoint of road ---
H.P.: Fnd: Var.: � -
5. Water line 10 ft from septic components Var.: I 6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: If
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.: Z.c/
1 12. System meets all other setback requirements Var.: \
13. Uses adjustment for maximum high groundwater Var.: �'
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: i
I
15. System not in top or subsoil (A,B horizons)or 5' removal I v
16. Proposed contours are suitable !ice
17. System meets slope requirements-min. 1/8", 'A"preferred
18. System meets breakout requirements PVC liner: Wall: I ZV
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel v
21. No garbage disposal L
22. System adequately sized for its intended use U
23.Minimum 6"stone or compacted below tank and dbox v
24. Manhole covers within 6"of grade, pump chamber cover to grade I v
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes 1/
27.Pump system-2"line,weep hole,check valve, tee in dbox, pump size
28. Septic tank/pump chamber to be factory waterproofed I
29. Vent provided if leaching below 3 feet,under driveway/parking .�
30. Buoyancy calculations for-tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial: I
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature I
��33.H-20 loading is subject to vehicular traffic,groundwater
34.Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd I .�
37. Check area lots for groundwater/Label groundwater in Assessor's Map I L�
Plan reviewed by:. . cNcadt-z,e,----