HomeMy WebLinkAbout453 Station Ave CVS plan 13IS
O
PHARMACY
2 7 911Q0„
CONSULTING
ROOM
2 7
271
OPEN TO RETAIL
I I
HALLWAY
I I
2 5
109
7
8 -o" I I
I
WOMEN'S
RESTROOM II
2 5
Q�)10-8
I
14
g -0"
II
MEN'S
RESTROOM II
2 5
107
(I
8 -0"
14
EMPLOYEE
LOUNGE II
5 7
1 55 II
10
8 0 I
° II
it
°
II
I I
°I
RECEIVING
AREA II
106
B.O.
J: 13'-3 1 /8
B.O.D:
14'-3 3/4
I I
I
I
I I
IL=J
MANAGER'S
OFFICE
104
7'-11 1 /8"
(D
T FINISH PLAN
A4 1/8" = 1'-0°
(CLOSED) HH (CLOSED)
Rx WAITING EXAM ROOM #1 EXAM ROC
111E 115 116
8'-11 11/16" 7'-11 11/16" 7'-11 5/'
P'_A"4-
TALK-IN
DOLER
DOORS
� � I PHOTO LAB
F i 6
103
11'-10 3/8"
I (BY G. �- 7
11 2'-10" 6> 1„
2
■ � 17'-11 "t 23'-3"f I
I
F 7 �
// (BY INTERFACE) j ///// N FF16
o I CHECKOUT
/ FF5 J� ///j % j/� 6' 8 + I 1111'-1023/8„
FF16 �/j j �
BY INTERFACE) �r rr
ug
o
(BY G.C.)
N 12 FF16 ' I
r �r III
r r��. I VESTIBULE
11'-10 07/8"
2 7 15
12
I II
12`-6„t I I I
11I I I II
RETAIL AREA 0_�
11'-1011/16" I-___ � --- '=�-------M------�__=- -�
w
NOTES
1. VERIFY ALL WORK AND MEASUREMENTS 2. COORDINATE LOCATION OF FLOOR FINISH
IN FIELD BETWEEN CVS PROJECT TRANSITIONS WITH MERCHANDISE PLAN.
MANAGER AND GENERAL CONTRACTOR
PRIOR TO ANY WORK BEING DONE.
LEGEND
XXXX FINISH DESIGNATION - REFERENCE
NEW CERAMIC TILE
FINISH SCHEDULE
---® KEY NOTE DESIGNATION
NEW RIBBED CARPET TILE
(ENTRANCE)
NEW CARPET TILE AS SCHED.
(RETAIL)
��
LUXURY VINYL TILE
NEW CUSHION BACK CARPET TILE
SEALED CONCRETE
DRIVE AISLE CARPET TILE
NEW AUDIOLOGY CARPET TILE
DRIVE AISLE NODE &CENTERLINE
NEW OSHA EGRESS PAINT
NOTES BY SYMBOL (®)
1.
SCRAPE, SAND, AND PAINT EXISTING
9.
EXISTING & NEW LVT REQUIRES AN
COLUMNS PT20 AS SHOWN
RH MOISTURE TEST. REF: LVT
MOISTURE MITIGATION ON DWG. A4
2.
PATCH/PAINT WALLS AS
SHOWN/SCHEDULED. RE: FINISH
10.
CLEAN EXISTING WALLCOVERING
SCHEDULE
11,
EXACT LOCATION OF DRIVE -AISLE TO
3.
SAND & PAINT DOOR FRAMES. PT20
BE COORDINATED WITH FINAL
RE: FINISH SCHEDULE.
MERCHANDISE PLAN AND FIXTURE
INSTALLERS.
4.
PATCH & PAINT RX VALANCE (RED)
AS SHOWN/SCHEDULED RE: FINISH
12.
START CENTER OF DRIVE -AISLE AT
SCHEDULE
CENTER OF ENTRY DOORS.
5.
PAINT CEILING AS SHOWN. REF:
13.
CLEAN TOPS, EXTERIOR, & GRILLES OF
FINISH SCHEDULE
EXISTING COOLERS/FREEZERS.
6.
G.0 TO TEMPORARILY PATCH EXISTING
14.
THOROUGHLY CLEAN AND SANITIZE ALL
CARPET AS REQUIRED FOLLOWING
SURFACES
MERCHANDISE MOVES
15.
G.C. TO CLEAN WINDOW GLASS IN
7.
INSTALL NEW CARPET AND WALLBASE
VESTIBULE
AS SHOWN/SCHEDULED. RE: FINISH
SCHEDULE
16.
CLEAN WINDOW SILLS AROUND
,
PERIMETER OF RETAIL STORE
8.
INSTALL NEW LVT AND WALLBASE AS
SHOWN/SCHEDULED. RE: FINISH
SCHEDULE
LVT MOISTURE MITIGATION
FOR QUESTIONS RELATED TO FLOORING INSTALL AND MITIGATION STEPS, PLEASE CONTACT THE PROJECT SPECIFIC NAI
VENDOR OR THE BELOW APPROVED INSTALLER:
ANDREA HAGEMAN MITCHEL FARIA JACK GENCO
INSIDE EDGE MATS INC. INTERFACE SERVICES
ahageman@iecis.com mfaria@matsinc.com Jack. Gen co&nterface. corn
651.389.4212 781-573-0292 508-523-1859
NOTE: MITIGATION AND INSTALLATION ONLY. PRODUCT SUPPLIED BY NAI VENDOR TO GC.
PROCESS:
• GC IS RESPONSIBLE FOR CONCRETE SLAB MOISTURE AND RELATIVE HUMIDITY (RH) TESTING REQUIRED FOR
ALL PROJECTS.
• TESTING TO BE CONDUCTED IN AREAS WHERE LVT TO BE INSTALLED. MAXIMUM OF 4 PROBES PER TYPICAL
LOCATION (LARGER STORES MAY REQUIRE FURTHER PROBES).
• HIGHEST MOISTURE TESTING RESULT FOR THE ENTIRE STORE SHOULD BE USED AS THE BASIS FOR BELOW
MOISTURE MITIGA11ON STEPS RELATED TO ADHESIVE TYPE AND OTHER MITIGATION SELECTION.
• PRODUCT SPECIFICATIONS OR EQUIVALENT TO BE APPROVED BY SPM FOR ALL PROJECTS.
RH VALUE RANGE FOR LVT:
100% <RH
100% RH ALTERNATIVES
TAYLOR RESOLUTE
TRAXX100
SPRAYLOCK 6500 PLATINUM
SCHONOX EPA
AQUAFLEX**
GENERAL NOTES:
1. PROVIDE TRANSITION STRIP BETWEEN ALL FLOOR TYPES.
2. DEMOLITION NOTES SHOULD ONLY BE USED IF APPLICABLE FOR SITE -SPECIFIC PROJECTS.
#*CVS
pharmacy"
RESET
STORE NUMBER: 00944
453 STATION AVENUE
SOUTH YARMOUTH, MA 02664
CAP CODE: 00072
CS PROJECT NUMBER: 163445
STARCK
ARCHITECTS
126 Cove Street
Fall River, MA 02720
1 Richmond Square, Suite 120C
Providence, RI 02903
MA 508.679.5733
RI 401.709.7799
STARCKARCHITECTS.COM
CONSULTANT ENGINEER
CONSULTANT
SEAL:
��FLED AROy
VFI0 r�
tr _ �0
.951251
o
J0
4TH OF MPSSAG
IONS:
DRAWING/REVIEWED BY: PPY/MJT
CVS PROJECT MANAGER: SH
DATE: 08/08/2022
JOB NUMBER: 163445
TI TLE:
FINISH PLAN
SHEET NUMBER:
A4
COMMENTS: