Loading...
HomeMy WebLinkAbout453 Station Ave CVS plan 13IS O PHARMACY 2 7 911Q0„ CONSULTING ROOM 2 7 271 OPEN TO RETAIL I I HALLWAY I I 2 5 109 7 8 -o" I I I WOMEN'S RESTROOM II 2 5 Q�)10-8 I 14 g -0" II MEN'S RESTROOM II 2 5 107 (I 8 -0" 14 EMPLOYEE LOUNGE II 5 7 1 55 II 10 8 0 I ° II it ° II I I °I RECEIVING AREA II 106 B.O. J: 13'-3 1 /8 B.O.D: 14'-3 3/4 I I I I I I IL=J MANAGER'S OFFICE 104 7'-11 1 /8" (D T FINISH PLAN A4 1/8" = 1'-0° (CLOSED) HH (CLOSED) Rx WAITING EXAM ROOM #1 EXAM ROC 111E 115 116 8'-11 11/16" 7'-11 11/16" 7'-11 5/' P'_A"4- TALK-IN DOLER DOORS � � I PHOTO LAB F i 6 103 11'-10 3/8" I (BY G. �- 7 11 2'-10" 6> 1„ 2 ■ � 17'-11 "t 23'-3"f I I F 7 � // (BY INTERFACE) j ///// N FF16 o I CHECKOUT / FF5 J� ///j % j/� 6' 8 + I 1111'-1023/8„ FF16 �/j j � BY INTERFACE) �r rr ug o (BY G.C.) N 12 FF16 ' I r �r III r r��. I VESTIBULE 11'-10 07/8" 2 7 15 12 I II 12`-6„t I I I 11I I I II RETAIL AREA 0_� 11'-1011/16" I-___ � --- '=�-------M------�__=- -� w NOTES 1. VERIFY ALL WORK AND MEASUREMENTS 2. COORDINATE LOCATION OF FLOOR FINISH IN FIELD BETWEEN CVS PROJECT TRANSITIONS WITH MERCHANDISE PLAN. MANAGER AND GENERAL CONTRACTOR PRIOR TO ANY WORK BEING DONE. LEGEND XXXX FINISH DESIGNATION - REFERENCE NEW CERAMIC TILE FINISH SCHEDULE ---® KEY NOTE DESIGNATION NEW RIBBED CARPET TILE (ENTRANCE) NEW CARPET TILE AS SCHED. (RETAIL) �� LUXURY VINYL TILE NEW CUSHION BACK CARPET TILE SEALED CONCRETE DRIVE AISLE CARPET TILE NEW AUDIOLOGY CARPET TILE DRIVE AISLE NODE &CENTERLINE NEW OSHA EGRESS PAINT NOTES BY SYMBOL (®) 1. SCRAPE, SAND, AND PAINT EXISTING 9. EXISTING & NEW LVT REQUIRES AN COLUMNS PT20 AS SHOWN RH MOISTURE TEST. REF: LVT MOISTURE MITIGATION ON DWG. A4 2. PATCH/PAINT WALLS AS SHOWN/SCHEDULED. RE: FINISH 10. CLEAN EXISTING WALLCOVERING SCHEDULE 11, EXACT LOCATION OF DRIVE -AISLE TO 3. SAND & PAINT DOOR FRAMES. PT20 BE COORDINATED WITH FINAL RE: FINISH SCHEDULE. MERCHANDISE PLAN AND FIXTURE INSTALLERS. 4. PATCH & PAINT RX VALANCE (RED) AS SHOWN/SCHEDULED RE: FINISH 12. START CENTER OF DRIVE -AISLE AT SCHEDULE CENTER OF ENTRY DOORS. 5. PAINT CEILING AS SHOWN. REF: 13. CLEAN TOPS, EXTERIOR, & GRILLES OF FINISH SCHEDULE EXISTING COOLERS/FREEZERS. 6. G.0 TO TEMPORARILY PATCH EXISTING 14. THOROUGHLY CLEAN AND SANITIZE ALL CARPET AS REQUIRED FOLLOWING SURFACES MERCHANDISE MOVES 15. G.C. TO CLEAN WINDOW GLASS IN 7. INSTALL NEW CARPET AND WALLBASE VESTIBULE AS SHOWN/SCHEDULED. RE: FINISH SCHEDULE 16. CLEAN WINDOW SILLS AROUND , PERIMETER OF RETAIL STORE 8. INSTALL NEW LVT AND WALLBASE AS SHOWN/SCHEDULED. RE: FINISH SCHEDULE LVT MOISTURE MITIGATION FOR QUESTIONS RELATED TO FLOORING INSTALL AND MITIGATION STEPS, PLEASE CONTACT THE PROJECT SPECIFIC NAI VENDOR OR THE BELOW APPROVED INSTALLER: ANDREA HAGEMAN MITCHEL FARIA JACK GENCO INSIDE EDGE MATS INC. INTERFACE SERVICES ahageman@iecis.com mfaria@matsinc.com Jack. Gen co&nterface. corn 651.389.4212 781-573-0292 508-523-1859 NOTE: MITIGATION AND INSTALLATION ONLY. PRODUCT SUPPLIED BY NAI VENDOR TO GC. PROCESS: • GC IS RESPONSIBLE FOR CONCRETE SLAB MOISTURE AND RELATIVE HUMIDITY (RH) TESTING REQUIRED FOR ALL PROJECTS. • TESTING TO BE CONDUCTED IN AREAS WHERE LVT TO BE INSTALLED. MAXIMUM OF 4 PROBES PER TYPICAL LOCATION (LARGER STORES MAY REQUIRE FURTHER PROBES). • HIGHEST MOISTURE TESTING RESULT FOR THE ENTIRE STORE SHOULD BE USED AS THE BASIS FOR BELOW MOISTURE MITIGA11ON STEPS RELATED TO ADHESIVE TYPE AND OTHER MITIGATION SELECTION. • PRODUCT SPECIFICATIONS OR EQUIVALENT TO BE APPROVED BY SPM FOR ALL PROJECTS. RH VALUE RANGE FOR LVT: 100% <RH 100% RH ALTERNATIVES TAYLOR RESOLUTE TRAXX100 SPRAYLOCK 6500 PLATINUM SCHONOX EPA AQUAFLEX** GENERAL NOTES: 1. PROVIDE TRANSITION STRIP BETWEEN ALL FLOOR TYPES. 2. DEMOLITION NOTES SHOULD ONLY BE USED IF APPLICABLE FOR SITE -SPECIFIC PROJECTS. #*CVS pharmacy" RESET STORE NUMBER: 00944 453 STATION AVENUE SOUTH YARMOUTH, MA 02664 CAP CODE: 00072 CS PROJECT NUMBER: 163445 STARCK ARCHITECTS 126 Cove Street Fall River, MA 02720 1 Richmond Square, Suite 120C Providence, RI 02903 MA 508.679.5733 RI 401.709.7799 STARCKARCHITECTS.COM CONSULTANT ENGINEER CONSULTANT SEAL: ��FLED AROy VFI0 r� tr _ �0 .951251 o J0 4TH OF MPSSAG IONS: DRAWING/REVIEWED BY: PPY/MJT CVS PROJECT MANAGER: SH DATE: 08/08/2022 JOB NUMBER: 163445 TI TLE: FINISH PLAN SHEET NUMBER: A4 COMMENTS: