Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLDX-23-12429 (2)
/rl6c/ led 5/iq/Z3 ONE & TWO FAMILY ONLY- BUILDING PERMIT Town of Yarmouth Building Department ff... 1146 Route 28, South Yarmouth,MA 02664-4492 508-398-2231 ext. 1261 Fax 508-398-0836 Massachusetts State Building Code,780 CM-R. �, e Building Permit Application To Construct, Repair, Renovate Or Demolish a One-or Two-Family Dwelling This Section For Official Use Oaly Building Permit Number: Qj(, J31149 Date Applied: —REC Building Official(Print Name) Signature �at� y e' D SECTION 1:SITE INFORMATION 1.1 Property Address: 1.2 Assessors Map&Parcel Numbers MAY 1 G 2023 31 Taft Rd 1.1 a Is this an accepted street?yes no Map Number Parcel Num.se6 U I L DI N G D E PART M E N T 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required J Provided Required Provided Required Provided 1.6 Water Supply: (Ivi.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public 0 Private C Zone: — Outside Flood Zone? Municipal 0 On site disposal system 0 Check if yesO SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record: Thomas Nehmer Yarmouth, MA 02673 Name(Print) City,State,ZIP 31 Taft Rd (413)478-0881 No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK2(check all that apply) New Construction❑ I Existing Building❑ Owner-Occupied 0 I Repairs(s) 0 Alteration(s) 0 I Addition 0 Demolition ❑ Accessory Bldg. 0 Number of Units Other 151 Specify: Brief Description of Proposed Work': Install 3.24 kW solar panels on roof. Will not exceed roof panel but will add 6"to roof height. 8 total panels. SECTION 4:ESTIMATED CONSTRUCTION COSTS • Item Estimated Costs: Official Use Only (Labor and Materials) 1.Building $ 1,000 1. Building Permit Fee:$/5Z)_Indicate how fee is determined: 2.Electrical $ 16,000 0 Standard City/Town Application Fee ❑Total Project Cost3(Item 6)x multiplier x 3.Plumbing $ 2. Other Fees: $ 4.Mechanical (HVAC) S List: elk i9 ©t,ncl 5.Mechanical (Fire $ Suppression) Total All Fees:$ • Check No. Check Amount: Cash Amount: 6.Total Project Cost: $17,000 ❑Paid in Full 0 Outstanding Balance Due: SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) Bruce A Junior Trinity Solar Inc CSFA-067961 07/13/2024 License Number Expiration Date Name of CSL Holder List CSL Type(see below) R 20 Patterson Brook Road Unit 1 No.and Street Type Description W Wareham, MA 02576 U ; Unrestricted(Buildings up to 35,000 cu.ft.) R Restricted l(&2 Family Dwelling City/Town,State,ZIP Ivl Masonry RC I Roofing Covering WS I Window and Siding SF Solid Fuel Burning Appliances 732-722-1278 permits.wareham@trinity-solar.com I Insulation Telephone Email address D I Demolition 5.2 Registered Home Improvement Contractor(BIC) 170355 10/11/2023 Bruce A Junior Trinity Solar Inc HIC Registration Number Expiration Date HIC Company Name or HIC Registrant Name 20 Patterson Brook Road Unit 1 permits.wareham@trinity-solar.com No.and Street W Wareham, MA 02576 732-722-1278 Email address City/Town,State,ZIP Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes 4( No ❑ SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize Bruce A Junior to act on my behalf,in all matters relative to work authorized by this building permit application. Thomas Nehmer 5/8/2023 Print Owner's Name(Electronic Signature) Date • SECTION 7b: OWNER'OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. Bruce A Junior 5/8/2023 Print Owner's or Authorized Agent's Name(Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor I (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A. Other important information on the HIC Program can be found at www.mass.gov/oca Information on the Constriction Supervisor License can be found at www.mass.gov/dps 2. When substantial work is planned,provide the information below: Total floor area(sq.ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq.ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of hal'baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" Commonwealth of Massachusetts Division of Occupational Licensure Board of Building R ulations and Standards constructios`t t &2 Family CSFA-067961 y . empires:07/13/2024 BRUCE A J1 IOR 8 SOMERVILtE MARSHFIELL� Commissioner diatiG I; Fitru�;�, THE COMMONWEALTH OF MASSACHUSETTS Office of Consumer Affairs and Business Regulation 1000 Washington Street- Suite 710 Boston, Massachusetts 02118 Home Improvement Contractor Registration Type: Supplement Card Registration: 170355 TRINITY SOLAR INC. Expiration: 10/11/2023 D/B/A TRINITY SOLAR 2211 ALLENWOOD ROAD _ WALL,NJ 07719 Update Address and Return Card. THE COMMONWEALTH OF MASSACHUSETTS Office of Consumer Affairs&Business Regulation Registration valid for individual use only before the HOME IMPROVEMENT CONTRACTOR expiration date. If found return to: TYPE:Supplement Card Office of Consumer Affairs and Business Regulation Registration E piration 1000 Washington Street -Suite 710 170355 10/11/2023Boston,MA 02118 TRINITY SOLAR INC. D/B/A TRINITY SOLAR PE ON 20 20 PATTERSON BROOK ROAD UNIT 10 �r,,.r. WESTWAREHAM,MA 02576 Undersecretary Not valid wiffTout signature A CERTIFICATE OF LIABILITY INSURANCE DATE(MMIDD/YYYY) 5/13/2022 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CNAME: Mark Grasela Arthur J. Gallagher Risk Management Services, Inc. PHONE .ExU:856 482-9900 FAX v,No):856 482-1888 4000 Midlantic Drive Suite 200 E-MAIL Mount Laurel NJ 08054 ADDRESS: CherryHill.BSD.CertM@AJG.com INSURER(S)AFFORDING COVERAGE NAIC 0 INSURER A:Gotham Insurance Company 25569 INSURED TRINHEA-03 INSURER B:National Union Fire Insurance Company of Pittsburg 19445 Trinity Solar Inc. 20 Patterson Brook Road, Unit 1 INSURER C:Liberty International Underwriters W. Wareham, MA 02576 INSURERD: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER:590414193 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY EFF POLICY EXP L1MRS LTR INSD WVD POLICY NUMBER ,(MDD/YYYY) (MMIDD/YYYYI A X COMMERCIAL GENERAL LIABILITY GL202100013378 6/1/2021 6/1/2023 EACH OCCURRENCE $2,000,000 DAMAGE TO RENTED CLAIMS-MADE X OCCUR PREMISES(Ea occurrence) $100,000 MED EXP(Any one person) $5,000 PERSONAL&ADV INJURY $1,000,000 GENL AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2,000,000 POLICY X jE d LOC PRODUCTS-COMP/OP AGG $2,000,000 OTHER: $ 8 AUTOMOBILELIABILITY CA 2960145 6/1/2022 6/1/2023 COMBINED SINGLE LIMIT $2,000,000 (Ea accident) X ANY AUTO BODILY INJURY(Per person) $ — OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY (Per accident) A UMBRELLA LAB X OCCUR EX202100001871 6/1/2021 6/1/2023 EACH OCCURRENCE $5,000,000 C X EXCESS UAB ELD30006989101 6/1/2022 6/1/2023 CLAIMS-MADE 1000231834-06 6/1/2022 6/1/2023 AGGREGATE $5,000,000 DED RETENTION$ Limit x of$5,000,000 $19,000,000 8 WORKERS COMPENSATION WC 13588108 6/1/2022 6/1/2023 X PER OTH- AND EMPLOYERS'LIABILITY STATUTE ER YIN ANYPROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $1,000,000 OFFICER/MEMBER EXCLUDED? NIA (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000 8 Automobile CA 2960145 6/1/2022 6/1/2023 All Other Units $250/500 Comp/Collusion Ded. Truck-Tractors and Semi-Trailers $250/500 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Evidence of Insurance CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Evidence of Insurance AUTHORIZED REPRESENTATIVE ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD The Commonwealth of Massachusetts �—v , /, Department of Industrial Accidents _ IMEMM;�►= 1 Congress Street,Suite 100 14_ Boston, MA 02114-2017 www.mass.gov/dia Workers'Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Leeibly Name (Business/Organization/Individual): Trinity Solar Inc Address: 2211 Allenwood Road City/State/Zip: Wall, New Jersey 07719 Phone#:(732)780-3779 Are you an employer?Check the appropriate box: Type of project(required): 1.IZ'I am a employer with 300 employees(full and/or part-time).* 7. ❑New construction 2.0 I am a sole proprietor or partnership and have no employees working for me in 8. ❑ Remodeling any capacity.[No workers'comp.insurance required.] 9. ❑ Demolition 3.0 I am a homeowner doing all work myself.[No workers'comp.insurance required.]t 10 ❑ Building addition 4.❑I am a homeowner and will be hiring contractors to conduct all work on my property. I will ensure that all contractors either have workers'compensation insurance or are sole 11.0 Electrical repairs or additions proprietors with no employees. 12.❑Plumbing repairs or additions 50 I am a general contractor and I have hired the sub-contractors listed on the attached sheet. 1 i.❑ROOF repairs These sub-contractors have employees and have workers'comp.insurance.: 6.0 We are a corporation and its officers have exercised their right of exemption per MGL c. 14.❑Other 152,§I(4),and we have no employees.[No workers'comp.insurance required.] 'Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. :Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: American Guarantee and Liability Ins Co Policy#or Self-ins.Lic.#: WC 13588108 Expiration Date:06/01/2023 Job Site Address: 31 Taft Rd City/State/Zip: Yarmouth, MA Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct Signature: Date: 5/8/2023 Phone#: (508) 291-0007 Official use only. Do not write in this area, to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1. Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other_ Contact Person: Phone#: MA,Master Electric Contractor#21233A all I • ® MA,Home Improvement Contractor#170355 Rhode Island Contractors'Registration and Licensing Board Registration No.39372 SOLAR Rhode Island Renewable Energy Prof REPC-126 For other jurisdictions,please visit:http://www.trinity-solar.com/about-us/locations-and-licenses 5/15/23 Town of Yarmouth 1146 Route 28 S. Yarmouth, MA 02664 To whom it may concern, Please find the enclosed BLDG & ELECT application(s) and/or check(s) in the amount of $150.00 & $150.00 for 31 Taft Road Yarmouth, MA. If you have any questions, please feel free to reach out to us at (508)-291-0007 or email us at permits.wareham@trinity-solar.com. Sincerely, 4/14, � e The Permitting Department permits.wareham@trinity-sofar.com (508)•291.0007 Wareham,MA and Rhode Island Offices 1-877-SUN-SAVES 20 Patterson Brook Road, Unit 1 Ph:508-291-0007 Wareham, Massachusetts 02576 Fax:508-291-0040 www.Trinity-Solar.com 611: iiity SOLAR Yarmouth, MA April 17, 2023 Town of Yarmouth1146 Route 28 S. Yarmouth, MA 02664 RE: NEHMER,THOMAS I Trinity Solar No. 31 Taft Rd 2023-03-850313 Yarmouth,MA 02673 To the Building Official: The following information constitutes a summary of the relevant design criteria and recommendations for the support of a new photovoltaic [PV]system on the existing roof framing components at the above-referenced location. Criteria is as follows: 1. Existing roof framing: Conventional roof framing at R1 is 2x6 at 16 o.c.; existing rafter span= 12'0"; (horizontal projection) 2. Roof Loading: • 3.0psf dead load(pounds per square foot-PV panels, mounting rails&hardware) • 5.7psf-existing roof loads(1.7 psf-2x6 framing, 1.5psf roof sheathing, 2.5 psf shingles) • Ground Snow Load-30psf-per AHJ (Authority Having Jurisdiction) • Wind criteria-Exposure Category B, 140 mph wind 3. Existing Roof modification-none required; existing roof framing is acceptable for PV installation. This installation design is in general conformance with the manufacturers'specifications and complies with all applicable laws,codes, and ordinances—specifically the International Building Code(2015 edition)and the International Residential Code(2015 edition), including all Massachusetts regulations and amendments. The spacing and fastening of the mounting brackets is a maximum of 48"o.c. between mounting brackets(staggered)and is secured using 5/16"diameter corrosive-resistant steel lag bolts.A minimum of 2'h"of penetration(embedment)per lag bolt is required,which will resist all stated loads above—including wind shear. Per NDS Section 12.1.4, clearance holes-equal to the diameter of the shank-need to be bored into a primary framing member for the full-length of the threaded portion of the bolt to avoid splitting of the framing member. Regards, Thor Bojcun, PE Structural Engineer-Trinity Solar i 4. ., iri ly. ......:.,:r ukl ri+ r 1A I. MA License No.56687 Trinity Solar 120 Patterson Brook Rd,Unit 10 I West Wareham,MA I(508)291-0007 INSTALLATION OF NEW TAFT RD• ROOF MOUNTED PV SOLAR SYSTEM 31 TAFT RD YARMOUTH, MA 02673 Issued/Revisions r'v* rc: ❑VICINITY MAP SITE NO. DESCRIPTION OATS SCALE:NTS Project Title: NEHMER,THOMAS(HOUSE 2)- TRINITY ACCT R:2023-03-850313 Project Address: 31 TAFT RD YARMOUTH,MA 02673 (' 41.665562,-70.216972 GENERAL NOTES GENERAL NOTES CONTINUED GENERAL NOTES CONTINUED ABBREVIATIONS CONTINUED SHEET INDEX JB JUNCTION BOX PV-1 COVER SHEET W/SITE INFO&NOTES Drawing Title: 1.THE INSTALLATION INS CONTRACTOR IS E B. THE DC ALWAYS PRESENT FROM TTHE D PANELS IS 14. B)CURCOMPANY SPECIFICATIONS, PREVAILING STY kCMll THOUSAND CIRCULAR MILS RESPONSIBLE FOR INSTALLING ALL EQUIPMENT ALWAYSSRE M THE THE DCWALLS FT AND REQUIRECIFICATIONS,STANDARDS, WA KILO-VOLT AMPERE AND FO LLOWINGIDIRECTIONS THE AND INVERTER DURING DA DC YLIGHT HOURS ALL AND OF PLANS HAS kW KILOWATT PV-2 ROOF PLAN W/MODULE LOCATIONS PROPOSED PV SOLAR SYSTEM PACKAGE THED ED FROM PERSONS UORKING OFLORI VOLE ALL ES THIS SET PURPOSE PLANS OF MUNIVE CIPAL PREPARED TRINITY.AND INFORMATION RECEIVEDFROM THEPHSWORKINGONORI ARE WARNED AGENCY REVIEW AND APPROVAL. AND MVO KILO-WATT HOUR PV-3 TRINITY. TNEPHOTOVOITAICSYSTEM AREWARNED AGENCY REVIEWANOAPPROVAL.ONCE L LINE ELECTRICAL 3 LINE DIAGRAM 2.THE INSTALLATION CONTRACTOR IS THAT THE SOLAR MODULES ARE ENERGIZED APPROVED,THE INSTALLATION MCB MAIN CIRCUIT BREAKER RESPONSIBLE FOR INSTALLING ALL EQUIPMENT WHENEVER THEY ARE EXPOSED TO LIGHT. CONTRACTOR IS RESPONSIBLE FOR MOP MAIN DISTRIBUTION APPENDIX Drawing Information ION PANEL AND FOLLOWING ALL DIRECTIONS AND 9. ALL PORTIONS OF THIS SOLAR INSTALLING ALL SYSTEM COMPONENTS AS M DLO MAIN LUG ONLY AWING DATE: 14/29/2023 INSTRUCTION CONTAINED IN THECOMPLETE PHOTOVOLTAIC SYSTEM SHALL BE MARKED DESCRIBED IN THE DRAWING PACKAGE. MTD MOUNTED DRAWN BY. IFL MANUAL CLEARLY IN ACCORDANCE WITH THE 36 ALL INFORMATION SHOWN MUST BE MTG MOUNTING REVISED BY 3 THE INSTALLATION CONTRACTOR IS NATIONAL ELECTRICAL CODE ARTICLE 690& CERTIFIED PRIOR TO USE FOR N NEUTRAL RESPONSIBLE FOR READING AND 705. CONSTRUCTION ACTIVITIES. NEC NATIONAL ELECTRICAL CODE __ UNDERSTANDING ALL DRAWINGS COMPONENT 10. PRIOR TO THE INSTALLATION OF THIS NK NOT IN CONTRACT System Information: AND INVERTER MANUALS PRIOR TO PHOTOVOLTAIC SYSTEM,THE INSTALLATION NOR NUMBER INSTALLATION.THE INSTALLATION CONTRACTOR SHALL ATTEND A NTS NOT TO SCALE DC SYSTEM SIZE. '3.24kW CONTRACTOR IS ALSO REQUIRED TO HAVE ALL PRE-INSTALLTION MEETING FOR THE REVIEW ABBREVIATIONS OCP OVER CURRENT PROTECTION AC SYSTEM SIZE. 3kw COMPONENT SWITCHES IN THE OFF POSITION OF THE INSTALLATION PROCEDURES, P POLE MODULE COUNT: R AND FUSES REMOVED PRIOR TO THE SCHEDULES,SAFETY MID COORDINATION. AMP AMPERE PB PULL BOX INSTALLATION OF ALL FUSE BEARING SYSTEM 11. PRIOR TO THE SYSTEM START UP THE AC ALTERNATING CURRENT PH 0 PHASE MODULES USED HANWHA 40S COMPONENTS, INSTALLATION CONTRACTOR SHALL ASSIST IN AL ALUMINUM PVC POLY-VINYL CHLORIDE CONDUIT MODULE SPEC A. QPEAK DUO BLE MLG10$405 4.ONCE THE PHOTOVOLTAIC MODULES ARE PERFORMING ALL INITIAL HARDWARE AF AMP.FRAME pm POWER UTILITY COMPANY:'.E IRSOURCE MOUNTED,THE INSTALLATION CONTRACTOR CHECKS AND DC WIRING CONDUCTIVITY AFF ABOVE FINISHED FLOOR QTT QUANTITY ETAS RIGID GALVANIZED STEEL UTIUTYACCTR: 142R696I1019 ENOURUCA WHO S MINIMUMT ATTENDED CHECKS.R THE AW WIREABOVE FINISHEDGRADE SN SOLID NEUTRAL UTILITY METER 4. 2310293 ELECTRICIAN IC IN TALATION COURSE SE ONLAR l2. FORPROPEROF EMAINTENANCEVRTRS RFER TO THE AWG CONDUIT(ICAN NERIC TERM Awn SWITCHBOARD DEAL TYPE SUNNOVA PHOTOVOLTAIC SAVOY,ITSECOMMENED THAT THEITE. ISOLATION PRTCEIURE INTE OPERATION C CONDUIT PROVIDE AS SAOF EYE S.INSTALLATION SAFETY, IS RECOMMENDEDALWAYS HA THAT THEMANUAL PROCEDURES IN THE OPERATION RACEWAY,PROVIDE AS SPECIFIED) TOP TYPICALNL CREW ALWAYS NAVEA MANUAL. COMBINER BOX U.G.I. UNLESS OTHERWISE INDICATED MINIMUM OF TWO PERSONS WORKING 13. THE LOCATION OF PROPOSED ELECTRIC AND CB CIRCUIT WP WEATHERPROOF TOGETHER AND THAT EACH OF THE TELEPHONE UTILITIES ARE SUBJECT TO FINAL CKT CURRENT TRANSFORMER KFMR TRANSFORMER Rev.No. Sheet INSTALLATION CREW MEMBERS BE TRAINED IN APPROVAL OF THE APPROPRIATE UTIUTY CT COPPER +T2 MOUNTINCHES TOROTTOM OF FIRST AID AND CPR. COMPANIES AND OWNERS. CU DIRER CURRENT ABOVE FIN FLORA DEGRADE 6.THIS SOLAR PHOTOVOLTAIC SYSTEM IS TO BE 14. ALL MATERIALS,WORKMANSHIP AND DC DISCONNECT SWITCH P1 PV INSTALLED FOLLOWING THE CONVENTIONS OF CONSTRUCTION FOR THE SITE DISC DRAWING THE NATIONAL ELECTRICAL CODE.ANY LOCAL IMPROVEMENTS SHOWN HEREIN SHALL BE DWG ELECTRICAL SYSTEM INSTALLER CODE WHICH MAY SUPERSEDE THE NEC SHALL IN ACCORDANCE WITH: EC ELECTRICAL METALLIC TUBING GOVERN. AICURRENT PREVAILING MUNICIPAL EMT FUSIBLE SWITCH 7.ALL SYSTEM COMPONENTS TO BE INSTALLED AND/OR COUNTY SPECIFICATIONS, FS FUSE WITH THIS SYSTEM ARE TO BE"UL"LISTED.ALL STANDARDS AND REQUIREMENTS EU GROUND EQUIPMENTTE WILL 3R OUTDOOR AND FREQUENCY FAULT(CYCLES INTERRUPTER T r i n i t f® RATED UNLESS INDOORS. GEI GROUND ROAN FA(LT PER SECOND) NZ GENERAL NOTES SOLAR IF ISSUI D DRAWING IS MARKED WITH A REVISION CHARACTER OTHER THAN"A".PLEASE BE ADVISED THAT FINAL EQUIPMENT AND/OR SYSTEM CHARACTERISTICS ARE SUBJECT TO CHANGE DUE TO AVAILABLITY OF EQUIPMENT. 2211 Allenwood Road • R NOTES:•REFER TO MODULE SPECS FOR MODULE DIMENSIONS •DEPICTED MODULES MAYBE PORTRAIT OR LANDSCAPE ECOFASTEN CLAMP I NEW PV SOLAR MODULE,-MIME ... IRtm 10 RRC 1wU r0RPLIMITI IRfffR iO EQUIPMENT SCHEDULE FOR SPECSANOQUANTITIES) 1 SOLAR MODULE SOLAR MODULE . NEW MOUNTINGfOUT/A-ACxMFNT \ •, MIN ANA I� POINTS,-PILL(REFER TO ECOFASTEN"l"FOOT EEATIO31CCOFASTEN MIL US ENGINEERING LETTER FOR SPAGNG ANO L[ U[HRrO TM WET[w OFrRIIN . IRUSR iO Hw NWT Mk MiAUN f�� NETALsI 35 NEW EC-0fYSrEN MIEnrIUE _ TO BE MOUNTED PERPINIMUMR TO EXISTING ASPHALT SHINGLES ECOFASTEN FLASHING I� STRUCTURE(REFER TO ECOFASTEN IRD[RrouOw[eM LUTE.wRSP[cEl R lipiJ L•• IMFEx TO MC SHEET FOIL O[rAR51 �, SPECIFICATION/DAM SHEET FOR DETAILS) NEW ENO CUP,TYPCAL S.S.LAG ROE, APOC SEALANT ►2 S\ g� �;� (REFER TO F[OfASTEN SPECIFICATION NRLR TN ROMERS I[r H�rsHW • RM[n SOLAR MODULES HEIGHALLHT. NOT DATA SHEET FOR DETAILS) EXISTING RAFTER EXCEED PEAK HEIGHT. NEW MIDCLIP,TYPICAL 0[x01MMSUrtD Fo (REFER TO FCDFASTFN SPECIFICATION/ ATTACHMENT&CLIP DETAIL ONTO SHEET TOR OETAll51 ❑MPH MODDULLE ATTACHMENT ON ASPHALT SHINGLE ROOF HEIGHT FROM GROUND LEVEL TO PEAK OF ROOF ILA SCALE NOT TO SCALE SCALE SCALE'.NOT TO SCALE ARRAY SCHEDULE ...NOTE:2021 ERG R324.6.2 Issued/Revisions PLAN VIEW TOTAL ROOF AREA:1535.9 FT PHOTOVOLTAIC ARMY TOTAL AREA:149.4 FT. ARRAY PERCENTAGE OF PLAN VIEW TOTAL ROOF AREA:9.714 (PROPERTY UNE) I n AAED io rowwxrrwrerwi VN+u,s I NO. DESCRIPTION DATE I I Project Title: NEHMER,THOMAS(HOUSE 2)- TRINITY ACCT IT:2023-03-850313 I FRONT I Project Address: FRONT 1 31 TAFT RD 4 M"I YARMOUTH,MA 02673 u0 III I 41.665562,70.216972 I 17 of ® ® I Drawing Title: 1'6'CIEAN PATH •,,,, I, PROPOSED PV SOLAR SYSTEM 1'-6•CLMR PATH 1'.6•CLEAR PATH I 1't•CLEAR PATH 3.K I Drawing Information DM DA TE a/z9/:o23 B RCD I DRAWN BY- U R II REVISED BY: ---. I System Information: I DC SYSTEM SIZE 3.2416V I AC LEC COUNT 11 MODULE CUSED- �''r MODULES USED- HANWHAA05 MODULE SPEC R. QPEM DUO ME MLGIO•ADS \ UTILITY COMPANY:EVERSOURCE / UTIUT ACCT R: 142 669 6 0 019 UTILITY METER R. 2310293 NOTES: —— —— —— —— DEAL TYPE: SUNNOVA 11 ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS INSTALLATION INSTRUCTIONS. 21 ARRAY BONDING TO COMPLY WITH MANUFACTURER SPECIFICATION. 3.)ALL LOCATIONS ARE APPROXIMATE ANO REQUIRE FIELD VERIFICATION. Sheet 4.1AN AC DISCONNECT SHALL BE GROUPED WITH INVERTERIS(NEC 690.131E). 5.)ALL OUTDOOR EQUIPMENT SHALL BE MIN TIGHT WITH MINIMUM NEMA 3R RATING. `' ^� 61ROOFTOP SOLAR INSTALLATION ONLY PV ARMY SHALL NOT EXTEND BEYOND THE EXISTING ROOF EDGE. P_ 1 V SYMBOL LEGEND PLUMBING SCHEDULE EQUIPMENT SCHEDULE 1 1 ROOF 1 1 WY SPEC x PITCH:3300 I INDICATES ROOF DESIGNATION.REFER TOI I INDICATES NEW UNFUSED PV DISCONNECT TO BE INDICATES NEW PV ONLY SUBPANEL — - ORIENTATION:242 ®',ARRAY SCHEDULE FOR MORE INFORMATION UD INSTALLED OUTSIDE(UTIUTT ACCESSIBLE I SP TO BE INSTALLED 0 HANWM 405((SPEAK DUO UK MLGIO.405) R00F2 - — - MODULES:O INDICATES NEW PV SOLAR MODULE RID MODULES 1 SE3000H-USOOOBEI4 PITCH: ORIENTAT30' ION:63• INDICATES EXISTING METER LOCATION INDICATE PANELSTHAT LE FO SPECS. INVERTERS.REFER pC INDICATES NEW OC DISCONNECT r i n i ter �' TO EQUIPMENT SCHEDULE FORSPEGS. pOUP3 { � -_-. - OTHER OBSTRUCTIONS MODULE5:0 ///---��� ONIENTFPON:fit' EP INDICATES EXINSIDE ELECTRICAL PANEL LOCATION. C--L INDICATES NOU SIDODUCTION METER TO BE INSTALLED SD INDICATES EXISTING SERVICE DISCONNECT SOLAR ROOG4 U __ • . MODULF5:0 INDICATES NEW INVERTER rO BE II11 Axenw000 Rua0 87I786-]283 OPIENTR ION:242• O INDICATES NEW FUSED PV DISCONNECT TO BE ® INSTALLED OUTSIDE. El INDICATES EXISTING TRANSFER SWITCH — 2211AlRRELAseE07719 www.UITAE-Solar-7781 D INSTALLED OUTSIDE(UTIUTYACCESSIBLE) A REFER TO EQUIPMENT SCHEDULE FOR SPECS Engineer/License Holder: ARRAY CIRCUIT WIRING NOTES 1.1 LICENSED ELECTRICIAN ASSUMES ALL RESPONSIBILITY FOR DETERMINING ONSITE CONDITIONS AND EXECUTING INSTALLATION IN ACCORDANCE WITH SOLAR MODULES MOUNTED TO ROOF ON 1 ARMY NEC 2020 8-405W MODULES W/1 SOLAR EDGE S440 PER MODULE 15 ADC MAX PER STRING 2.)LOWEST EXPECTED AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB 1 STRING OF 8 MODULES IN SERIES-380 VInaX JUNCTION -- TEMPERATURE FOR ASHME LOCATION MOST SIMILAR TOCO -- -------- IUNCTION -- -- -" INSTALLATION LOCATION.LOWEST EXPECTED AMBIENT BOX TEMP•-16'C •TERMINATED INSIDE INVERTER 1 3.)HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHME HIGHEST MONTH 2%ORY BULB TEMPERATURE FOR ASHME LOCATION MOST SIMILAR TO INSTALLATION LOCATION.HIGHEST CONTINUOUS TEMP. 33'C 4.)2005 ASHME FUNDAMENTALS 2%DESIGN TEMPERATURES DO NOT EXCEED 47'C IN THE UNITED STATES(PALM SPRINGS.CA IS 44.1'C).FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN A ROOF-MOUNTED Issued/Revisions SUNLIT CONDUIT AT LEAST a5"ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF Alt OR LESS - (ALL OF UNITED STATES) S.)PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS SHALL INCLUDE A RAPID SHUTDOWN FUNCTION THAT n 'N'^°iO10w""^`,,,^."' 4,'A'01 CONTROLS SPECIFIC CONDUCTORS IN ACCORDANCE WITH NO. DESCRIPTION DATE NEC 690.12(A)THROUGH IDI 6.1 PHOTOVOLTAIC POWER SYSTEMS SHALL BE PERMITTED Project TIER: TO OPERATE WITH UNGROUNDED PHOTOVOLTAIC SOURCE AND OUTPUT CIRCUIT AS PER NEC 690.41 IA)I4) NEHMER,THOMAS(HOUSE 2)- 7.)UNGROUNDED DC CIRCUIT CONDUCTORS SHALL BE 2 IDENTIFIED WITH THE FOLLOWING OUTER FINISH: H TRINITY ACCT N:2023-03850313 POSITIVE CONDUCTORS•RED 3. 120/i40V NEGATIVE CONDUCTORS•BLACK UTILITY METER Project Address: NEC 230.5([)I2) cti METER MAIN COMBO 8.)ARRAY AND SUB ARRAY CONDUCTORS SHALL BE410PV �• NOTE: Y.f� Z40V 10 200V 10 INTERNAL REVENUE GRADE MONITORING 31 TAFT RD WIRE PROTECTEDE BYCON CONDUIT WHERE T POD SHALTO BE IOM06 BUSBN EAKER DOORWOAIN BAR CONTAINED WITHIN SOLAR EDGE INVERTER YARMOUTH,MA 02673 SUNLGHT.0 ARIMYIC DT EXPOSEDNGERH DIRECT24. 100A BUSRAR 100A BUS SOLAR EDGE PN.RWND-3D-240-MR CONTAHT.20BURRE CONDUITRTIN LCONDRCHARLANSHALL ® 41.665562,-70.216972 WHERE CONTAIN POS0 EUBRENTCARSINGIGHT SHALL AND I -- ' WHEREN 59 EXPOSED TO DIRECT ARSUNLIGHT CONTAIN 99 CURRENT CARRYING CONDUCTORS. 9.)ALL WIRE LENGTHS SHALL BE LESS THAN WOUNLESS a))zpla I Drawing Title: OTHERWISE NOTED I )2p100A / N PROPOSED PV SOLAR SYSTEM 10.)FLEXIBLE CONDUIT SHALL NOT BE INSTALLED ON I 60A DISCONNECT - ROOFTOP AND SHALL BE LIMITED TO 32"IF USED DISCONNECT INVERTERBI D OUTDOORS 340V 10 �,. n Drawing Information 11.IOV CONNECTED PROTECTION FOR CONDUCTORS -� I"-` J _ a. �• DRAWING DATE: 4/29/2023 CONNECTED TO THE SUPPLY SIDE OF A SERVICE SHALL BE 2p20A DRAWN BY 'FL LOCATED WITHIN 10'OF THE POINT OF CONNECTION NEC �� _ I 690.9(AX3)121 _ ) P./. II REVISED.: 12.) TAN TWO SOURCES FEED INVERTER, ✓y e -. B E�3- L1 N �y �'J UTILITY AND THE OTHER AN INVERTER,PV BA[KFFED L _ ___ E/ f�..v.e.a 4,-- 5y ILL N Ta System Information: BREAKER(S)SHALL BE LOCATED OPPOSITE FROM UTILITY - - ' -- -- ' 1 ' 1 NEC 705.1218N3R2) I. - 4.' _.?;e - L J I DC SYSTEM SUE ':3.24kW EXISTING SQUARED I �� J AC SYSTEM SIZE 31W 13.)All SOLAR SYSTEM LOAD CENTERS TO CONTAIN ONLY MAIN BREAKER/METER PAN COMBO EXISTING MAIN BREAKER LOAD DU222RB -..._.J MODULE COUNT. 18 GENERATION CIRCUITS AND NO UNUSED POSITIONS OR CENTER 2p200.BACK FEED BREAKER LOADS NEC 701.12(B) MODULES USED HANwNIT 405 MODULE SPEC A. D.PRAXDUDBLKMLG1D.TD5 14.I ALL EQUIPMENT INSTALLED OUTDOORS SHALL HAVE UTIUTY COMPANY.:EVF MOuRCF A NEMA 3R RATING UTILITY ACCT R: 14266960019 UTILITY METER A: 2310293 CALCULATIONS FOR CURRENT CARRYING CONDUCTORS REQUIRED CONDUCTOR AMPACITY PER STRING DEAL TYPE: SUNNOVA [NEC 69U.81BR1)I ITS.00'1.25)1•18.75A PV MODULE SPECIFICATIONS AWG NIO,ITERATED AMPACITY MNWHA 405 IQ PEAK DUO ILK ML-G10.R051 Rev.No. AMBIENT TEMP:DEC,TEMP DERATING FACTOR:.% RACEWAY DEBATING 2CCC:1.00 Imp 10.8.1 ()Mt,ONLUR-I FP1 SHALL BE CHOSEN BY THLINSTXLU TIUN• (40..96)1.00=38.40A Vmp 37.39 Ho ON I I NEC ANU LOCAL AHIO REDII:REMI NIL 38ADA'18.75A,THEREFORE WIRE SIZE IS VALID Vx 45.34 A N6 TI#VN2 GEC TO EXISTING GROUND ROO P1 PV - 3 � TOTAL AC REQUIRED CONDUCTOR AMPACITY III 11.12 B 3/4"CONDUIT W/2-N10 THWN-2,1410 THWN-2,IRIO THWN-2 GROUND 12.50A•1.25=15.63A C 3/4"CONDUIT W/2#Ip THWN i,1430 THWN-2 GROUND AWG RIO.DENTED AMPACITY INVERTER Nl-SE3000H-U5000BEM AMBIENT TEMP:30'C,TEMP DERATING:1.0 D 3/4"CONDUIT W/2410 THWN;1410 THWN-1GROUND RACEWAYDERATING`_3CCC:N/ADC AC Tr 1 n t)'® RACEWAY M=4 Imp 8.5 Pout 3000 F 3/4"CONDUIT W/2#10 THWN-2,1410 TH -2,1430 THWN-1 GROUND i 10A'15.53A,THEREFORE AC WIRE 512E IS VALID WAR 380 Imatt 125 r A]Dw WIRE(FREE AIM W/A6BMECOWER BOND TO ARMY Hoc +ARC OCPD0rID 15.63 SOLAR CALCINATION FOR PVOVERCURBENT PROTECTION 1S Vm 340 G 3/4"CONDUIT W/2#6 THWN;IATHWN-2,148THWN-2 GROUND TOTAL INVERTER CURRENT:12.50A IN 821 286 7283 12'S0A•1.ZS=IS.6M w - wall New le 20A OVERCURRENT PROTECTION IS VALID ,35 E7719 OW.TTIYIIYSolar.corn r 1a L, , �. 44 F 7 0 �R N i 3 IS`Ia '" O 1 Y 2 Mo, w € W E V,-,A.13,-.1a ( VI a� ti f 4 g `e a. a r i c, ` . o o v'i W x x 1 • € d 6 soon of Rf>SS o / as • _ I▪ p i Y a CZS• U Q O OJ Q _ _ w s Hi w nQ r v ow w• M LU J • - Io a-x w w F- , v 0 0 0 _I a Z U z w < F- LU ri N M w I IAa a a CL Q W i / /� a V / 61 SW a g f e8 3: (I) ,I 0 4S°>33 "'zi4iNgi S �•z3c ii oWoFz Ziliz Dees aao.9. or < n O o O cn CD Q E5, ==o =v� u Z > u4 mi�oy S3oF 2N . _- M g eras o_W Q SsCi I a: 23WN::°°oo N iIn�3us$ , �� 'ik 006 o 0 Q I 3 zd"o's~`OJAoG sl i,�c8�<'"F�avizss; �z . _ Wo- _ W«LL w:o3m5W Ci03 W,.�,... ' �iatxG ° .....; io o=�oayoGG» J aGr o 3 zo z _ _ 2 lil! i 3=& _< LiOli W� GE. - moo: - H Q �iW44s:E yta o- oo 9 s= y a wa< ssa ;8m!!.;g5FWo rni ogoss Hi oa5= 2,51 o. �4g=l3s 3 F;°- Fg`- .1.i 8== 4 'per W ou i Go�3 iW 3$ 3.za x��>�zW i�` - `53z ion `u1< . . 3<'e i�:svvaxv_eggin<it, <�l__ Ei 0 i 3o s G S Wg i G `<z: W r4 oo O _2<1 2 aio g 12 ,^ .1 F,t/.? g F'i<= „o °uo ` 211'., 2. 440003 2800i43€m . 5.3,2 °'= . Sa'a i OG5- O�81i '1. oI4zirs W'i ��` W` N 3 z <zo i? fi z-y:1,. g”.0io,1;..3 G m.I 2 o=o i 425 °o2=z"4=risWi<•z zzo gi= o.3N 5400i 3� ; 3 ��o`GW �000 `8'3 '`ssa3 m = 3 .. z . oCi`�3 < :33g„ScWi9:o3f:S'<g< 3` ia'o 9 z r'wgo ioNo oWoa`z '_Nwo W NOTES:'REFER TO MODULE SPECS FOR MODULE DIMENSIONS 'DEPICTED MODULES MAY BE PORTRAIT OR LANDSCAPE ECOFASTEN CLAMP NEW IN SDIM CA el MODULE,TYPL MUSH ID SISC Se rq DETw,N NE IMFERTOfQUIPMENTSCHEDULE FOR SPECS AND QUANTITIFSI I SOLAR MODULE SOLAR MODULE M NEWMOUNTINGFOOT/ATTACHMENT liiiPECOfASTEN"L"FOOT ECOFASTEN RAIL ENDENETOuwTO ......./' SiREP SPFCIFIU1gN/DATA SHEET PoRDFTMlS) I �- it �J, END CLIP,TYPICAL S.S.TAG BOLT APOC SEALANT �� S2t .� �; (RFiERTO ECOFASTEN SPEOFXATIOx/ +RFR+rO ExSx[RIB[ET%+NNFYLW • +rTa SOLAR MODULES SHALL NOT , DATA SHEET FOR DETAILS EXISTING RARER EXCEED PEAK HEIGHT. 11 NEW MID CLIP,TYPICAL o[xcw[[MUn[R FD (REFER TO FCOFASTEN SPECIFICATION/ ATTACHMENT&CLIP DETAIL DATA SHEET FOR DETAILS) pH MODULE ATTACHMENT ON ASPHALT SHINGLE ROOF HEIGHT FROM GROUND LEVEL TO PEAK OF ROOF ❑SCALE.NOT TO SCALE ❑SCALE:NOT TO SCALE ❑SCALY NOT TO SCALE ARRAY SCHEDULE —"en .. E'pat LOLL IRC R3246 i Issued/Revisions PLAN VIE W TOtAI RODE AREA'.15330 FP PHOTOVOLTAIC ARMY TOTAL AREA:119.1 FT' ARRAY PERCENTAGE OF PLAN VIEW TOTAL ROOF AREA:9.7% (PROPERTY UNEI I r uwRiO IDIwNrrwwrr VNrraur NO. DESCRIPTION DATE I Project TRIe: I NEHMER,THOMAS(HOUSE 2)- ) TRINITY ACCT.:2023-03-850313 FRONT I I Project Address: FRONT M Erl 'm➢ 31 TAFT RD E YARMOUTH,MA 02673 LID I 41.665562,70.216972 II DC a 1M I nc ® I I Drawing TRle: CED 116•CLEAR PATH •,,,, II PV SOLAR SYSTEM 1'-6'CLEAR PATH 1'-6-CLEAR PATH I 1'6"CLEAR PATH 5011 I Drawing Information • I WING DATE 4/29/2023 G • • QED IIWN BY REEVISED BY. F • I System Information: It DC SYSTEM SQf: 3.246W MODY: :NTTI TEM S .BACK ILECO MODLES US : WM005MOD1-E: AI DUO BLr ML010*403 UTILITY COMPANY. EVERSOURCE UTILITY ACCT e'. 1a286960019 NOTES: — UTILITY METER e. •2310293 1.)ALL EQUIPMENT SHALL SE INSTALLED IN ACCORDANCE —— DEAL TYPE: SUNNOVA WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 2.)ARRAY BONDING TO COMPLY WITH MANUFACTURER SPECIFICATION. ' 3.)ALL LOCATIONS ME APPROXIMATE AND REQUIRE FIELD VERIFICATION. Rev.NO. Sheet 1.)AN AC DISCONNECT SHALL BE GROUPED WITH INVERTERIS INEC 690.13(E). S.)ALL OUTDOOR EQUIPMENT SHALL BE MIN TIGHT WITH MINIMUM NEMA 3R RATING, 6.IROOFTOP SOLAR INSTALLATION ONLY PV ARRAY SHALL NOT EXTEND BEYOND THE EXISTING ROOF EDGE. P1 PV Rows SYMBOL LEGEND PLUMBING SCHEDULE EQUIPMENT SCHEDULE \ MODULES:B OTT SPEC. PITCH:30 'INDICATES ROOF DESIGNATION.REFER TO INDICATES NEW UNFUSED PV DISCONNECT TO BE INDICATES NEW PV ONLY SUBPANEL ORIENTATION:IQ ®II ARRAY SCHEDULE FOR MORE INFORMATION UD INSTALLED OUTSIDE(UTILITY ACCESSIBLE) `. TO BE INSTALLED B HANWHA 405(Q.PEAK DUO BLK MLG1OY 405) ROOF 2 t MODULES:0 I INDICATES NEW PV SOLAR MODULE.RE U MODULES 1 SE3000H-U5000BEi4 ,Ininty PITCH:3O • ORIENTATION:62' I A.S I j INDICATES EXISTING METER LOCATION a INOIUTE PANELS THAT USE MICRO INVERTERS.REFER OC INDICATES NEW DC DISCONNECT Q RDOF3 LJ TO EQU!MOO'SCHEDULE FOR SPECS. MOOGLES:0 -- - -- - OTHER OBSTRUCTIONS PITCH:3O INDICATES EXISTING ELECTRICAL PANEL LOCATION P INDICATES NEW PRODUCTION METER TO RE INSTALLED Op1ENTATION:62' © INSIDE OUTSIDE SD I INDICATES EXISTING SERVICE DISCONNECT ROOF SOLAR MODULES:D _- -- . PITCH:iI N DICAT ES NEW FUSED PV DISCONNECT TO BE INDICATES NEW INVERTER TO BE 2211 Alienwo0tl Road B77/86/Ikr ORIENTATION:312' II INSTALLED OUTSIDE(UTILITY ACCESSIBLE) I® REFER INSTALLED OUTSIIENTSCHEDULE FOR SPECS El INDICATES EXISTING TRANSFER SWITCH Wall,New lase,D2719 www.TN ur nily'SOlar own • f. Engineer/License Holder: ARRAY CIRCUIT WIRING NOTES 1.)LICENSED ELECTRICIAN ASSUMES ALL RESPONSIBILITY FOR DETERMINING ONSITE CONDITIONS AND - - EXECUTING INSTALLATION IN ACCORDANCE WITH SOLAR MODULES MOUNTED TO ROOF ON 1 ARRAY NEC 2020 8-405W MODULES W/1 SOLAR EDGE S440 PER MODULE IS ADC MAX PER STRING 2.)LOWEST EXPECTED AMBIENT TEMPERATURE BASED ON ASMRAE MINIMUM MEAN EXTREME DRY BULB - _ - _ M M g ]STRING OFB MODULES IN SERIES• Vma% - ---- ----- - ------ TEMPERATURE - --- Ip BOX - - INSTALLATIONBOX LOCATION.LOWEST EXPECTED AMBIENT TEMP•-16'C •TE RMI MATED INSIDE INVERTER I 3.1 HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHME HIGHEST MONTH 2%DRY BULB TEMPERATURE FOR ASHME LOCATION MOST SIMILAR TO INSTALLATION LOCATION.HIGHEST CONTINUOUS TEMP= 22'C 4.12005 ASHME FUNDAMENTALS 2%DESIGN TEMPERATURES 00 NOT EXCEED 47'C IN THE UNITED STATES(PALM SPRINGS.CA IS 44.1"C).FOR LESS THAN 9 _ _ , CURRENT-CARRYING CONDUCTORS IN A ROOF-MOUNTED Issued/Revisions SUNLIT CONDUIT AT LEAST D.5"ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF a7'C OR LESS (ALL OF UNITED STATES) 5.)PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS SHALL INCLUDE A RAPID SHUTDOWN FUNCTION THAT CONTROLS SPECIFIC CONDUCTORS IN ACCORDANCE WITH rI %Rwolawxw,IwAwn un7mH NEC 690.12IA)THROUGH ID) ND. DESCRIPTION DATE 6.1 PHOTOVOLTAIC POWER SYSTEMS SHALL BE PERMITTED - - TO OPERATE WITH UNGROUNDED PHOTOVOLTAIC Project Title. SOURCE AND OUTPUT CIRCUIT AS PER NEC 690.41 OM NEHMER,THOMAS(HOUSE 2)- 7.)UNGROUNDED DC CIRCUIT CONDUCTORS SHALL BE TRINITY A[CT N:3023-03-850313 IDENTIFIED WITH THE FOLLOWING OUTER FINISH: 5 POSITIVE CONDUCTORS=RED NEGAPVE CONDUCTORS=BLACK ' 120/2I - NEC210.5(C)(2) a 2T W UTILITY METER Project Address: B METER MAIN COMBO MIDPVB.I ARMY SUB ARMY CONDUCTORS SHALL BE 110NOTE. WIRE TYPE RNW.2 OR EGUIVELANT AND SHALL BE �^ 210V 1B 210V 1� INNAL REVENUE GRADE MONITORING 31 TAFT RD lOM 0AM RIN SBBUR lUO1 MAIN MARKER PROTECTED. ARRAY DT L%NOSED TO NIRECT CONTAINEDRWITHIN SOLAR EDGE INVERTER SUNUGHT.SUB CONDUIT LONGER THAN 2/'SHALL 10M BUSBAR 100A BUSMR VARMOUTH,MA169 02673 CONTAIN 520 CURRENT CARTING CONDUCTORS MID la - SOLAR EDGE PN.RWND 30TAO MB 41.665562,-70.216972 WHERE EXPOSED TO DIRECT SUNUGHT SHALL JIL/\7aL/\.. CONTAIN 5 9 CURRENT CARRYING CONDUCTORS. 9.)ALL WIRE LENGTHS SHALL BE LESS THAN 100 UNLESS ))2p100A Drawing Title: OTHERWISE NOTED ))24100A C. PROPOSED PV SOLAR SYSTEM 10.)FLEXIBLE CONDUIT SHALL NOT BE INSTALLED ON 60A UNFUSED ROOFTOP AND SHALL BE LIMITED TO l2"IF USED ,.-....�� DISCONNECT - D OUTDOORS INVERTER NI 210V 1!a motion 11.)OVERCURRE NT PROTECTION FOR CONDUCTORS ^_--^ �'a•w"I I (�/. R o f1/29/2023 CONNECTED TO THE SUPPLY SIDE OF A SERVICE SHALL BE '-' ^ �'=� DRAWING DATE: W - -68 � -- LOCATED 3)12)WITHIN SO'OF THE POINT OF CONNECTION NEC n - -- I=' OM B: H 69091A1(3112) \l' Qj... 1 I REMEO BY: ' 131 WHERE TWO SOURCES FEEDA BU55MR,ONEA I a'7,.II..J L'-.-J 12.)WUTIUT EREAN THE OMER SOURCED TEED A BRSSBAR,ONE - r� E LI L2 H 1 BREAKER(S)SHAH BE LOCATED OPPOSITE FROM UTILITY 1- _f-- --I I'- 000 ,k, item Information: NEC705.12(Bg3R2) _ L.J DC SYSTEM WE3.2<kW EXISTING SQUARED ✓1ti A[SvSTFM SIZE: 13aw 13.)ALL SOLAR SYSTEM LOAD CENTERS TO CONTAIN ONLY MAIN BREAKER/METER MN COMBO EXISTING MAIN BREAKER LOAD pU222RB GENERATION CIRCUITS AND NO UNUSED POSITIONS OR CENTER 2p20A BACK FEED BREAKER ---------------3 MODULE COuxi. B LOADS _ _ NEC 705.12(11) MODULES USED: HANWM405 ;MODULE SPEC 8 D.PM%DUO BLK 14,WD-ta05 11.1 ALL EQUIPMENT INSTALLED OUTDOORS SHALL GAVE A NEMA 311 RATING UTILITY COMPANY:EVERSpUR[E UTILITY ACCT R: 11286960319 CALCULATIONS FOR CURRENT CARRYING CONDUCTORS UTILITY METER R: 2310293 REQUIRk D LONDUCIOR AMPACITY PER STRING DEAL PIPE SUNNOVA (NEC 690.1)11)(1)I:(15.00•1.25)1=18.75A PV MODULE SPECIFICATIONS AWG 410,DENTED AMPACITY NANWNA 405(0PEAK DUO BLK PAL-G10.405) AMBIENT TEMP:33.C,TEMP DENTING FACTOR:.96 Rev.No. Sheet RACEWAY DENTING=2 CCC:1.00 Imp 10.83 r1INI en(IIIv.C 10101 BY THE INsla«NI, II0•.9611.00=38.40A My 37.39 o LI IUR LeIIII DWC AN'b111CAL A1110 XLuu:RI MINI, 36./W'IB.]SA,THEREFORE WIRE 512E IS VALID VOL 15.31 A+ 46 TNWN-I GEC TO EXISTING GROUND ROD �P1 PV I TOTAL AC REQUIRED CONDUCTOR AMPACITY Ito 00.07 B 3/1"CONDUIT W/2NIO TMWN•2,1.I10 TXWN-2,1a10 TNWN-2 GROUND 12.SOA•1.25=15.63A r C 3/1"CONDUIT W/2'R10 THWN'2,1410 TXWN-2 GROUND AWG 410,DEBATED AMPACITY INVERTER Rl-SE3000H'U50008EM • p 3/1"CONDUIT WO2�R20 THWN-2 1-010 THWN-2 GROUND _ • • O DC AC TEMP:30'C,TEMP DENTING:l U RACEWAY DENTING``-3 CCC:N/A - - 40A•1.0=ADA Imp B.S Pout 3000 E 3/1"CONDUIT W/2410 THWN-2,1-000 TNWN-2,1-410 THWN-2 GROUND XUA'15.63A,THEREFORE AC WIRE SIZE IS VALID Amp 380 Max 12.5 Vo5 80 OCP.mm 15.63 F 1010 PV WIRE(FREE MN W/R6 RARE COMfABONO TO ARRAY CALCULAT ION PV DNERN M RRE PROTECTIONIft 15 Windy, 240 G 33/1"CONDUIT WE 2�R6 TNWN-2,lib THWN-2,1-XBTHWN-2 GROUND SOLAR TOTAL INVER1 ER CURRENT:12.5M 12.SUA•1.25=15.63A 2211 Allenwood ROIL 87//867283 ->20A OVERCURRENT PROTECTION IS VALID Wall,New lerseT 07719 www.TTITUY Solar.Lom Single Phase Inverter with HD-Wave Technology for North America Z SE3000H-US/SE3800H-US/SE5000H-US/SE6000H-US/ Single Phase Inverter SE NUMBER /SE10000H-US/SE11400H-US MODEL NUMBER SE3000H-US SE3800HUS SESOOOH-US SE6000H-US SE7600H-US sE10000H-US SE11400H-US with HD-Wave Technology m APPLICABLE NUMBER WITH PART NUMBER SEXXXXH-XXXXXBXX4 OUTPUT for North America W a2 1t1t Max AC h Output 3000 3800.24P/ 5000 6000 0 240V moo 10000 11400•24W ,h SE3000H-US/SE3800H-US/SE5000H-US/SE6000H-US/ 33�®2o0Y �2oe� o�g®2oa SE7600H US/SE10000H US/SE11400H US AGO tputYo Voltage Nan Max + i (211 240 26p • , 4. e ,.,• m AC Output Voltage M Non:Max. (183•208 2291 - 6 V x 12-25 T ACEea Frequency 593-60 w5 YEAR N Mav C t Output O 5 16 21 T 25 32 42 47 5 O WARRANTY. Current@240V_--_ - -_.. __- Max Continuous Output + • Current 0208V 16 24 • 485 - r, • 0 Power Factor 1,Adjustable 085 to 0.85 .___..._.____.. ..__ GFDI Threshold 1 _... Volt-- •, Utility Monitoring,Islanding Protect.,. Yes ,,,Orr y COP Oyu,ab,e Thresholds O • INPUT • • ^a Uc Ibwer812406 4650 5900 i //so i 9300 4 11800 i 15500 17650 i W MaximumDC 0208Y 5100 I .-__7]50 15500 W ... _._...___- .._-_'_- ____-----__- —_._— Transfor rrrrlesS,Ungrounded __- _-- -- the Volt. ._..___+.._.._._ Maximum input Voltage 480 i Nt nulatta-r -.ND —HD— Nom l DC W Voltage IW 400 NY • • • "a4r� .. • Ma Input torrent• W 240 R 5 (0 5 13 5 (6 s t-_-- 20 2 30.5 Adcc • a - T .._'- _____• ___ Maximum Input Current 0208V 9 t • 13. t __ 27 l Adc 0 0 Max. put Shot Circuit Current 45 i Adc O 0 0 la" ve Rer Pd I tM Yes T Ground-Fault Isolation Detection 60044 Sent ty Maximum Inverter Efficiency 99 i 99.2 T 99 - % CEC Weighted ERiciency 99 .... % O 0 0 0 _ ... YIPNighttime Power Consumption e 2 5_ W ADDITIONAL FEATURES supported Communication Interfaces I R5465,Etherrel Zgeee(optional).Cellular(opnonaq Revenue G ark Meter%ANSI C12.20 Optional,. Optimized installation with HD-Wave technology Co nsurnphon metering InverterI - - - - can With m n,ssoneg ineSeAppmraapW t using ean nw Er AccA«essPoint tor Local Connection Autanatlu Rapid Shutdown upon AC Grid Do«mect • / Specifically designed o work withpower optimizers / UL1741 SA certified,for CPUC Rule 21 rid complianc P Y 9 P 9 P STANDARD COMPLIANCE Satety UL1741,UL1741 SA,UE169313,CSA C22 2,Canadian AEC!according to Tl I M-07 . _..._._. / Record-breaking 99%weighted efficient / Small,lightweight,and easy to install both bra C,pmm;1, Standards 0EEE1547.Rule 21.Rule 14(Nu outdoors or indoors FCC Part 15 Class 8 / Quick and easy inverter commissioning directly from INSTALLATION SPECIFICATIONS a smartphone using the SolarEdge SetApp / Built-in module-level monitoring 1-Maximum/14-6AWG ! 6 Maximum/14-4 AWG DC Input Conduit Size/I of Snrngs/ 1"Maximum/1-2 strings/14-6AWG I1"Maximum/1•3 strings/146AWG / Fixed voltage inverter for longer strings / Optional:Faster installations with built-in AWG Range _-_DOWILO,S wah S consumption metering(1%accuracy)and 3 w6 73/s4o 37o ie5 R (HeWx 1 1 1 /401 4 Weightth Safety Swrth 2110 251/,14 262/11-9 3881176 i, •. / Integrated arc fault protection and rapid shutdown production revenue grade metering(0.5%accuracy, No 1 zs t so for NEC 2014,NEC 2017 and NEC 2020 per article ANSI C12.20) Cooing N tural Co nvection 690.11 and 690.12 Ope g Tempera to wre Range _...4 -4010.140/40 t .60' Protection Rating NEMA 4%(Inverts M Salety Switch) ._.... ll)i other e4..settings peaty Sooa ldue Plxr solar3 ' "' My� w (3) R W AS.,M E Y0008NC4 R xm a.0 q Mein Sk SWIIBN as..meteors cwrentran Mnwrs Yo.Le solaredge.com orderedoAotAetseparate,et SEAL o m7a0NA.r sCde p sn ink 11 .a e w NA Pia,.,,,,a x„,o c/I2z e n.Pnwa de;au, ,t. don rim te,7ddawrn,�, n,j,.,a.Clown c So.,.Pr wridms m.,..as«4ut0e. .lattaa l0 ovnalna..sauaora.,.,ixut.r.«,mn.�edr a..,a Sew..r.a.wwv.e n.Au m.tr.a«..,.;,.„.,,«,�,,,.,.,...4.,.w.aa..mR«n..,,«w,o•w„/mrrv�,a«c aMa sM,«t w...w.,,r,«,r..,,. / Power Optimizer -v For North America Power Optimizer O P320/P340/P370/ P400/P401/P405/P485/P505 P340 P370 For North America / Optimizer model P320 (forhigh- (for higher- P400 forhgh P405 P485 P505 ``J (typical module (for 60-cell power Power (for 72 8 Power 60 (for high- (for high- (for higher P320 P340 P370 P400 P401 P405 P485 P505 compatibility) modules) 60-cell 60 and 72- 96-cell and 72 cell• voltage voltage current / / / / / / / modules) cell modules) ' modules) modules) modules) modules) modules) m INPUT Rated Inp,..A. ,_1, „" v; a,u 4, se ,as w 70 AbsolteM ug t- __ -T t _., ..._. Va low. nl ' 4R T 60 I ao 1 fi0 125 1 83'^ We MPP3 OPeratingR ny a 48 1 8•60 * tl 80 j 860 125•105 1 12,5-83 Vlc O M nun Shoo( (u"ei t n 101 1 1115 11 la Ado 125 1465 2S +�--145 Ad 25 71 995 m ,,,r _ 9ee 9a6 w, W yARRA TY JvevoltageCategory } _ OUTPUT DURING OPERATION(POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER) filli filif imin i na aNIII OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM SOLAREOGE INVERTEROR SOLAREDGE INVERTER OFF) STANDARD COMPLIANCE N FCC Pa t15 Class a IEC61000-6 2 IEC61000 6.3 IEC62xA 11 lass II safety),ULI/41 11194 V-0,W Resaarn INSTALLATION SPECIFICATIONS ,v-u„nl y -.... . -. 1000 vac Compatlde inverters All SolarEdge Single Phase and Three Phase inverters 129x153.33.5(129x153.29.51 i129x162x59/ L Nl.l 1794 K3 JI /Stx6e1 129.19 495/51 x63 9 mm r� 6.'16 6.4x23 ', _ —}. Wegn(inciuding cabksl 630/14 —1- /50/17 L...655/15 1 845/19 1 1064/23 1I,,u. Input( uctor MC4° 1 S'MCI C d MCA' Input Wire length 016/052 016 or09 016/0 52 .n/,1 __... 1/0 520,295, Output Wire Type/Connector Double Insulated/MC4 Output Wire Length " n °9 /294 1- ""v /RPV power optimization at the module-level 0{eratmg Temperature Rmge' 40RS/40 •165 C/'r —r- Protectom Rating _ _... P68/NEMA6P _.. ... Nelathe Hu0.083 I.. _ _._ 0 100 / Specifically designed to work with SolarEdge / Fast installation with a single bolt .,C 14,17r„Nrestr,"rnla,l 1.a oNeth n000.e<Raa.3..w,uNa„e,Modules 8i A n.S,�P ,1or,a..,,e,I.,w(„ formmwn„e,nW� otesol.9ex ,.ta�,e1n.,,INN inverters +1 r« eNton,t,.au...Net..nn,�1 sn„l,g(. / Next generation maintenance with module- ", ,"e"a,""AN,EnnoNteNallog<r"""�e LoemtheJa5°N"""'"M'" ,n°a"`°'""'"°e,aeY' '"""""K"„"""",°"'°"eP3a5""""'"""""na'"�"'"e"`° one .u.use the Soo..Pr"d,ea., / Up to 25%more energy level monitoring toii.'Ee, `"l wee l M�fi,(%"-,es•E`oo:.0xaooins sos 0�"N a .41we0. ., nnn.N...anose6k.. u ln,cWN Pehtr,mNM+(k+„m xrt bn. / Superior efficiency(99.5%) / Meets NEC requirements for arc fault PV System Design Using ',Ingle Phase Three Phase for Three Phase for Single phase protection(AFC!)and Photovoltaic Rapid a SolarEdge Inverter'- HD-Wave 208V grid 277/480V grid / Mitigates all types of module mismatch losses, Shutdown System(PVRSS) from manufacturing tolerance to partial Po,.OptrrOers)' 4a,va01 tP405 P485 P505 1 6 tl u shading / Module-level voltage shutdown for installer M st __- __ _ g «,y1.length(Power oI>umaer) + _ zs zs - sm and firefighter safety - T / Flexible system design for maximum space Mazinum Power per sung 5e1600-us-5N1400- •• 6000•• msa^ W US) —_ utilization Parallel Stngs dR m —1 D, t Lengths or ONabuns ---- --t— -- ------ --- - ------ __..'ks t/l Fur ao„allow.xlu,ny,054e48tiniMe„ll nuP,ArwwnM„eo4c vy.sa u.,✓.re,/ae,aouRevv, ,nun wR Nl AstorNalne.m ma V.00ter5/°105es A32(UP3Nt CNEORaW/P101,none.ar,n9 NIA annq wan tinR,,.115 c„PVVwue'n rm., celeryce.et erore,tech wng e...,"yen, (tll lv lOBV q",� 5(W pay w pow(r aAlem srxq a 10gRv solar 91, ,nnW�.S /;gm�mP . � n solaredge.com / . > C w.'�a.�an.,�,o q�o pM,,.�.Ar>,.a.�-,,,.a.n...a�(aa.,.,.�.�. RoFIS Irwrtek r • Grounding Connectors Ul .*. TYPE:LI Lay-In Connector • CMC®LI-S ground connectors are manufactured from high strength 6061-76 2Lsco aluminum alloy to Insure both maximum strength and conductivity.They are 11111 KUP-L-TAP®(IPC)Insulation Piercing(Dual Rated) dual rated for both copper and aluminum conductors and are electro tin plated to provide low contact resistance and protection against corrosion.They are designed for use on conduit grounding bushings.The open-faced design allows the installer to quickly lay-in the grounding conductor as a jumper to multiple conduits with no break in the ground conductor. 90.0 RATING(4868 LISTED) got• Catalog Cond.Range Dimensions,Inches Number Fig.No. AW0 Stud Site' H W L LI-505 1 4-14 0.22 I; 0.7 8 0.38 1.07 LI-1125 I 1 1/0-14 I 0_27 i 1.17 1 0.6 I S - LI-2005 1 2 3/0-6 U S 3 1I... 156 _..1 Il 8 2 LI-2525 2 250-6 _ II I I I/9 0.8 2.2 •Kw+.T.wNlin.uwmnpwoq mwmr. I . • Body rnicb.a Iron ruyl.wn.••••112..nylon ''''''0004N353 • Ill maw uPC...land Is CU r vw. wrr • Fame.,Wri.l..lmNKq Gar BwC 1/4.70 UNf !6%.53 OP REF- /"18.220 TNR17 Q TAP WITHIN.olr MAX Of • Cm�pw.lwp. NOT DRILL PAST W IPEW . Of WIREWAT.OAT • rn# d ay"mama ran and.l w.4i.lwna•.wra64n. �II I'�1'.t{�{ III�_ _.� • ken.*bYm .37S3.010D.R• OrMlw C.pparWN.0 AncwYCw ECIPH.1111111"1111 I9.53 k.251 • MAY 63207 .187*.010 14.25 k.2S1 NAEDtni 200k.01S 190*DLO (S.08A Ali (4.01k.25) la-ima 2 40-4 MG .14 AWG B00 12 12 l ` 1/4-28%.625 W.STAINLESS STEEL SLOTW SCREW 1.070 k 015 C00201022(I 06001 (27.18k.38) A55EMKE SCREW sNW TO(POTION f1ANIY102-- ---AWtkINCiL 7116k.010 C11C 111 Age*006 a (19.963.251 I 5115 CUVAI 13.811*.1S1 M.W NIN4 1 HARM,•1I:;t L '/,,,,, ,,=....„:„. ((437� I \ 790_4 05k.00s '...•• C005_ (0.64k 13) FINISH TIN PIAIT CMS--07 w,AM( ...w..P. m ato a 11/17/2009 LAY IN LUG U-50-5 • -- rma.CIOIOIO11 fbi° 1 w I 6061-TO ALUMINUM 2.25X awzm.ow ., �:s.-- wr .n CROSS REFERENCE 1 OO Qi A t. ,/,',/,,YA r/f/f:„3/..A, S 0 N IlVil "/,,,,.., a J%c• '''): CU A 4sc am C 'o E O n t v m g e - LL _ _ W Y AOC 4 0 CY = A g 1: z , v $C 1 N 773 a E 00 a 1 Z ! !Jj vHi c_ a _t a J Y 0 d K s a B IL 0 cc v. O W z dl mq LLo LL v H WI . v _. YW x. S O Y c tton W Y —°I1 -g i uw uI— Q V O C C m�'i M 5 3 'r C W-. N W G M J > = Y N °� E L cG Jim J y Sl� + p _ 2N Y C '` u� N p Y C T -T _1 _ d K o a. f t Q OIO ia� M W a n ` > > U Q 1Kp1 x C ` o a o 2 d a a,, C , I m i 1 1 a /§ _ cr) G A A R ry s N�,..O O J �a N eg x O 'YO u 4 . G J Z 2�iW f L T 3 c° si § j O2 f W aYi v` 1 u - ://#711> SiIJ3N38 + S3Un1d3J ' aN Olik W N _ d A L.T. 5 c o v H N L vi J. B Lim O E ° m � d III d u = Ws o E o ° N C 'LT; a+ 2 �� c o ` "] 22 In C o o c m o o d ° 5 E m o :o 3 7id � Z.o E o C C � L E c o 9 «! T d ad_ u N E N o E v w ° d ,d, c _ t, - _ c m u t d d C 0 - d U ] • y 2 d d d L O CO C d)L p c u' - C I- 3 O u N y , n 114 Lu Y , C o N L c m Y O g a m v `. v o 0 0 3 0 n n w vO VI a o d W "Cl '� o^ c E °�' _ c n z u N ` ] C C 0T E Y a V tla - u uQ - a w c F- J u Powered by MECHANICAL SPECIFICATION Q.ANTUM /DUO/© �u,met (17mm.105mm.32mm) Name) (18T3mm.1045mm.32rmn) - - - __ °re... w�.-.� Weight 48.616s(22.04) . 1 , From Cover 0.131n(3.2mm)thermally pre-stressed glass with aft-reflection technloBY °:yrre.�sswaa-a Beck Cover Composite tam Frame Black anodized aluminum Cell 6.22 morystathne O.ANTUM solar hall cells O ocr •i••rn Junction Boo 209-398..1.26-2.361n.0.59-0./lin (53-101mm.32-60mm.16-18mm),IP67,with bypass diodes "-f--]_,w„naemmb Cable-- 4mma Soler cable;(.)x492in(1250nen),(-)x 492in(1250nan) ..w.+� �unne..:r, StAubk MCA,IP68 _ •0rdw�Psw.r QePEAK DUO BLK ML-G10+ ELECTRICAL CHARACTERISTICS �OMIEROLAIN 385 390 395 400 400 385-405 MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS.STC'(POWER OLERANCE-5W,o4N 305 Power et MPP' P. IWI 3a5 390 395 400 405 ShortCircuit cdrrCurrent' Iv IAI _ 1104 __ _1107 ll.lo _ 1>_la ll.t] ENDURING HIGH E i PERFORMANCE �YR �t,Pn 4rt14run p E Open CA1AIt Voltage' V..: IV] 4519 4523 45.27 45,30 46.34 25J Curtail at MPP w AI 10 3 10.65 0]1 10]7 1083 w aAANp n' ' Voltage et MPP V.w, [VI �'Jo 36.82 38.88 3713 37.39 Efficiency' I%1 e196 z19.9 z20.1 x20.4 x20.6 ..... 2021 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS,NMOT, Warranty GCELLS Power at MPP Pw. IWI 288.8 2926 296.3 300.1 303.8 -.._._ _.. E Short Circuit Current le, IAI 8.90 0.92 8.95 B.B] 9.00 E Open Circuit Voltage V,r IVI 42.62 42.65 4269 42.72 42.76 BREAKING THE 2O%EFFICIENCY BARRIER f cum.m at MPP Iwv IAI 835 awl ea6 e.51 857 aQ,ANT UM DUO Z Technology with zero gap cell layout Voltage at MPP Vv„ VI 3459 481 3503 3525 3546 boosts module efficiency up to 20.9% .M.suroment tolerances Pea t 3%.I,,,14,,z5%eI STC 1000 W,._25 1 AM 1.5 according to IEC 6090 800 W,m+,NMOT,slwctrum AM 15 O CELL'PERFOMFMN:E WARRANTY 0[00MdANCEATLOW N9ADIANCF THE MOST THOROUGH TESTING PROGRAMME IN THE INDUSTRY _. Q CELLS is the first solar module manufacturer to pass the most i a% war r '"' slve quality programme in the industry:The new'Quaity Controlled PV'of 9 Ines 93 s% tIII he independent certification Institute TUV Rheinland. �" e6%o P power o p A • • • 2s tests rl a INNOVATIVE ALL-WEATHER TECHNOLOGY ° Aa dma wun,n measurement toleranc- es ^� Optimal yields,whatever the weather with excellent r lwl warrnminsmu.:urnn,Kn With r�- ---- ---'-------- ¢� Ina wwranty tw,n,or.heGCELLs "° w.awwx. t3 low-light end temperature behavior. _ r Saias w Ygen,seion ul ynur.nsPeoew I"' F ENDURING HIGH PERFORMANCE •,'.. �' == • r• - r TYPice Pe" anrwer ow 00W/rnc«Mitkxam 0 <ompar src on,izfi°c.llwowrm•) Long-term yield security with Anti LID TechrwWgy,Anti PID TEMPERATURE COEFFICIENTS Technology',Hot-Spot Protect and Traceable Quality Tra.Q8". %/El .0.04 Temperature Coat iornnt of v,„, p I%/El -0.27 a � 1 net tf- tut P,.w, y i%/K1 0.34 N met MotlueOPeret Operating Temperature NMOi 1°F) 109a6414303°Cl m HNTREME WEATHER RATING 3 High-tech aluminum alloy frame,certified for PROPERTIES FOR SYSTEM DESIGN z high snow(5400Pa)and wind loads(4000Pa). - ------ --- g Maximum SYatem Voltage V„, IVI 1000(EC)/1000(UL) PY .... ,. Coss 11 aaaa3��i� (((eeer�����y ARELIABLE INVESTMENT Maxlmam Series Fuse tr/PoI IA DC] 20 Fire Rainy owned en ANSI,UL 81730 TYPE2 p Inclusive 25-year product Warrant and 25-Be! Rating M Design Lund Pueh/Pali' 11bs/It'I 75(3600P 1/56(2660Pai Permitted Module Temperature -40°F up to.185°F e Y pr Y Y --- --'-_.-- Continuous Duty (-40'C uPb.85'C) linear performance warranty, 'S Taal .ManuePushl Pull• Imsnlrl 113(5400P)64(4000 Pa) Sae lwbt on Mwwa APT lost mmeetIon.a..edr tumor aCrmanon 4-rzols.rr.an.o40I150ov.9sn1 QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION 4 seed.Ie,neel«,coact«Inrinw.ntermaidn p� �,q }� y eenv 1 V� 'ZIJ ® l°10-�o �w IC SIM THE IDEAL SOLUTION FOR: ee o«an,«,9.11113.2.16 cawa«.,. C E Q Horizontal 76.4in 433in 48.Om 16561bs 24 24 32 6 l<uulluP ar,eye.,r ""w f'tl'w"'°41oNr-u. C,..,,.,,,US packe9rn9 1940mm 1100mm 1220mm 751 k0 pallets pellets modules b{ wurw on,mmumn C New:Insbeatmn mstructlnne must he allowed.See the Instwbaon andoperavrg manual o,contact our lechn,cel serwar deparinwnt tar Er..Woma000 on epc,own,nsblle,an end usd 0, Engineered in Germany GICELLS Names 0 CEWA1wbeleo. 400 Somtrun.center fame,Suite 1400.1,cow.CA 92618,USA,TEL.1948 708 5986 I'MAIL nou,ryMus B calla nom I WE'mew.o.cohaus §TOWN OF YARMOUTH 1146 Route 28, South Yarmouth, MA 02664 508-398-2231 ext. 1261 Fax 508-398-0836 Office of the Building Commissioner BUILDING DEPARTMENT DEMOLITION DEBRIS DISPOSAL AFFIDAVIT Pursuant to M.G.L. Ch. 40, §54 and 780 CMR- Section 105.3.1. #4. I hereby certify that the debris resulting from the proposed work/demolition to be conducted at 31 Taft Rd, Yarmouth, MA Work Address Is to be disposed of oat the following location: 20 Patterson Brook Rd Unit 1 W. Wareham, MA Said disposal site shall be a licensed solid waste facility as defined by M.G.L. Ch. 111, §150A. 5/8/2023 Signature of Application Date Permit No. NJ,Electrical Contractor business permit number34EB01S47400 NJ,HIC reg.#13VH01244300 SOLAR For other jurisdictions,please visit:http://www.trinity-solar.com/about-us/locations-and-licenses HOMEOWNERS AUTHORIZATION FORM Thomas Nehmer (print name) am the owner of the property located at address: 31 Taft Rd Yarmouth,Massachusetts 02673 United States (print address) I hereby authorize Trinity Solar Inc. ("Trinity Solar") and its employees, agents, and subcontractors, including without limitation, , to act as my Agent for the limited purpose of applying for and obtaining local building and other permits from the Authority Having Jurisdiction as required for the installation of a Photovoltaic System, Battery System, roofing or other Trinity Solar offerings located on my property, applying and obtaining permission and approval for interconnection with the electric utility company, and registration with any state and/or local incentive program(s). This authorization includes the transfer/re-administering, and/or cancellation of any existing permits on file for the purpose of updating/applying with an alternate subcontractor. Without limitation to the generality of the foregoing I specifically authorize Trinity Solar et al.to populate technical details,fill-in,edit,compile, attach drawings, plans,data sheets and other documentation to, date,submit, re-submit, revise, amend and modify application,submission and certification documents("Approvals Paperwork"), including those for which signature pages are included herewith for my signature, in furtherance of the related transaction, and I am providing any signatures to Approvals Paperwork for purposes of the foregoing.Trinity Solar will provide copies of Approvals Paperwork when submitted. My authorizations memorialized herein shall remain in full force and effect until revoked. I acknowledge that these authorizations are not required to proceed with the transaction and are not a condition of the related agreement included herewith but are being given for my own convenience and benefit in order to expedite the approvals processes. Electric Utility Company: Eversource(Formerly NSTAR) Electric Utility Account No.: 14286960019 Name on Electric Utility Account: Thomas Nehmer Customer Signature Thomas Nehmer Print Name March 24, 2023 Date Corporate Headquarters 1-877-SUN-SAVES 2211 Allenwood Road Ph: 732-780-3779 Wall, New Jersey 07719 Fax: 732-780-6671 www.trinity-solar.com FOR INFORMATION ABOUT CONTRACTORS AND THE CONTRACTORS' REGISTRATION ACT, CONTACT THE NEW JERSEY DEPARTMENT OF LAW AND PUBLIC SAFETY, DIVISION OF CONSUMERS AFFAIRS AT 1-888-656-6225. DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 Su n n ova Sunnova Home Solar Service Easy Plan TM Power Purchase Agreement (PPA) Balanced Billing HOMEOWNER THOMAS NEHMER DATE ISSUED 3/24/2023 11:02 AM ADDRESS 31 TAFT RD INSTALLATION 31 TAFT RD WEST YARMOUTH, MA 02673 LOCATION WEST YARMOUTH, MA 02673 $0.00 $0.00 $0.199 $68.25 25 Years Down payment Upfront Payment(if Rate per kWh—Year Monthly payment—Year Agreement term applicable) one one (Includes ACH discount) (Includes ACH discount) AGREEMENT BENEFITS & INSTALLATION PROCESS • Trinity Solar and Sunnova will install a 3.240-kW solar • If you sell your house, you may transfer the agreement and system on your home. warranties to the new homeowner, provided that the new • Your system is estimated to produce 4,116 kilowatt homeowner meets Sunnova's credit requirements. (Sec. 11) hours in the first year of service. (Schedule A) • If you choose not to renew the agreement at the end of your • Your agreement includes your down payment of 50.00. 25.00-year term, Sunnova will remove the system at no cost to you. Conditions apply. (Sec. 17) • Your monthly payment will never increase by more than approximately 2.90% per year (Schedule A) • This agreement requires the parties to resolve their disputes by arbitration rather than by lawsuits in court:jury trials and • Trinity Solar will complete the design and engineering class actions are not permitted(Sec. 19) drawings for your system, and Sunnova will review the • Your agreement gives you a 7-day cancellation period final design to ensure it meets our high-quality standards (Sec.5(b)) without incurring any fees. • Your system activation may experience delays as a result • Any savings estimate is dependent on the energy usage of the process for obtaining the necessary building permits information you provided us and may change as your usage and utility approval for net metering and interconnection of and utility rates change over time. your system. Once your system is installed, it must still • Your solar system is covered by the Limited Warranty for pass utility inspection before you can turn it on. the term of the agreement. (Exhibit 2) • You will receive a 10%discount each month when you • Once your system is turned on and operating you will set up automatic payments from your checking or savings receive two monthly electricity bills one from Eversource account(pricing above already reflects discount). (Sec. Energy(Formerly NSTAR Electric Company) and one 4(e)) from Sunnova. • You may renew this agreement for up to two successive • When the electric grid goes down, your solar power system five-year terms at the end of the original 25-year term. will not work. (Sec.10) I have reviewed, understand and agree with the above agreement terms and process. The pricing provided in this Easy Plan TM Power Purchase Agreement(PPA) is valid until April 22,2023 Ho yyier's initials Homeowner's initials I I" 20 East Greenway Plaza Ste 475, Houston,TX 77046 281.985.9900 www.sunnova.com Agreement ID: VI005701027 ©2021 Sunnova Energy International. Inc.All Rights Reserved. DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 S U n n n\/'^C( Sunnova Home Solar Service Easy PIanTM Power Purchase Agreement(PPA) Balanced Billing Homeowner Name and Co-Homeowner Name Installation Location Installer/Contractor Address (If Any) 31 TAFT RD WEST Trinity Solar THOMAS I NEHMER YARMOUTH, MA 02673 2211 Allenwood Road 31 TAFT RD Wall WEST YARMOUTH, MA NJ 02673 7719 License: Contract ID CA: 1072590; CT: 0635520; VI005701027 ELC.0195559-E1 I DE: 2066600876; T1-0005929 FL: CVC57148 I MA: 170355; 21233A I MD: 132333; 11834 0491 C I NH:0491 C ( NJ: 13VH01244300; Electrical Business Permit# 34E601547400 I NY: 52821- H; H.2409780100; L004203 PA: PA128551 I RI: 39372 ; AC005040 Salesperson: Mark McCormack HIS#: Salesperson Address: Trinity Solar Sunnova License: Sunnova MA 184093 Estimated Solar Energy Production Estimated First Year Annual Production: 4,116 kWh Estimated Initial Term Total Production: 96,948 kWh Payment Terms Upfront Payment Amount: $0.00 Amount Due at Contract Signing: $0.00 Installation Fee: $0.00 Annual Increase of Solar Energy Rate: 2.90%/year First Year Solar Energy Rate, if paid by auto-ACH: $0.199/kWh First Year Solar Energy Rate, if not paid by auto-ACH: $0.219/kWh Reduced Annual Solar Energy Rate', if paid by $0.199/kWh auto-ACH: 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:3/29/2023 ©2018 Sunnova Energy Corporation.All Rights Reserved. 1 Contract ID:V1005701027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 S U n n ` ,^ Sunnova Home Solar Service �/ (� Easy PlanT"" Power Purchase Agreement(PPA) Balanced Billing Reduced Annual Solar Energy Rate', if not paid by auto-ACH: $0.219/kWh Estimated Monthly Bill in First Year, if paid by auto- ACH: $68.25/month Estimated Monthly Bill in First Year, if not paid by auto- ACH: $75.08/month 1)Reduced Annual Solar Energy Rate applies if an Upfront Payment is made. SOLAR POWER PURCHASE AGREEMENT 1. INTRODUCTION Interconnection Date is not on the first day of a This Power Purchase Agreement(this"Power calendar month, the number of days left in that partial Purchase Agreement" or"PPA") is the agreement calendar month. We refer to this period of time as the between you and Sunnova Energy Corporation "Term." The Term begins on the Interconnection (together with its successors and assigns, `Sunnova" Date. as defined below. The "Interconnection Date" is or"we"), covering the sale to you of the power the date that the System is turned on and generating produced by the solar panel system (the"System") power. Sunnova will notify you by email when the described below, Sunnova agrees to sell to you, and System is ready to be turned on. you agree to buy from Sunnova, all of the power Approximate Start Date. The installation work to be produced by the System on the terms and conditions performed by Contractor pursuant to this Power described in this Power Purchase Agreement. The Purchase Agreement shall commence within 3 days System will be installed by Sunnova or a contractor from the date that is the later of the date in which (a) acting on Sunnova's behalf at the Installation Location all permits have been issued: (b) any homeowner's listed above. This Power Purchase Agreement will association approval letter has been received; and (c) refer to this address as the "Property" or your 'Home." all materials have been delivered to the site (the Sunnova provides you with a Limited Warranty(the "Commencement Date'). 'Limited Warranty"). The Limited Warranty is attached Approximate Interconnection Date. All work to as EXHIBIT 2. install the System shall be completed as soon as Following the execution of this PPA, a representative possible, but in no event more than twelve (12) of Sunnova will contact you to verify your information months from the Commencement Date; subject to any (the"Validation Call"). applicable amendments. The time between This is a legally binding agreement with Commencement Date and Interconnection Date will disclosures required by law, so please read vary depending on a number of factors: some outside everything carefully. This PPA requires the parties the control of Contractor. These factors include the to resolve their disputes by arbitration rather than process for obtaining utility approval for net metering by lawsuits in court;jury trials and class actions and interconnection of your System. The project shall are not permitted. be deemed completed upon the date the System is connected to the electrical grid and begins generating If you have any questions regarding this Power power(the "Interconnection Date"). Purchase Agreement; please ask your Sunnova sales 3. POWER PURCHASE AGREEMENT PAYMENTS: consultant. AMOUNTS 2. TERM a. Power Price Sunnova agrees to sell you the power generated by the System for 25 years (300 months). plus, if the 20 East Greenway Plaza Ste 475.Houston,TX 77046 281.985.9900. www.sunnova.com Date:3/29/2023 ©2018 Sunnova Energy Corporation.All Rights Reserved. 2 Contract ID: VI005701027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 S n(-Ala Sun nova Home Solar Service _; a Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing You are purchasing the power the System HAVE THE OPTION TO RE-SIGN A CONTRACT produces. The price of that power is set forth on AT THE REGULAR KWH RATE. the''Value Statement" attached as Schedule A. Homeowner(s)'Initials b. Payments r—os I'v Schedule A details, among other things; (i)the ithere.1 dLrnmtiaihere.2 price per kWh ('`kWh Rate") you will be charged per year: (ii)the annual price per kWh percentage d. Yearly Adjustment to Monthly Payment(s) & increase(if any); (iii) Sunnova's estimate of the Estimated Annual Production power that is expected to be produced by the You will have regular access to information on the System during the first year; (iv) Sunnova's System's actual output via your Sunnova online estimate of the amount of power that is expected account. The actual kWh output per year("Actual to be produced by the System over the entire Annual Production") may vary from the Estimated Term (excluding any renewal period(s) extending Annual Production due to weather and other the Term as provided in Section 10); and (v) your conditions. You agree that the exclusive means to Monthly Payment amount for the first year. Your monitor and measure the Actual Annual "Monthly Payment" is calculated based on the Production is via the System's meter; provided, following: (A)the annual price per kWh multiplied however, if the System's meter malfunctions or by(B)the estimated kWh output per year becomes inoperable, Sunnova will reasonably ("Estimated Annual Production") divided by(C) estimate the amount of power that would have twelve (12). During contract validation, you will been delivered to you during the period in which choose one of the available payment date options the System's meter was malfunctioning or for your Payment Date. After your first Monthly inoperable and shall treat this reasonable Payment. 299 additional Monthly Payments will be estimate as part of the Actual Annual Production due on the same day of each following month. for that year for purposes of this paragraph. Your Any payments due upon installation are due Monthly Payment may adjust each year if(i)there immediately prior to commencement of is a price per kWh annual increase during the installation. You will not make a Monthly Payment Term as set forth in Schedule A and/or(ii)Actual if you fully prepay this PPA as provided in Section Annual Production varies from the Estimated 4(k)or if you fully prepay this PPA in connection Annual Production as set forth on Schedule A. with an Upfront Payment in below section 3(c). After the end of each year during the Term, c. Rate Reduction -Upfront Payment Sunnova will notify you of the Actual Annual Production for the previous year and of any You ❑have I have not selected the option to adjustment to the Estimated Annual Production reduce your kWh Rate by making an upfront and Monthly Payments for the current year and payment of S0.00 thereafter. If the Actual Annual Production is less (the "Upfront Payment') due on the earlier of(i) 10 than the Estimated Annual Production for the days prior to the date of installation and (ii) 30 previous year, Sunnova (i) will credit you an days after the execution of this PPA. If you make amount equal to the difference between the the Upfront Payment, we will reduce your kWh Estimated Annual Production and the Actual Rate to a reduced kWh rate (the `Reduced Annual Annual Production ("Overestimate of Production") kWh Rate" or"Reduced Solar Energy Rate") as multiplied by the annual price per kWh for that reflected on Schedule A. Your"Monthly year(including any annual kWh price percentage Payment"will be recalculated as follows: (A) the increase previously agreed upon as provided in Reduced Annual kWh Rate multiplied by(B)the Schedule A) and (ii) may; at its option, decrease Estimated Annual Production, as defined above, the Estimated Annual Production and the Monthly divided by(C)twelve(12). If you fully prepay this Payments for the current year. If your Monthly PPA by making an Upfront Payment then you will Payments are calculated at the Reduced Annual not have a monthly payment. kWh Rate pursuant section 3(c) herein, any credit IF YOU HAVE CHOSEN THE OPTION TO for an Overestimate of Production as set forth in REDUCE YOUR KWH RATE BY MAKING AN this section 3(d) will be at the Reduced Annual UPFRONT PAYMENT AND YOU FAIL TO MAKE kWh Rate. THE UPFRONT PAYMENT BY THE REQUIRED If the Actual Annual Production is more than the DEADLINE THIS CONTRACT WILL Estimated Annual Production for the previous AUTOMATICALLY CANCEL AND YOU WILL year, Sunnova may, at its option, (i) apply the 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date: 3/29/2023 ©2018 Sunnova Energy Corporation.All Rights Reserved. 3 Contract ID:vi005701027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 S'' '' Sunnova Home Solar Service �v Easy PlanTM Power Purchase Agreement(PPA) Balanced Billing difference between the Actual Annual Production "Force Majeure Event" means any event, condition and the Estimated Annual Production to an or circumstance beyond the control of and not Overestimate of Production for the current year or caused by fault or negligence. It shall include, a subsequent year and/or(ii) increase the without limitation, failure or interruption of the Estimated Annual Production and the Monthly production, delivery or acceptance of power due to: Payments for the current year and thereafter. In an act of god; war(declared or undeclared): no event shall Sunnova increase the Estimated sabotage; riot; insurrection; civil unrest or Annual Production by more than 110%of the disturbance; military or guerilla action; terrorism; Estimated Annual Production for the first year. economic sanction or embargo; civil strike, work If you prepaid this PPA in full, you will not have an stoppage; slow down, or lock out; explosion; fire:. annual accounting of the Actual Annual earthquake; pandemic; abnormal weather condition Production against the Estimated Annual or actions of the elements; hurricane: flood; Production. Instead; we will evaluate your Actual lightning; wind; drought; the binding order of any Post Prepayment Production at the end of the governmental authority(provided that such order Term and receive a Prepayment Rebate as those has been resisted in good faith by all reasonable terms are defined in Section 4(k) below. legal means); the failure to act on the part of any governmental authority(provided that such action has been timely requested and diligently pursued); e. Payment Reconciliation unavailability of power from the utility grid; equipment, supplies or products; power or voltage If(i) the System is off line for more than seven (7) surge caused by someone other than Sunnova full twenty-four(24) hour days cumulatively during including a grid supply voltage outside of the the Term (for example, you remove the System to standard range specified by your utility: and failure do renovations to your Home); or(ii) you take of equipment not utilized by Sunnova or under its some action that significantly reduces the output control. of the System; or(iii) you don't trim your bushes 4. POWER PURCHASE AGREEMENT OBLIGATIONS or trees to their appearance when you signed this PPA to avoid foliage growth from shading the a. System, Home and Property Maintenance System; then Sunnova will reasonably estimate the amount of power that would have been You agree to: delivered to you during such outages or reduced (i) have the System repaired pursuant to the production periods and shall treat this reasonable Limited Warranty ONLY and reasonably estimate as part of the Actual Annual Production cooperate when repairs are being made; for that year for purposes of this paragraph. You will not be charged for the System being off line (ii) keep trees; bushes and hedges trimmed so due to Sunnova's fault or grid failure. that the System receives as much sunlight as it did when Sunnova initially installed the f. Payment Suspension Due to Circumstances System; Outside of Your Control (iii) keep the panels and modules clean, In the event of System destruction or grid failure pursuant to the Limited Warranty and the caused by a Force Majeure Event, your payment Guide (as such term is defined in Exhibit 2) obligations under this Power Purchase Agreement and protect the System from animals and will be suspended for as long as the System is infestation; down or the grid failure continues due to the Force (iv) not modify your Home or landscaping in a Majeure Event, and the Term of this Power way that shades the System; Purchase Agreement will be extended for an equivalent period of time; provided however, that (v) be responsible for any conditions at your (i) you provide notice to Sunnova of the Force Home that affect the installation (e.g., Majeure Event and your intention to rely upon the blocking access to the roof, or removing a Force Majeure Event as a basis for suspending tree that is in the way. prior work you have payments. and (ii)the payment obligations may done on your Home that was not permitted); be suspended and the Term extended only for the (vi) be responsible for the structural integrity of amount of time that Sunnova may determine, in its sole discretion, that a Force Majeure Event exists the Home where the System is installed, and provides written confirmation of the same. including structural or electrical modifications necessary to prepare your Home and roof for 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:3/29/2023 ©2018 Sunnova Energy Corporation.All Rights Reserved. 4 Contract ID: VI005701027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 n Sunnova Home Solar Service '� '� S va Easy Plant." Power Purchase Agreement(PPA) Balanced Billing the System. You agree that Sunnova is not listed on any national or state"Do Not Call" responsible for any known or unknown list. Message and data rates may apply. property conditions, including but not limited Homeowner(s)'Initials to, actual or alleged exacerbation of pre- ADS existing conditions; 11) Homeowner(s)'Initials ,--Ds 11) b. System Construction, Repair, Insurance and \ Sunnova's obligations (vii) not remove any markings or identification Sunnova agrees to cause our contractors to: tags on the System; (i) schedule the installation of the System at a (viii) permit Sunnova, after we give you mutually convenient date and time; reasonable notice, to inspect the System for (ii) construct the System according to written proper operation as we reasonably plans you review that provide a detailed determine necessary; description of work to be done and (ix) use the System primarily for personal. family equipment to be used; or household purposes, but not to heat a (iii) provide you with a meter to accurately swimming pool, and not to provide power to measure the amount of power the System any property outside of your Home: delivers to you: (x) not do anything, permit or allow to exist any (iv) notify you if the System design has to be condition or circumstance that would cause materially changed so that you can review the System not to operate as intended at the any such changes; Property; (v) clean up after ourselves during the (xi) notify Sunnova immediately if you think the construction of the System: System is damaged or appears unsafe; if the System is stolen; and prior to changing (vi) obtain insurance insuring the System your electric provider; against all damage or loss unless(A) that damage or loss is caused by your (xii) have anyone who has an ownership interest negligence; or(B) you intentionally damage in your Home sign this Power Purchase the System; Agreement; (vii) obtain insurance insuring our actions, (xiii) permit us access to data regarding your covering damage to your Property caused energy consumption from your electric by faulty installation, System malfunction or provider or from electronic usage data manufacturing defects; storage sites (data produced by the System shall be owned by us) and execute a third- (viii) not be a loss payee (or named insured) on party access agreement for this purpose the insurance policy covering your Home; where required; (ix) repair the System pursuant to the Limited (xiv) return signed any documents we send you Warranty and reasonably cooperate with for signature (like incentive claim forms) you when scheduling repairs; within five (5) business days of receiving (x) create a priority stream of operation and them; maintenance payments to provide enough (xv) authorize Sunnova to make inquiries cash flow in our financing transactions to concerning your credit history and standing pay for the Limited Warranty obligations and from time to time: and the repair and maintenance of the System in accordance with this PPA even if Sunnova (xvi) authorize Sunnova to (i) call you and (ii) ceases to operate; send pre-recorded and text messages to your provided phone number regarding the (xi) not put a lien on your Home or Property; and installation, maintenance, and administration (xii) install. operate and maintain the System in of your System using automated telephone accordance with applicable net metering and technology even if your phone number is interconnection laws. 20 East Greenway Plaza Ste 475.Houston,TX 77046 281.985.9900. www.sunnova.com Date: 3/29/2023 ©2018 Sunnova Energy Corporation.All Rights Reserved. 5 Contract ID:VI005701027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 s ' n�` ,^ Sunnova Home Solar Service LJ \/Q Easy PlanTM Power Purchase Agreement(PPA) Balanced Billing c. System Installation Timeline the System. You also agree to pay as invoiced Your System requires review and approval by any applicable personal property and/or ad your utility. Review and approval of your valorem taxes on the System that your local jurisdiction may levy. The total estimated amount application may take 5-6 months to complete. Sunnova and its installation partner will work with you will pay for taxes over the Term is $0.00 you to complete this process as quickly as assuming that tax rate, structure, exemptions(and possible. the interpretations of the same) stay the same as they are on the date of this PPA. In the event the By initialing below, you acknowledge that it may tax rate, structure or exemptions (and/or the take several months to complete the review of interpretations of the same) change during the your application and complete the installation of Term that amount will change. your system. g. No Alterations Homeowner(s)'Initials r—ns You agree that you will not make or allow any other party to make any modifications, improvements, revisions or additions to the System or take any other action such as d. Home Renovations or Repairs modifying your Home or landscaping in a way that affects the System and that could void the Limited If you want to make any repairs or improvements Warranty on the System without Sunnova's prior to the Property that could interfere with the written consent. If you make or allow any other System (such as repairing the roof where the party to make any modifications, improvements, System is located), you may only remove and revisions or additions to the System. they will replace the System at your cost with advance become part of the System and shall be notice to us and in compliance with the Limited Sunnova's property. Warranty. h. Access to the System e. Automatic Payment, Fees; Late Charges (i) You grant to Sunnova and its employees, In addition to the other amounts you agree to paye in this Power Purchase Agreement, you agree to reasonably agents any acccess all of the rightProperty as to pay the following: necessary for the purposes of(A) installing, (i) Automatic Payment Discount: All prices constructing, operating, owning, repairing, include a ten percent(10%) monthly removing and replacing the System or discount for using automatic payment. You making any additions to the System or will not receive a ten percent (10%) monthly installing complementary technologies on or discount if you do not make automatic about the location of the System: (B) Monthly Payments through your checking or enforcing Sunnova's rights as to this Power savings account; Purchase Agreement and the System; (C) installing, using and maintaining electric (ii) Late Payments: accrue interest at the lines and inverters and meters; necessary to lesser of twelve percent(12%) annually interconnect the System to your electric or the maximum allowable rate by system at the Property and/or to the utility's applicable law beginning on the twentieth electric distribution system; or(D) taking any (20th) day after the date the payment was other action reasonably necessary in due and continuing until paid in full; and connection with the construction, installation, (iii) Returned Check Fee: S25.00 (or such lower operation, maintenance. removal or repair of amount as required by law) for any check or the System. This access right shall continue withdrawal right that is returned or refused for up to ninety(90) days after this Power by your bank. Purchase Agreement expires to provide Sunnova with time to remove the System at f. Estimated Taxes the end of the Power Purchase Agreement. You agree to pay any applicable sales, use or Sunnova shall provide you with reasonable similar taxes on the Monthly Payments(or notice of its need to access the Property prepayment, as applicable) due under this PPA. If whenever commercially reasonable. this PPA contains a purchase option, you agree to pay any applicable tax on the purchase price for 20 East Greenway Plaza Ste 475,Houston:TX 77046 281.985.9900. www.sunnova.com Date:3/29/2023 2018 Sunnova Energy Corporation.All Rights Reserved. 6 Contract ID: V1005701027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601 C9BA1 E3 n Sunnova Home Solar Service ,.,. _. Va Easy PlanTM Power Purchase Agreement(PPA) Balanced Billing (ii) During the time that Sunnova has access You may prepay all payments remaining on this rights you shall ensure that its access rights PPA at any time provided you notify Sunnova of are preserved and shall not interfere with or your desire to prepay. The amount you prepay permit any third party to interfere with such will be based on the following: (i) all accrued but rights or access. You agree that the System unpaid Monthly Payments. taxes, late charges, is not a fixture, but Sunnova has the right to penalties, interest and all or any other sums then file any UCC-1 financing statement or fixture accrued or due and owing, plus (ii)the amount set filing that confirms its interest in the System. forth on Schedule A in the column titled "Prepay i. Indemnity Option," which amount may be adjusted at the time of prepayment to reflect Sunnova's estimate To the fullest extent permitted by law. you shall of the kWh output per year from the time of indemnify, defend, protect. save and hold prepayment to the end of the Term ("Estimated harmless Sunnova, its employees, officers, Post-Prepayment Production") and discounted to directors, agents, successors and assigns from present value at 5% per annum (Sunnova shall any and all third party claims, actions, costs, furnish you with a detailed calculation of such expenses (including attorneys'fees and compensation if such a claim is made). In the expenses), damages, liabilities, penalties, losses, event you made an Upfront Payment and are obligations, injuries. demands and liens of any making monthly payments at the Reduced kWh kind or nature arising out of, connected with, Rate per above Section 3(c), your Prepay Option relating to or resulting from your negligence or amount will be reduced to reflect the Upfront willful misconduct by you or any of your agents, Payment. employees, household members, family members, tenants, invitees; provided, that nothing herein shall require you to indemnify Sunnova for After you notify Sunnova of your desire to prepay. its own negligence or willful misconduct. The Sunnova will provide a notice to you ("Prepayment provisions of this paragraph shall survive Notice") informing you of the Estimated Post- termination or expiration of this Power Purchase Prepayment Production and the amount you need Agreement. to pay to prepay the PPA(the"Prepayment j. Payments Amount)". The Prepayment Amount is due within fifteen (15) days from the date of the Prepayment Schedule A describes your payment obligations Notice. After you timely pay the Prepayment under this PPA. SUBJECT TO SECTION 3(b) Amount in full, you will not make any further ABOVE. YOU AGREE THAT THE OBLIGATION Monthly Payments. TO PAY ALL PAYMENTS AND ALL OTHER If you prepay in full under(i)this section 4(k) or li AMOUNTS DUE UNDER THIS PPA SHALL BE p p y ( ) ( ) ABSOLUTE AND UNCONDITIONAL UNDER ALL in connection with an Upfront Payment per section CIRCUMSTANCES AND SHALL NOT BE 3(c), then at the end of the Term. Sunnova will SUBJECT TO ANY ABATEMENT; DEFENSE, notify you of the actual kWh output per year from COUNTERCLAIM, SETOFF, RECOUPMENT OR the date of your prepayment to the end of the REDUCTION FOR ANY REASON Term ("Actual Post-Prepayment Production"). If, WHATSOEVER, IT BEING THE EXPRESS at the end of the Term, the Estimated Post INTENT OF THE PARTIES THAT ALL Prepayment Production is greater than the Actual AMOUNTS PAYABLE BY YOU HEREUNDER Post Prepayment Production, Sunnova will pay SHALL BE, AND CONTINUE TO BE, PAYABLE you, the homeowner who prepaid this PPA, within IN ALL EVENTS INCLUDING BY YOUR HEIRS sixty(60) days after the end of the Term an AND ESTATE AND, EXCEPT AS SET FORTH amount equal to the difference, if any. between BELOW IN SECTION 5 AND IN THE NOTICE OF the Actual Post-Prepayment Production and the RIGHT TO CANCEL, YOU HEREBY WAIVE ALL Estimated Prepayment Production multiplied by RIGHTS YOU MAY HAVE TO REJECT OR the price per kWh at the end of the Term (a CANCEL THIS PPA. TO REVOKE "Prepayment Rebate"). Sunnova will send the ACCEPTANCE OF THE SYSTEM. OR TO Prepayment Rebate to the last address we have GRANT A SECURITY INTEREST IN THE for you in our file and it is your responsibility to SYSTEM. notify Sunnova if you move. If the Estimated Post-Prepayment Production is less than the k. Option to Prepay all Payments Remaining on Actual Post-Prepayment Production. you will owe the PPA nothing to Sunnova. 20 East Greenway Plaza Ste 475 Houston.TX 77046 281.985.9900. www.sunnova.com Date:3/29/2023 ©2018 Sunnova Energy Corporation.All Rights Reserved. 7 Contract ID:VI005701027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 S u n n 1 )` ,^" TM Sunnova Home Solar Service �/ Q Easy Plan Power Purchase Agreement(PPA) Balanced Billing I. Utility Service in a timely manner for any reason. Once Sunnova You agree to continue to subscribe to the utility starts installation, however, it may not terminate this Power Purchase Agreement for your failure to service that you had at the time of entering into this PPA and you agree to execute all satisfy the conditions (i) through (vii) above. documentation associated with that utility service. b. Amendments, Your Right to Terminate for m. Supplemental Energy Material Changes Before Installation All electric energy made available by the System Both parties will have the right to terminate this is for use at your Home pursuant to this PPA. If, PPA, without penalty or fee, if Sunnova at any time, you need more electricity than is determines after the engineering site audit of your Home that it has misestimated the System's being produced by the System ("Supplemental annual production by more than ten percent Energy"), you will be responsible for purchasing that (10%). Such termination right will expire at the Supplemental Energy from another supplier, such as your utility. earlier of(i) one(1) week prior to the scheduled System installation date and (ii) one (1) month 5. CONDITIONS PRIOR TO INSTALLATION OF THE after we inform you in writing of the revised SYSTEM; CHANGE ORDERS production estimate. If neither party exercises their right to terminate this PPA following a ten a. Sunnova's obligation to install the System and percent(10%) change in the System's production, sell you the power it produces is conditioned then any changes to the System will be on the following items having been completed documented in an amendment to this PPA. You to its reasonable satisfaction: authorize Sunnova to make corrections to the (i) completion of(A)the engineering site audit utility paperwork to conform to this PPA or any (a thorough physical inspection of the amendments to this PPA we both sign. Property, including, if applicable, 6. WARRANTY geotechnical work), (B) the final System design, and (C) real estate due diligence to YOU UNDERSTAND THAT THE SYSTEM IS confirm the suitability of the Property for the WARRANTED SOLELY UNDER THE LIMITED construction. installation and operation of WARRANTY ATTACHED AS EXHIBIT 2, AND THAT the System: THERE ARE NO OTHER REPRESENTATIONS OR WARRANTIES; EXPRESS OR IMPLIED. AS TO THE (ii) approval of this Power Purchase Agreement MERCHANTABILITY, FITNESS FOR ANY by Sunnova's financing sources; PURPOSE, CONDITION, DESIGN, CAPACITY, (iii) your meeting Sunnova's credit underwriting SUITABILITY OR PERFORMANCE OF THE criteria then in effect; SYSTEM OR ITS INSTALLATION. THE WARRANTY (iv) confirmation of rebate, tax credit and SET FORTH HEREIN REPRESENTS THE SOLE renewable energy credit payment availability AND EXCLUSIVE REMEDY YOU HAVE AGAINST SUNNOVA RELATING TO THE SYSTEM OR THE in the amount used to calculate the Monthly POWER PURCHASED THEREUNDER. Payments set forth in this Power Purchase Agreement; 7. TRANSFER (v) confirmation that Sunnova will obtain all Sunnova works with banks, companies and other applicable benefits referred to in Section 8; financing parties to finance the System. As a result, (vi) Sunnova may assign this PPA to one of its financing receipt of all necessary zoning, land use and parties. In addition; Sunnova may assign this PPA to building permits; and its affiliates or a third party that purchases the PPA. (vii) completion of any renovations, You agree that Sunnova may pledge, assign, sell or improvements or changes reasonably transfer the System and this Power Purchase required at your Home or on the Property Agreement, or any part of this Power Purchase (e.g., removal of a tree or necessary roof Agreement or the exhibits, without your consent. repairs to enable us to safely install the Assignment. sale or transfer generally means that System). Sunnova would transfer all or a portion of its rights and certain of its obligations under this Power Sunnova may terminate this Power Purchase Purchase Agreement to another party. Agreement without liability if, in its judgment, any of the above listed conditions will not be satisfied 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:3/29/2023 ©2018 Sunnova Energy Corporation.All Rights Reserved. 8 Contract ID:VI005701027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601 C9BA1 E3 S ' 'J n n r) Sunnova Home Solar Service � �J Q Easy PlanTM Power Purchase Agreement(PPA) Balanced Billing 8. OWNERSHIP OF THE SYSTEM: TAX CREDITS, AGREE TO EXECUTE ANY NECESSARY REBATES AND CAPACITY RIGHTS DOCUMENTS AND TO PROVIDE INFORMATION You agree that the System is and shall remain REGARDING YOUR UTILITY ACCOUNT TO FACILITATE ENROLLMENT IN SUCH ENERGY Sunnova's exclusive personal property under the MANAGEMENT PROGRAMS. YOU AGREE THAT Uniform Commercial Code or otherwise. You SUNNOVA IS EXCLUSIVELY ENTITLED TO understand and agree that this PPA is not a contract to sell or lease the System to you. Sunnova owns the RECEIVE ANY AND ALL BENEFITS RESULTING FROM THE ENROLLMENT OR PARTICIPATION IN System for all purposes, including any data generated from the System. You shall at all times keep the SUCH ENERGY MANAGEMENT PROGRAMS. System free and clear of all liens, claims, levies and legal processes not created by Sunnova, and shall at Homeowner(s)'Initials your expense protect and defend Sunnova against the r—os same. NO FEDERAL OR STATE TAX INCENTIVES ARE INCLUDED IN CALCULATING THE MONTHLY 9. PURCHASING THE SYSTEM PRIOR TO THE END PAYMENT. YOU UNDERSTAND AND AGREE WITH OF THE TERM THE EXCEPTION OF STATE SPECIFIC REBATES AND/OR TAX CREDITS AVAILABLE ONLY TO THE In addition to purchasing the System at the end of the HOMEOWNER, THAT ANY AND ALL (i)TAX Term (see Schedule A), you have the option to CREDITS, (ii)TAX INCENTIVES, (iii) RENEWABLE purchase the System prior to the end of the Term. To ENERGY CREDITS, GREEN TAGS, OR CARBON exercise this option, you must be in good standing OFFSET CREDITS. (iv) UTILITY REBATES (v) under this Power Purchase Agreement and you need CAPACITY RIGHTS, OR (vi)ANY OTHER NON- to give us at least one(1) month's, but not more than POWER ATTRIBUTES OF THE SYSTEM ARE THE three (3) months' prior written notice. You can PROPERTY OF AND FOR THE BENEFIT OF purchase this System: SUNNOVA, USABLE AT ITS SOLE DISCRETION. a. on the five(5) year anniversary of the SUNNOVA SHALL HAVE THE EXCLUSIVE RIGHT beginning of the Term and every annual TO ENJOY AND USE ALL SUCH BENEFITS, anniversary after the five (5) year WHETHER SUCH BENEFITS EXIST NOW OR IN anniversary: and THE FUTURE. YOU AGREE TO REFRAIN FROM ENTERING INTO ANY AGREEMENT WITH YOUR b. at any time after the five (5) year UTILITY THAT WOULD ENTITLE YOUR UTILITY TO anniversary of the beginning of the Term, CLAIM ANY SUCH BENEFITS RETAINED BY when you sell your Home. SUNNOVA. YOU AGREE TO REASONABLY In each of(i) and (ii) above, the price you will pay for COOPERATE WITH SUNNOVA SO THAT IT MAY the System will be the greater of the System's fair CLAIM ANY TAX CREDITS; RENEWABLE ENERGY market value ("FMV") and the amount shown on CREDITS. REBATES. CARBON OFFSET CREDITS, Schedule A. The interests of any financing party shall CAPACITY RIGHTS OR ANY OTHER BENEFITS not be taken into account when determining the FMV: FROM THE SYSTEM. THIS MAY INCLUDE TO THE a third-party independent appraiser will be retained to EXTENT ALLOWABLE BY LAW. ENTERING INTO compute the System's FMV. If you made an Upfront NET METERING AGREEMENTS, Payment, the price to purchase the System will be INTERCONNECTION AGREEMENTS; ENROLLING reduced to reflect and account for the Upfront IN ENERGY MANAGEMENT PROGRAMS AND Payment. Sunnova's maintenance and repair FILING RENEWABLE ENERGY/CARBON OFFSET obligations and this PPA will end when you purchase CREDIT REGISTRATIONS AND/OR APPLICATIONS the System unless you enter into a new maintenance FOR REBATES FROM THE FEDERAL, STATE OR and repair agreement with Sunnova, provided that you LOCAL GOVERNMENT OR A LOCAL UTILITY AND will have no less than a ten (10) year warranty on the GIVING THESE TAX CREDITS, RENEWABLE System beginning on the Interconnection Date that ENERGY/CARBON CREDITS. CAPACITY RIGHTS guarantees that the System will be free from defects REBATES OR OTHER BENEFITS TO SUNNOVA. in workmanship or defects in, or breakdown of. materials or components. ADDITIONALLY, YOU AGREE THAT SUNNOVA HAS THE RIGHT TO ENROLL THE SYSTEM OR 10. RENEWAL MANAGE THE ENROLLMENT OF THE SYSTEM IN If you are in compliance with your PPA, you have the ENERGY MANAGEMENT PROGRAMS AND YOU option to renew your PPA for up to ten (10) years in two 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:3/29/2023 ©2018 Sunnova Energy Corporation.All Rights Reserved. 9 Contract ID:VI005701027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 n Sunnova Home Solar Service S Un Va Easy PlanTM Power Purchase Agreement(PPA) Balanced Billing (2) consecutive five (5) year renewal periods. We will third-party consents or releases required by send you renewal forms at least ninety(90)days prior Sunnova in connection with the substitute to the expiration of the Term, which forms shall set forth premises. You agree that Sunnova will need the new rates per kWh applicable for the renewal term to reevaluate the production of your System as well as the rates applicable in the event the PPA is at the substitute premises and may need to renewed for one (1) year as provided for herein. The revise the estimates in your PPA and renewal forms will give you the option to: (a) elect to Limited Warranty. renew the PPA for an additional five (5) year term at the (iii) Prepay this Power Purchase Agreement rates specified in the renewal notice; or(b) elect not to and Transfer only the Use of the System renew the PPA. You must make your election whether to renew or not at least thirty(30) days prior to the end You can prepay this Power Purchase of the then current term of the PPA. In the event that Agreement as set forth in Section 4(k). The you affirmatively elect not to renew this PPA as Person buying your Home will only need to provided for in part(b) above this PPA shall expire by sign a transfer agreement to assume your its terms on the expiration of the then current term. rights and non-Monthly Payment obligations If you don't send us anything in writing you will be under this PPA. deemed to have renewed for an additional one(1) b. You agree to give Sunnova at least fifteen (15) year term at a rate which equals the rate per kWh days but not more than three(3) months' prior applicable at the expiration of the then current term written notice if you want someone to assume plus two point nine percent(2.9%)and this PPA your PPA obligations. In connection with this shall continue to renew for additional one(1)year assumption, you, your approved buyer and terms on the above described rate terms until(i) Sunnova shall execute a transfer agreement. you give us notice at least thirty(30) days prior to Unless we have released you from your the expiration of the then current term that you do obligations in writing. you are still responsible for not wish to renew;or(ii) we send you a notice performing under this PPA. If your buyer defaults terminating the PPA at least thirty(30) days prior to on this PPA and we have not yet signed the the expiration of the then current term. transfer agreement. you will be responsible for Homeowner(s)'Initials their default. We will release you from your f—Ds obligations under this PPA in writing once we have a signed transfer agreement with the person buying your Home (provided such person has been approved as a transferee by Sunnova in 11. SELLING YOUR HOME writing). a. If you sell your Home you can: c. If you sell your Home and can't comply with any of the options in subsection (a) above. you will be in (i) Transfer this Power Purchase Agreement default under this PPA. Death does not negate and the Monthly Payments the obligations in this PPA and does not give rise If the person buying your Home meets to a right of termination. In the event of death. this Sunnova's credit requirements, then where PPA and the obligations herein will transfer to the permitted by the local utility, the person decedent's estate. buying your Home can sign a transfer d. This PPA is free of any restrictions that would agreement assuming all of your rights and prevent the homeowner from freely transferring obligations under this Power Purchase their Property. In the event of a foreclosure on the Agreement. Property, your lender has the right (but not the (ii) Move the System to Your New Home obligation) to do ONE of the following: If you are moving to a new home in the (i) terminate this PPA and require Sunnova to same utility district, where permitted by the remove the System subject to your local utility; the System can be moved to obligations under Sections 14 and 15; your new home pursuant to the Limited Warranty. You will need to pay all costs (ii) become a beneficiary(but not obligor) of the associated with relocating and redesigning PPA free of charge (i.e. receive power from the System, execute and provide the same the System and enforce the Limited access and ownership rights to Sunnova as Warranty but not have the obligation to provided for in this PPA and provide any make payment, which obligation will remain 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.corn Date:3/29/2023 ©2018 Sunnova Energy Corporation.All Rights Reserved. 10 Contract ID: VI005701027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 , Sunnova Home Solar Service Su n n' va Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing with you—if you don't make timely payment damage, theft. destruction or similar occurrence to you will be in default under Section 14 and any or all of the System. Sunnova can terminate, remove the System In the event you are negligent or intentionally damage and take all other remedies it has under the System you shall be liable to pay Sunnova the Section 15): greater of(a)the actual damages suffered by (iii) enter into a new PPA with Sunnova on Sunnova; or(b) the amount determined in Section terms no less favorable than the current 4(k). Except as expressly provided in this PPA, no PPA; or loss. damage, theft or destruction will excuse you from (iv) require transfer of the PPA under this your obligations under this PPA, including Monthly Payments. Section 11 to a subsequent purchaser of the Property. 13. LIMITATION OF LIABILITY Sunnova will not prohibit the sale, conveyance or a. No Consequential Damages refinancing of the Property. Sunnova may choose SUNNOVA'S LIABILITY TO YOU UNDER THIS to file in the real estate records a UCC-1 financing POWER PURCHASE AGREEMENT SHALL BE statement("Fixture Filing")that preserves its LIMITED TO DIRECT, ACTUAL DAMAGES rights in the System. The Fixture Filing is ONLY. YOU AGREE THAT IN NO EVENT intended only to give notice of its rights relating to SHALL EITHER PARTY BE LIABLE TO THE the System and is not a lien or encumbrance OTHER FOR CONSEQUENTIAL, INCIDENTAL, against the Property. Sunnova shall explain the PUNITIVE, EXEMPLARY, SPECIAL OR Fixture Filing to any subsequent purchasers of the INDIRECT DAMAGES. Property and any related lenders as requested. Sunnova shall also accommodate reasonable b. Actual Damages requests from lenders or title companies to EXCEPT FOR CLAIMS UNDER SECTION 4(1), facilitate a purchase, financing or refinancing of NEITHER PARTY'S LIABILITY TO THE OTHER the Property. If Sunnova temporarily removes its WILL EXCEED AN AMOUNT EQUAL TO THE Fixture Filing in order to facilitate the purchase. MAXIMUM AMOUNT THAT COULD BE financing or refinancing of the Property, Sunnova PAYABLE BY YOU UNDER SECTION 15(J). may charge you a UCC Notice Removal and DAMAGES TO YOUR HOME, BELONGINGS OR Refiling fee, in the amount charged to Sunnova by PROPERTY RESULTING FROM THE the local jurisdiction, and a processing fee for its INSTALLATION OR OPERATION OF THE expenses. SYSTEM ARE COVERED IN THE LIMITED e. EXCEPT AS SET FORTH IN THIS SECTION. WARRANTY. YOU WILL NOT ASSIGN, SELL; PLEDGE OR IN 14. DEFAULT ANY OTHER WAY TRANSFER YOUR INTEREST IN THE SYSTEM OR THIS PPA You will be in default under this Power Purchase WITHOUT OUR PRIOR WRITTEN CONSENT. Agreement if any one of the following occurs: WHICH SHALL NOT BE UNREASONABLY WITHHELD AS LONG AS YOU AND THE a. you fail to make any payment when it is due PROPOSED TRANSFEREE MEET THE OTHER and such failure continues for a period of REQUIREMENTS SET FORTH HEREIN. ten (10) days; BY INITIALING BELOW; YOU EXPRESSLY b. you fail to perform any material obligation AGREE THAT YOU HAVE READ THIS SECTION that you have undertaken in this PPA 11 IN ITS ENTIRETY AND AGREE TO ITS (which includes doing something you have TERMS. agreed not to do. like alter the System) and such failure continues for a period of Homeowner(s)'Initials fourteen (14) days after written notice; FDs C. you have provided any false or misleading financial or other information to obtain this Power Purchase Agreement; 12. LOSS OR DAMAGE d. you assign, transfer, encumber. sublet or Unless you are negligent or you intentionally damage sell this PPA or any part of the System the System, Sunnova will bear all of the risk of loss, without Sunnova's prior written consent: or 20 East Greenway Plaza Ste 475,Houston,TX 77046 Date:3/29/2023 281.985.9900. www.sunnova.com ContracDt t :3/29/2023 ©2018 Sunnova Energy Corporation.All Rights Reserved. 11 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601 C9BA1 E3 -�, Sunnova Home Solar Service Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing e. you make an assignment for the benefit of compensation, on a net after tax basis creditors, admit in writing your insolvency, assuming a tax rate of 35%, for the loss or file or have filed against you a petition in recapture of(A) the investment tax credit bankruptcy, are adjudicated bankrupt or applicable with respect to the System cost, insolvent or undertake or experience any including installation; and (B) accelerated substantially similar activity. depreciation over five (5) years equal to 15. REMEDIES IN CASE OF DEFAULT eighty five percent (85%) of the System cost. including installation, and for the loss If this Power Purchase Agreement is in default, we of any anticipated benefits pursuant to may take any one or more of the following actions. If Section 8 of this PPA(Sunnova shall furnish the law requires us to do so, we will give you notice you with a detailed calculation of such and wait any period of time required before taking any compensation if such a claim is made); or of these actions. We may: k. use any other remedy available to us in this a. terminate this PPA and your rights to PPA or by law. possess and use the System: We may submit to credit reporting agencies (credit b. suspend our performance under the PPA; bureaus) negative credit reports that would be reflected on your credit record if you do not pay any c. take any reasonable action to correct your amounts due under this PPA as required. default or to prevent our loss. Any amount we pay will be added to the amount you You agree to repay us for any reasonable amounts we owe us and will be immediately due; incur to correct or cover your default and to enforce d. require at expense; to return the our rights under this PPA including, but not limited to, System you.or at make it your expensavailable , us in a attorneys fees and court costs. You also agree to reimburse us for any costs and expenses we incur reasonable manner; relating to the System's return resulting from early e. proceed, by appropriate legal action, to termination. By choosing any one or more of these enforce performance of this PPA and to remedies, Sunnova does not give up its right to use recover damages for your breach; another remedy. By deciding not to use any remedy should this Power Purchase Agreement be in default, f. disconnect, turn off or take back the System Sunnova does not give up our right to use that remedy by legal process or self-help, but we may in case of a subsequent default. not disturb the peace or violate the law; 16. ADDITIONAL AGREEMENTS g. report such non-operational status of the System to your utility, informing them that a. Notice of Changes. You agree to notify us if you are no longer net metering: your name or mailing address changes or if there is any material deterioration in your h. charge you a reasonable reconnection fee financial circumstances or any material for reconnecting the System to your utility or changes to the condition of your Home that turning the System back on after we would impact the System or impact our disconnect or turn off the System due to interest in the System. your default; b. Waiver of Confidentiality of Residence i. in the case of your failure to protect the Address. By signing this PPA, and so long System from animals, infestation, or as you have a contract with us, you waive the overgrown tree growth and foliage, confidentiality of your residence address unilaterally adjust the contract terms upon under the provisions of any applicable law and notice to you for reduced production as authorize us to obtain from the applicable appropriate; state agency your current residence address. j. recover from you (i) all accrued but unpaid c. Personal Information and Privacy Policy. Monthly Payments, taxes: late charges. Please see Sunnova's Privacy Policy on our penalties, interest and all or any other sums website: https://www.sunnova.com/privacy- then accrued or due and owing, plus (ii)the policy for more information about how we estimated amount of future Monthly collect and use personal information. You Payments, each payment discounted to have read, understand and agree with the present value at 5% per annum (plus any terms of Sunnova's Privacy Policy as set forth other applicable taxes), plus (iii) reasonable 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com /29 3 Date: 12023 ©2018 Sunnova Energy Corporation.All Rights Reserved. 12 Contract ID: . /29 01027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 \( Sunnova Home Solar Service S Iva Easy PlanT"" Power Purchase Agreement(PPA) Balanced Billing on our website: CLASS ACTION OR SIMILAR PROCEEDING. IN https://www.sunnova.com/privacy-policy You ARBITRATION, A DISPUTE IS RESOLVED BY AN also understand that Sunnova's Privacy Policy ARBITRATOR INSTEAD OF A JUDGE OR JURY. may be changed from time to time. In this Section, the words "you" and "your" mean any d. Monitoring and Recording Telephone person signing this PPA as a Homeowner or Co Calls. We and others acting on our behalf Homeowner. Unless the context requires otherwise, may(a) monitor and record telephone calls the words"we," ''us" and Four" mean Sunnova and any between you and us regarding this PPA and assignee of this PPA. (b) use automatic dialing equipment to make The laws of the state where your Home is located calls to you. You expressly consent to our, shall govern the substance of your claims under this and others acting on our behalf, using PPA without giving effect to conflict of laws principles. prerecorded/artificial voice messages, or text You and we agree that any dispute, claim or messages, while servicing and enforcing our disagreement between you and us (a"Dispute") shall rights under this PPA, including the collection be resolved exclusively by arbitration except as of outstanding payments. In making calls to specifically provided below. Disputes covered by this you, you agree that we, and others acting on agreement include but are not limited to: claims our behalf. may use any telephone number arising out of or relating to this PPA; claims arising out you provide us, or that is lawfully given to us of or relating to our relationship: claims that arose by someone other than you even if the before this or any prior agreement(including. but not number is for a mobile telephone. and even if limited to, claims relating to advertising); consumer our doing so results in charges to you under protection claims; and claims under any federal or your telephone payment plan. We will not state statute. charge you for such calls. The arbitration. including the selection of the Homeowner(s)'Initials arbitrator, will be administered by the American c— os Arbitration Association ("AAA") under its Consumer Arbitration Rules (the "Rules") by a single neutral arbitrator. Either party may initiate the arbitration 17. SYSTEM REMOVAL: RETURN process by filing the necessary forms with the AAA. To learn more about arbitration before the AAA, you At the end of the Term or the termination of this PPA, can review materials available at www.adr.org. The if you have not renewed this PPA or exercised your arbitration shall be held in the location that is most purchase option (if any) and you have not defaulted, convenient to your Home. If the AAA is unavailable to then within ninety (90)days you agree to call Sunnova administer the dispute, then the arbitration, including at the telephone number listed in Exhibit 2. or any the selection of the arbitrator, will be administered by other number we notify you of in the future, to JAMS, under its Streamlined Arbitration Rules(the schedule a convenient time for Sunnova to remove "Rules") by a single neutral arbitrator agreed on by the the System from your Home at no cost to you unless parties within thirty(30) days of the commencement of the termination was due to your default which is the arbitration. If JAMS is not available either, then addressed in Section 15. the parties shall select another recognized arbitration administrator which can offer a location for arbitration 18. APPLICABLE LAW that is close to your Home. The laws of the state where your Home is located, If you initiate the arbitration. you will be required to without giving effect to conflict of laws principles, shall pay the first $125 of any filing fee. We will pay any govern this PPA, except the Federal Arbitration Act, 9 filing fees in excess of 3125 and we will pay all of the U.S.C. § 1, et seq., shall govern interpretation, arbitration fees and costs. If we initiate the arbitration, enforcement and proceedings under Section 19. and we will pay all of the filing fees and all of the not the arbitration acts, statutes or rules of any other arbitration fees and costs. The parties will each bear jurisdiction. all of our own respective attorney's fees, witness fees. 19. ARBITRATION and costs unless the arbitrator decides otherwise. PLEASE READ THIS SECTION CAREFULLY. The arbitrator shall have the authority to award any ARBITRATION REPLACES THE RIGHT TO GO TO legal or equitable remedy or relief that a court could COURT, INCLUDING THE RIGHT TO A JURY order or grant under this PPA. The arbitrator, TRIAL AND THE RIGHT TO PARTICIPATE IN A however, is not authorized to change or alter the 20 East Greenway Plaza Ste 475,Houston;TX 77046 281.985.9900. www.sunnova.com Date:3/29/2023 ©2018 Sunnova Energy Corporation.All Rights Reserved. 13 Contract ID:VI005701027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601 C9BA1 E3 S U n n ova TM Sunnova Home Solar Service Easy Plan Power Purchase Agreement(PPA) Balanced Billing terms of this PPA or to make any award that would DISPUTE. THE ARBITRATOR'S DECISION WILL BE extend to any transaction other than yours. All FINAL AND BINDING ON THE PARTIES AND MAY statutes of limitation that are applicable to any Dispute BE ENTERED AND ENFORCED IN ANY COURT shall apply to any arbitration between you and us. The HAVING JURISDICTION, EXCEPT TO THE EXTENT arbitrator will issue a decision or award in writing, IT IS SUBJECT TO REVIEW IN ACCORDANCE briefly stating the essential findings of fact and WITH APPLICABLE FEDERAL LAW GOVERNING conclusions of law. ARBITRATION AWARDS. OTHER RIGHTS THAT Only Disputes involving you and us may be addressed YOU OR WE WOULD HAVE IN COURT MAY ALSO NOT BE AVAILABLE IN ARBITRATION. in the arbitration. Disputes must be brought in the name of an individual person or entity and must ALL DISPUTES AND DETERMINATIONS proceed on an individual (non-class, non- CONCERNING THE ARBITRABILLITY OF A CLAIM representative) basis. The arbitrator will not award (INCLUDING DISPUTES ABOUT THE SCOPE, relief for or against anyone who is not a party to the APPLICABILITY, ENFORCEABILITY, Dispute. If you and we arbitrate a Dispute, none of REVOCABILITY; UNCONSCIONABILITY, OR you or us. nor any other person, may pursue the VALIDITY OF THIS LEASE OR THIS SECTION) Dispute in arbitration as a class action; class SHALL BE DECIDED BY THE ARBITRATOR. arbitration, private attorney general action or other NOTWITHSTANDING THE FOREGOING, NOTHING representative action. nor may any such Dispute be HEREIN CONTAINED SHALL BAR YOU OR US pursued on your or our behalf in any litigation in any FROM: (I) OBTAINING INJUNCTIVE RELIEF FROM court except as specifically provided below. Claims A COURT AGAINST THREATENED CONDUCT regarding any Dispute and remedies sought as part of THAT COULD CAUSE IRREPARABLE HARM. LOSS a class action, class arbitration. private attorney OR DAMAGE. UNDER THE USUAL EQUITY RULES, general or other representative action are subject to INCLUDING THE APPLICABLE RULES FOR arbitration only on an individual (non-class, non OBTAINING RESTRAINING ORDERS AND representative) basis, and the arbitrator may award PRELIMINARY INJUNCTIONS OR (II) OBTAINING A relief only on an individual (non class; non JUDGMENT FROM A COURT HAVING representative) basis. This means that the arbitration JURISDICTION CONFIRMING THE AWARD OF THE may not address disputes involving other persons with ARBITRATOR; OR (III) OBTAINING RESOLUTION disputes similar to the Disputes between you and us. OF A DISPUTE IN A SMALL CLAIMS COURT IF THE If any part of this paragraph of this Section is found to DISPUTE FALLS WITHIN THE JURISDICTION OF be unenforceable by an arbitrator or a court having THE SMALL CLAIMS COURT(PROVIDED, jurisdiction over a Dispute, then this entire Section HOWEVER, THAT NO ATTEMPT IS MADE TO (except for this sentence and the following sentence) TRANSFER RESOLUTION OF SUCH A DISPUTE shall be automatically inapplicable to that Dispute. FROM A SMALL CLAIMS COURT TO A COURT OF EVEN IF ANY PART OF THIS SECTION IS FOUND GENERAL JURISDICTION). TO BE UNENFORCEABLE AS DESCRIBED ABOVE. YOU UNDERSTAND THAT BY SIGNING BELOW YOU AND WE EACH AGREE TO WAIVE THE RIGHT YOU ARE VOLUNTARILY AGREEING TO TO A TRIAL BY JURY IN CONNECTION WITH ANY ARBITRATE DISPUTES ARISING UNDER THIS DISPUTE THAT MIGHT ARISE BETWEEN OR AGREEMENT AND THAT YOU GIVE SPECIFIC INVOLVING YOU AND US, AND THE RIGHT TO AUTHORIZATION TO SUBMIT TO ARBITRATION PARTICIPATE IN A CLASS ACTION OR SIMILAR AND AGREE TO THE PROVISIONS IN THIS PROCEEDING IN CONNECTION WITH ANY SUCH SECTION: DISPUTE. BECAUSE YOU AND WE HAVE AGREED TO Homeowner(s)'Signature ARBITRATE ALL DISPUTES EXCEPT AS ,.—DDocuSignedby: SPECIFICALLY PROVIDED IN THE LAST I t atiaS IttivAity PARAGRAPH OF THIS SECTION, YOU AND WE `—381332CBDBA1741D_ WILL NOT HAVE THE RIGHT TO LITIGATE THAT 20. WAIVER DISPUTE IN COURT, OR TO HAVE A JURY TRIAL ON THAT DISPUTE; OR ENGAGE IN DISCOVERY Any delay or failure of a party to enforce any of the EXCEPT AS PROVIDED FOR IN THE RULES. provisions of this PPA, including but not limited to any FURTHER. YOU WILL NOT HAVE THE RIGHT TO remedies listed in this PPA; or to require performance PARTICIPATE AS A REPRESENTATIVE OR by the other party of any of the provisions of this PPA, MEMBER OF ANY CLASS PERTAINING TO ANY shall not be construed to (i) be a waiver of such 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:3/29/2023 ©2018 Sunnova Energy Corporation.All Rights Reserved. 14 Contract ID:VI005701027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 S' ' l^ Sun nova Home Solar Service �/ Q Easy PlanTM Power Purchase Agreement(PPA) at� t. Balanced Billing provisions or a party's right to enforce that provision; Sunnova will not publicly use or display any images of or(ii) affect the validity of this PPA. the System unless you initial the space below. If you 21. NOTICES initial the space below, you give us permission to take pictures of the System as installed on your Home to With the exception of the Notice of Cancellation in show to other customers or display on our website. Exhibit 1, all notices under this PPA shall be in writing Homeowner(s)'Initials and shall be by personal delivery, facsimile transmission, electronic mail, overnight courier, or certified or registered mail, return receipt requested. .ii.iv itiaihereoptionaLl rll.initialhereoptional. : and deemed received upon personal delivery, acknowledgment of receipt of electronic transmission, 25. COUNTERPARTS the promised delivery date after deposit with overnight courier, or five (5) days after deposit in the mail. This PPA may be executed simultaneously in any Notices shall be sent to the person identified in this number of counterparts. Each counterpart shall be PPA at the addresses set forth in this PPA or such deemed to be an original; and all such counterparts other address as either party may specify in writing. shall constitute one and the same instrument. The Each party shall deem a document faxed to it as an parties agree that this PPA and signature pages may original document. be signed electronically and transmitted between them by facsimile or by electronic mail and that 22. ENTIRE AGREEMENT; CHANGES electronic, faxed and PDF signatures shall constitute This PPA contains the parties' entire agreement original signatures and that an electronic, faxed or regarding the sale and purchase of power generated PDF signature page containing the signature by the System. There are no other agreements (electronic; faxed, PDF or original) is binding upon the regarding this PPA, either written or oral. Any change parties. to this PPA must be in writing and signed by both 26. FURTHER ASSURANCES parties. If any portion of this PPA is determined to be unenforceable, the remaining provisions shall be You will cooperate fully with us to effect the intent and enforced in accordance with their terms or shall be provisions of this PPA and, from time to time, to interpreted or re written so as to make them execute and deliver any and all other agreements, enforceable. documents or instruments, and to take such other actions. as Sunnova may determine to be reasonably 23. HEADINGS AND INTERPRETATION necessary or desirable to effect the intent and The headings in this PPA are for convenience or provisions of this PPA. reference only. They do not limit or modify the term or 27. COMMUNICATIONS EQUIPMENT provision. In some sections where examples are given. you acknowledge that the examples cover During installation or at any time thereafter during the some, but not all, of the situations or items that are Term, we may install, replace or update covered by the section or the PPA. communication equipment (for example; an antenna) (the"Communication Equipment") at the Home. The Unless specifically referred to as"business day(s)", all Communication Equipment will be used in connection references to"day" or"days" shall mean calendar with the System and to enhance connectivity and days, meaning every consecutive day on the calendar communication. If you initial the space below, you give including holidays and weekends. All periods stated in Sunnova consent for the installation of the days should count every day including intermediate Communication Equipment, if, when; and as needed. Saturdays, Sundays and holidays and include the last Homeowner(s)'Initials day of the period, but if the last day is a Saturday, Sunday or a holiday. the period continues to run until the end of the next day that is not a Saturday.. Sunday or a holiday. All references to `business day(s)' mean only those calendar days that are not Saturday, Sunday or a holiday; and in counting a period of "business days" all Saturdays, Sundays and holidays REST OF PAGE INTENTIONALLY LEFT BLANK should be excluded. 24. PUBLICITY 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.corn Date:3/29/2023 ©2018 Sunnova Energy Corporation.All Rights Reserved. 15 Contract ID: VI005701027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 S U n n va TM Sunnova Home Solar Service Easy Plan Power Purchase Agreement(PPA) Balanced Billing 28. SIGNATURES I have read this Power Purchase Agreement, including Schedule A, and the Exhibits in their entirety and I acknowledge that I have received a complete copy of this Power Purchase Agreement. DO NOT SIGN THIS POWER PURCHASE AGREEMENT IF THERE ARE ANY BLANK SPACES. NOTICE OF RIGHT TO CANCEL: YOU, THE BUYER, MAY CANCEL THIS TRANSACTION AT ANY TIME PRIOR TO MIDNIGHT OF THE SEVENTH BUSINESS DAY AFTER THE DATE OF THIS TRANSACTION. SEE EXHIBIT 1, THE ATTACHED NOTICE OF CANCELLATION FORM FOR AN EXPLANATION OF THIS RIGHT. Homeowner's „341,0NIAS 1 NEHMER Signature. L ' Date: March 29, 2023 I 11:13 MDT 36D32CBDBA1741 D... Co-Homeowner's Name (if any): Signature: Date: Sunnova Energy Corporation John Santo Salvo Authorized Signatory 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.corn Date:3/29/2023 ©2018 Sunnova Energy Corporation.All Rights Reserved. 16 Contract ID: VI005701027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 rl^` '� ' Sunnova Home Solar Service S� � ter,,,, t / Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing SCHEDULE A VALUE STATEMENT Estimated Solar Energy Production Estimated First Year Annual Production: 4,116 kWh Estimated Initial Term Total Production: 96,948 kWh Payment Terms Upfront Payment Amount: $0.00 Amount Due at Contract Signing: $0.00 Installation Fee: $0.00 Annual Increase of Solar Energy Rate: 2.90%/year First Year Solar Energy Rate, if paid by auto-ACH: $0.199/kWh First Year Solar Energy Rate, if not paid by auto-ACH: $0.219/kWh Reduced Annual Solar Energy Rate, if paid by $0.199/kWh auto-ACH: Reduced Annual Solar Energy Rate', if not paid $0.219/kWh by auto-ACH: Estimated Monthly Bill in First Year, if paid by auto- $68.25/month ACH: Estimated Monthly Bill in First Year, if not paid by $75.08/month auto-ACH: 2)Reduced Annual Solar Energy Rate applies if an Upfront Payment is made. By your initials here you acknowledge that you have reviewed this Schedule A. o Homeowner(s)'Initials Thi #rTere.i dl.initiaihere.2 Prepay Option Purchase Option End of Annual Price Annual Price Estimated kWh Estimated Price to Minimum Cash Year per kWh per kWh per year Prepay the Remainder Purchase Price' (assuming payment (assuming payment by of the Initial Term2 NOT by ACH)3 ACH)3 1 S0.219 S0.199 4,116 314..949.50 S0.00 2 $0.225 $0.205 4,095 $14,835.82 $0.00 3 $0.232 S0.211 4,075 S14.695.92 S0.00 4 $0.239 $0.217 4,054 $14,527.99 $0.00 5 S0.245 S0.223 4,034 S14.332.11 S0.00 6 $0.253 $0.230 4,014 $14,102.40 $14,484.32 7 S0.260 S0.236 3,994 S13.838.64 S14,123.95 8 $0.267 $0.243 3,974 $13,538.58 $13,729.28 9 S0.275 S0.250 3.954 S13.201.68 _ S13.299.84 10 $0.283 $0.257 3,934 $12,821.87 $12,829.58 11 S0.291 S0.265 3,914 S12,398.27 S12,398.27 12 $0.300 $0.273 3,895 $11,928.09 $11,928.09 __ 13 S0.308 S0.280 3.875 S11.410.00 S11,410.00 20 East Greenway Plaza Ste 475,Houston.TX 77046 281.985.9900. vwwv.sunnova.corn Date:3/29/2023 ©2018 Sunnova Energy Corporation.All Rights Reserved. 17 Contract ID:VI005701027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 S U n n '' Sunnova Home Solar Service Q Easy PlanTM Power Purchase Agreement (PPA) Balanced Billing 14 $0.317 $0.289 3,856 $10,837.78 $10,837.78 15 S0.32 7 S0 297 3.837 S 10.209 69 S 10.209.69 16 $0.336 $0.306 3,818 $9,522.28 $9,522.28 17 SO 346 S0 314 3.798 S8 773 18 S8 773 18 18 $0.356 $0.324 3,779 $7,956.12 $7,956.12 19 S0.366 S0.333 3,761 S7 068 24 S7.068 24 20 $0.377 $0.343 3,742 $6,105.30 $6,105.30 21 SO 388 50.353 3.723 S5.063 58 S5,063 58 22 $0.399 - -- $0.363 3,704 $3,936.86 $3,936.86 23 S0.411 S0 373 3 686 S2 720 89 S2 720 89 24 $0.422 $0.384 3,668 $1,410.41 $1,410.41 25 S0.435 S0.395 3,649 S0.00 S0.00 1)Per Section 9,the price you will pay to purchase the System will be the greater of the System's fair market value("FMV')and the amount shown above as the Purchase Option on Schedule A. In the event that you made an Upfront Payment,the Minimum Cash Purchase Price is reduced to reflect the receipt of the Upfront Payment. 2)Per Section 4(k)of the PPA,the prepayment amounts shown above reflect a 5%present value discount rate. In the event you made an Upfront Payment,the prepay option price is reduced to reflect the receipt of the Upfront Payment. 3)If you made an Upfront Payment,this rate is the Reduced Annual Solar Energy Rate. 20 East Greenway Plaza Ste 475, Houston,TX 77046 281.985.9900. www.sunnova.com Date 3/29/2023 ©2018 Sunnova Energy Corporation.All Rights Reserved. 18 Contract ID:VI005701027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 Sun "rwa Sun nova Home Solar Service Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing EXHIBIT 1 NOTICE OF CANCELLATION Date of Transaction: March 29, 2023 I 11:13 MDT You may cancel this transaction, without any penalty or obligation, within seven (7) business days from the above date. If you cancel, any property traded in, any payments made by you under the contract or sale and any negotiable instrument executed by you will be returned within 10 days following receipt by the seller(Sunnova Energy Corporation) of your cancellation notice, and any security interest arising out of the transaction will be canceled. If you cancel, you must make available to the seller(Sunnova Energy Corporation) at your residence, in substantially as good condition as when received, any goods delivered to you under this contract or sale, or you may, if you wish, comply with the instructions of the seller(Sunnova Energy Corporation) regarding the return shipment of the goods at the seller's (Sunnova Energy Corporation's) expense and risk. If you do make the goods available to the seller(Sunnova Energy Corporation) and the seller(Sunnova Energy Corporation) does not pick them up within 20 days of the date of your notice of cancellation, you may retain or dispose of the goods without any further obligation. If you fail to make the goods available to the seller(Sunnova Energy Corporation), or if you agree to return the goods to the seller (Sunnova Energy Corporation) and fail to do so, then you remain liable for performance of all obligations under the contract. To cancel this transaction, mail or deliver a signed and dated copy of this cancellation notice, or any other written notice, or send a telegram to Sunnova Energy Corporation, 20 Greenway Plaza, Ste 475, Houston, TX 77046 not later than midnight of the date that is seven (7) business days from the Transaction Date indicated above. I hereby CANCEL/RESCIND this transaction on [Cancellation Date]. Homeowner's Signature: Co-Homeowner's Signature: THOMAS NEHMER Installation Address: 31 TAFT RD WEST YARMOUTH; MA 02673 Contract ID: VI005701027 20 East Greenway Plaza Ste 475,Houston TX 77046 Date 3/29/2023 281 985.9900 www.sunnova.com Contract ID'VI005701027 ©2021 Sunnova Energy International, Inc.All Rights Reserved. 1 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 SU n n n Ua Sunnova Home Solar Service Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing EXHIBIT 1 NOTICE OF CANCELLATION (DUPLICATE) Date of Transaction: March 29, 2023 I 11:13 MDT You may cancel this transaction, without any penalty or obligation, within seven (7) business days from the above date. If you cancel, any property traded in, any payments made by you under the contract or sale and any negotiable instrument executed by you will be returned within 10 days following receipt by the seller(Sunnova Energy Corporation) of your cancellation notice, and any security interest arising out of the transaction will be canceled. If you cancel, you must make available to the seller(Sunnova Energy Corporation) at your residence, in substantially as good condition as when received, any goods delivered to you under this contract or sale, or you may, if you wish, comply with the instructions of the seller(Sunnova Energy Corporation) regarding the return shipment of the goods at the seller's (Sunnova Energy Corporation's) expense and risk. If you do make the goods available to the seller(Sunnova Energy Corporation) and the seller(Sunnova Energy Corporation) does not pick them up within 20 days of the date of your notice of cancellation, you may retain or dispose of the goods without any further obligation. If you fail to make the goods available to the seller(Sunnova Energy Corporation), or if you agree to return the goods to the seller (Sunnova Energy Corporation) and fail to do so, then you remain liable for performance of all obligations under the contract. To cancel this transaction, mail or deliver a signed and dated copy of this cancellation notice, or any other written notice, or send a telegram to Sunnova Energy Corporation, 20 Greenway Plaza, Ste. 475, Houston, TX 77046 not later than midnight of the date that is seven (7) business days from the Transaction Date indicated above. I hereby CANCEL/RESCIND this transaction on [Cancellation Date]. Homeowner's Signature: Co-Homeowner's Signature: THOMAS NEHMER Installation Address: 31 TAFT RD WEST YARMOUTH; MA 02673 Contract ID: VI005701027 20 East Greenway Plaza Ste 475,Houston,TX 77046 Date 3/29/2023 281 985.9900 www.sunnova.com ©2021 Sunnova Energy International, Inc.All Rights Reserved. 2 Contract ID:VI005701027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 S ( t U fl n U aSunnova Home Solar Service Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing EXHIBIT 2 LIMITED WARRANTY 1. INTRODUCTION This Limited Warranty(this ''Limited Warranty") is Sunnova's agreement to provide you warranties on the System you are hosting pursuant to our PPA. The System will be professionally installed by a contractor acting on Sunnova's behalf at the address you listed in the PPA. We will refer to the installation location as your"Property" or your"Home." This Limited Warranty begins when our contractor starts installing the System at your Home. We look forward to helping you produce clean, renewable solar power at your Home.To the extent that you prepay the PPA or purchase the System during the Term of the PPA. this Exhibit 2 shall continue to apply and be enforceable until what would have been the end of the original Term. For purposes of this Limited Warranty the term "Sunnova" means Sunnova Energy Corporation or its successors and assigns. 2. LIMITED WARRANTIES a. Limited Warranties Sunnova warrants the System as follows: (i) System Warranty During the entire Power Purchase Agreement Term, under normal use and service conditions., the System will be free from defects in workmanship or defects in. or a breakdown of, materials or components(the `System Warranty"); (ii) Roof Warranty When our contractors penetrate your roof during a System installation we will warrant roof damage caused by our contractors due to our roof penetrations. This roof warranty will run the longer of(A)ten (10) years following the completion of the System installation, and (B)the length of any existing installation warranty or new home builder performance standard for your roof(the"Roof Warranty Period"): and (iii) Repair Promise During the entire Power Purchase Agreement Term. Sunnova will honor the System Warranty and will repair or replace any defective part, material or component or correct any defective workmanship, at no cost or expense to you(including all labor costs), when you submit a valid claim to us under this Limited Warranty. If our contractors damage your Home. your belongings or your Property we will cause our contractors to repair the damage they cause or pay you for the damage as described in Section 6. Sunnova may use new or reconditioned parts when making repairs or replacements. Sunnova may also, at no additional cost to you, upgrade or add to any part of the System as it deems advisable in its discretion. Cosmetic repairs that do not involve safety or performance shall be made at Sunnova's discretion. b. Warranty Length (i) The warranties in Sections 2(a)(i) and 2(a)(iii) above will start when our contractors begin installing the System at your Home and continue through the entire Power Purchase Agreement Term but never less than ten(10) years. Thus,for as long as you host the System from Sunnova under a PPA, you will have a System Warranty and our Repair Promise. (ii) The Roof Warranty Period may be shorter than the System Warranty, as described in Section 2(a)(ii) above. (iii) If you have assumed an existing PPA in accordance with the terms and conditions of the PPA, then this Limited Warranty will cover you for the remaining balance of the existing Power Purchase Agreement Term. c. Maintenance and Operation (i) General When the System is installed Sunnova will provide you with a copy of its Solar Service Guide. The Solar Service Guide provides you with information about your System and solar energy, monitoring and maintenance instructions, answers to frequently asked questions and service information. 20 East Greenway Plaza Ste 475.Houston,TX 77046 Date 3/29/2023 281.985.9900 www.sunnova.com ©2021 Sunnova Energy International, Inc All Rights Reserved. 1 Contract ID:VI005701027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 SU n n V a' Sunnova Home Solar Service Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing (ii) Power Monitor The Power Monitor requires access to cellular networks in order to operate. If cellular service is not available then (A)we will not be able to monitor the System; and(B) you will be required to provide Sunnova with annual production information from your inverter or(C) Sunnova, in its sole discretion, will estimate production. In connection with any such estimated production by Sunnova, Sunnova will make commercially reasonable methods to estimate the missing kWh based on available information and such estimate will be included in the calculations under Schedule A for such period. In the event that no such information is reasonably accessible, Sunnova will make the adjustment based on the original kWh expectation attributable to such period. d. Making a Claim; Transferring this Warranty (i) Claims Process You can make a claim by: A. emailing us at the email address in Section 7 below; B. writing us a letter at the mailing address in Section 7 below and sending it overnight mail with a well-known service; C. sending us a fax at the number in Section 7 below; or D. creating a claim through our online customer portal (as more particularly set forth in the Solar Service Guide when the System is installed). (ii) Transferable Limited Warranty Sunnova will accept and honor any valid and properly submitted Warranty claim made during any Term by any person who either purchases the System from you or to whom you properly transfer the PPA in accordance with the terms and conditions contained in the PPA. e. Exclusions and Disclaimer The limited warranties provided in this Limited Warranty do not apply to any lost power production or any repair, replacement or correction required due to the following: (i) someone other than Sunnova or its approved service providers installed, removed. re-installed or repaired the System: (ii) destruction or damage to the System or its ability to safely produce power not caused by Sunnova or its approved service providers while servicing the System (e.g.. if a tree falls on the System we will replace the System per the Power Purchase Agreement. but we will not repay you for power it did not produce): (iii) your failure to perform. or breach of, your obligations under the Power Purchase Agreement(e.g., you modify or alter the System); (iv) your failure to promptly submit a claim or report damage or an unsafe condition, resulting in the exacerbation of the damage or condition; (v) your breach of this Limited Warranty, including your being unavailable to provide access or assistance to us or our contractors in diagnosing or repairing a problem, or your failing to maintain the System as stated in the Solar Service Guide; (vi) any Force Majeure Event(as defined below); (vii) shading from foliage that is new growth or is not kept trimmed to its appearance on the date the System was installed; (viii) any system failure or lost production not caused by a System defect(e.g., the System is not producing power because it has been removed to make roof repairs or you have required us to locate the inverter in a non- shaded area); (ix) theft of the System (e.g., if the System is stolen we will replace the System per the Power Purchase Agreement, but we will not repay you for the power it did not produce); -------- -------- 20 East Greenway Plaza Ste 475.Houston,TX 77046 Date 3/29/2023 281.985.9900 www.sunnova.com ©2021 Sunnova Energy International. Inc.All Rights Reserved. 2 Contract ID:VI005701027 DocuSign Envelope ID:88C408`8C-2F26-4B8C-AC64-EF601C9BA1E3 SU n n ,�a Sunnova Home Solar Service . Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing (x) a power or voltage surge caused by someone other than Sunnova or the Installer, including a grid supply voltage outside of the standard range specified by the local utility or the System specifications or as a result of a local power outage or curtailment; and (xi) a change in usage of the Property or any buildings at or near such Property that may affect insolation without Sunnova's prior written approval. This Limited Warranty gives you specific rights, and you may also have other rights which vary from state to state. This Limited Warranty does not warrant any specific electrical performance of the System. THE LIMITED WARRANTIES DESCRIBED IN SECTION 2(a)ABOVE ARE THE ONLY WARRANTIES MADE BY SUNNOVA WITH RESPECT TO THE SYSTEM.SUNNOVA HEREBY DISCLAIMS, AND ANY BENEFICIARY OF THIS LIMITED WARRANTY HEREBY WAIVES. ANY WARRANTY WITH RESPECT TO ANY COST SAVINGS FROM USING THE SYSTEM.WITHOUT LIMITING THE FOREGOING THERE ARE NO OTHER REPRESENTATIONS OR WARRANTIES, EXPRESS OR IMPLIED. AS TO THE MERCHANTABILITY, FITNESS FOR ANY PURPOSE. CONDITION, DESIGN. CAPACITY. SUITABILITY OR PERFORMANCE OF THE SYSTEM OR ITS INSTALLATION. 3. SUNNOVA'S STANDARDS For the purpose of this Limited Warranty the standards for our performance will be(i) normal professional standards of performance within the solar photovoltaic power generation industry in the relevant market; and(ii) Prudent Electrical Practices. "Prudent Electrical Practices" means those practices, as changed from time to time, that are engaged in or approved by a significant portion of the solar power electrical generation industry operating in the United States to operate electric equipment lawfully and with reasonable safety, dependability, efficiency and economy. 4. SYSTEM REPAIR, RELOCATION OR REMOVAL a. You agree that if(i) the System needs any repairs that are not the responsibility of Sunnova under this Limited Warranty, (ii) the System needs to be removed and reinstalled to facilitate remodeling of your Home or(iii) the System is being relocated to another home you own pursuant to the Power Purchase Agreement, you will have Sunnova, or another qualified service provider we approve. at your expense. perform such repairs. removal and reinstallation, or relocation on a time and materials basis. b. If you want to return the System to Sunnova under Section 17 of the Power Purchase Agreement then Sunnova will cause our contractors to remove the System at no cost to you. Sunnova will cause our contractors to remove the posts, waterproof the post area and return the roof as close as is reasonably possible to its original condition before the System was installed(e.g. ordinary wear and tear and color variances due to manufacturing changes are excepted). Sunnova will warrant the waterproofing for one(1) year after it removes the System. You agree to reasonably cooperate with Sunnova or its contractors in removing the System including providing necessary space, access and storage, and we or our contractors will reasonably cooperate with you to schedule removal in a time and manner that minimizes inconvenience to you. 5. FORCE MAJEURE If Sunnova is unable to perform all or some of its obligations under this Limited Warranty because of a Force Majeure Event, Sunnova will be excused from whatever performance is affected by the Force Majeure Event. provided that: a. Sunnova, as soon as is reasonably practical, gives you notice describing the Force Majeure Event; b. Sunnova's suspension of its obligations is of no greater scope and of no longer duration than is required by the Force Majeure Event(i.e., when a Force Majeure Event is over. we will make repairs); and c. No Sunnova obligation that arose before the Force Majeure Event that could and should have been fully performed before such Force Majeure Event is excused as a result of such Force Majeure Event. "Force Majeure Event" means any event, condition or circumstance beyond the control of and not caused by Sunnova's fault or negligence. It shall include, without limitation, failure or interruption of the production. delivery or acceptance of power due to: an act of god; war(declared or undeclared): sabotage; riot: insurrection; civil unrest or disturbance; military or guerilla action;terrorism: economic sanction or embargo; civil strike, work stoppage, slow-down, or lock-out; explosion; fire; earthquake; pandemic; abnormal weather condition or actions of the elements: hurricane; flood; lightning; wind: drought; the binding order of any governmental authority(provided that such order has been resisted in good faith by all reasonable legal means); the failure to act on the part of any governmental authority(provided that such action has 20 East Greenway Plaza Ste 475,Houston,TX 77046 Date 3/29/2023 281.985.9900 www.sunnova.com Contract ID:V1005701027 ©2021 Sunnova Energy International,Inc.All Rights Reserved. 3 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 Su n n t V a Sunnova Home Solar Service Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing been timely requested and diligently pursued); unavailability of power from the utility grid, equipment, supplies or products(but not to the extent that any such availability of any of the foregoing results from Sunnova's failure to have exercised reasonable diligence); power or voltage surge caused by someone other than Sunnova including a grid supply voltage outside of the standard range specified by your utility; and failure of equipment not utilized by Sunnova or under its control. Where not excused, performance times under this Limited Warranty may be considered extended for a period of time equivalent to the time lost due to such conditions. In certain circumstances, when the System will need to be repaired. but access is limited due to a Force Majeure Event, the obligations under the Limited Warranty and the Agreement may be suspended, in Sunnova's sole discretion; during the duration of the Force Majeure Event and then the term of the PPA will be extended for a period of time equivalent to the time lost due to such Force Majeure conditions. 6. LIMITATIONS ON LIABILITY a. No Consequential Damages IN NO EVENT SHALL SUNNOVA OR ITS AGENTS OR CONTRACTORS BE LIABLE TO YOU OR YOUR ASSIGNS FOR SPECIAL, INDIRECT; PUNITIVE, EXEMPLARY, INCIDENTAL OR CONSEQUENTIAL DAMAGES OF ANY NATURE. SOME STATES DO NOT ALLOW THE EXCLUSION OR LIMITATION OF INCIDENTAL OR CONSEQUENTIAL DAMAGES, SO THE ABOVE LIMITATION MAY NOT APPLY TO YOU. b. Limitation of Duration of Implied Warranties IN THE EVENT THAT ANY IMPLIED WARRANTIES. INCLUDING THE IMPLIED WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE AND MERCHANTABILITY ARISING UNDER STATE LAW THAT CANNOT BE WAIVED, SUCH WARRANTIES SHALL IN NO EVENT EXTEND PAST THE EXPIRATION OF ANY WARRANTY PERIOD IN THIS LIMITED WARRANTY. SOME STATES DO NOT ALLOW LIMITATIONS ON HOW LONG AN IMPLIED WARRANTY LASTS, SO THE ABOVE LIMITATION MAY NOT APPLY TO YOU. c. Limit of Liability Notwithstanding any other provision of this Limited Warranty to the contrary., Sunnova's total liability arising out of or relating to this Limited Warranty shall in no event: (i) For System Replacement: the original cost of the System; and (ii) For damages to your Home, Belongings and Property: exceed five hundred thousand dollars ($500,000). 7. NOTICES All notices under this Limited Warranty shall be made in the same manner as set forth in the Power Purchase Agreement to the addresses listed below: TO SUNNOVA: Sunnova Energy Corporation P.O. Box 56229 Houston: TX 77256-6229 Attention: Warranty Claims Telephone: 281.985.9900 Facsimile: 281.985.9907 Email: customerservice@sunnova.com TO YOU:At the billing address in the Power Purchase Agreement or any subsequent billing address you give us. 8. ASSIGNMENT AND TRANSFER OF THIS LIMITED WARRANTY Sunnova may assign its rights or obligations under this Limited Warranty to a third party without your consent, provided that any assignment of Sunnova's obligations under this Limited Warranty shall be to a party professionally and financially qualified to perform such obligation. This Limited Warranty protects only the person who hosts the System. Your rights and obligations under this Limited Warranty will be automatically transferred to any person who purchases the System from you or to whom you properly transfer the Power Purchase Agreement in accordance with the terms and 20 East Greenway Plaza Ste 475,Houston,TX 77046 Date 3/29/2023 281.985.9900 www.sunnova.com ©2021 Sunnova Energy International, Inc.All Rights Reserved. 4 Contract ID:VI005701027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 SU n n V a Sun nova Home Solar Service Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing conditions contained in the PPA.This Limited Warranty contains the parties' entire agreement regarding the limited warranty of the System. 20 East Greenway Plaza Ste 475,Houston,TX 77046 Date:3/29/2023 281.985.9900 www.sunnova.com Contract ID:VI005701027 ©2021 Sunnova Energy International,Inc.All Rights Reserved. 5 ' DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 Su n n f4-"wa Sun nova Home Solar Service �., Easy Plan TM Power Purchase Agreement (PPA) Balanced Billing STATE SPECIFIC EXCEPTIONS. TERMS AND CONDITIONS The following provisions are hereby agreed to by Sunnova and you Registration:All home improvement contractors and subcontractors shall be registered. Any inquiries about a contractor or subcontractor relating to a registration should be directed to: Office of Consumer Affairs and Business Regulation Ten Park Plaza, Suite 5170 Boston, MA 02116 Phone: (617) 973-8700 Permits: Contractor shall obtain any and all necessary construction-related permits. Owners who secure their own construction-related permits or deal with unregistered contractors shall be excluded from access to the Guarantee Fund. Arbitration: The signatures of the parties to the arbitration provision apply only to the agreement of the parties to alternate dispute resolution initiated by the contractor. The owner may initiate alternative dispute resolution even where the arbitration section is not signed separately by the parties. 20 East Greenway Plaza Ste 475,Houston,TX 77046 Date:3/29/2023 281.985.9900 www.sunnova.com ©2018 Sunnova Energy Corporation.All Rights Reserved. 1 Contract ID:VI005701027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 SOLAR PPA DISCLOSURE This disclosure is designed to help you understand the terms and costs of your purchasing power from a solar electric system ("System"). It is not a substitute for the power purchase agreement("PPA")and other documents associated with this transaction. All information presented below is subject to the terms of your PPA. Read all documents carefully so you fully understand the transaction. For more information on being a smart solar consumer please visit www.seia.orq/consumers. PROVIDER: INSTALLER: WARRANTY/MAINTENANCE Sunnova Energy Corporation Trinity Solar PROVIDER: 20 E.Greenway Plaza,Ste 475 2211 Allenwood Road (Same as Provider) Houston,TX 77046 - Wall Address: Tel.: 281-985-9900 NJ License#(if applicable): 7719 Tel.: Sunnova MA 184093 Tel:(732)780-3779 License#(if applicable): Email:customerservice@sunnova.com Email:sales.ops@trinity-solar.com Email: License: CA: 1072590;CT:0635520;ELC.0195559-E1 I DE: 2066600876;11-0005929 I FL:CVC57148 I MA: 170355; 21233A I MD: 132333; 11834 1 0491C I NH:0491C I NJ: 13VH01244300;Electrical Business Permit#34EB01547400 NY:52821-H;H.2409780100;L004203 I PA:PA128551 I RI: 39372; AC005040 SALESPERSON: Mark McCormack HIS#: Trinity Solar Tel:(781)392-7659 Email:mark.mccormack@trinity-solar.com CUSTOMER: THOMAS NEHMER Customer ID: VI005701027 System Installation Address: 31 TAFT RD,WEST YARMOUTH,MA,02673,United States Customer Mailing Address:31 TAFT RD,WEST YARMOUTH,MA,02673,United States Email: tnttt@verizon.net Contract Date: March 29, 2023 I 11:13 MDT *NOTE:YOU ARE ENTERING INTO AN AGREEMENT TO PURCHASE POWER,NOT TO PURCHASE THE SYSTEM. YOU WILL NOT OWN THE SYSTEM INSTALLED ON YOUR PROPERTY. Electricity Rate&Term(A) Amount Due Up-Front(B) Other Possible Charges(C) ❑Your rate per kilowatt-hour(kWh)for the Amount you owe at PPA signing: Other charges you may have to power produced:$$0.199 Your monthly $0.00 pay under your PPA: payments will be the amount of energy the Late Charge: System produces times the above rate. Amount you owe at the commencement of installation: If a payment is more than 20 days ®You have a fixed monthly payment PPA. $0_00 late,payments accrue interest at Your monthly payment during the first year of 1%per month OR 12%annually the PPA:$68.25(includes ACH discount) Amount you owe provider at the completion of not to exceed the maximum Your estimated first year production: installation(without deducting any upfront or down allowable by law. 4,115.67 kWh payment):$27,564.67(payable in monthly payments). . DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 Estimated System Removal The initial term of your PPA: Fee: ®25.00 Years At homeowner's expense if ®300 Months Down payment you owe the Provider: required within the Initial Term. $0.00 Removal cost TBD upon removal Incentives included in your rate per kilowatt- request. hour(kWh)or monthly fixed fee: Upfront Payment you owe the Provider: UCC Notice Removal and Re- $0.00 filing Fee: ®None If you refinance your mortgage, ❑ you may have to pay for fees charged to us by the local See Box F:"PPA Payment Escalator"for jurisdiction and processing fees. factors that may affect the amount of your rate Returned Checks: per kWh and therefore your future monthly If any check is returned or refused payments. by your bank,you may be charged:$25.00(or a lower amount if required by law) Non-Connection to Internet: If you do not maintain a high- speed intemet connection,you will be charged a monthly fee of$0.00 and/or your monthly payment may be based upon estimates. Automatic Bank Withdrawals (ACH): 10%per month discount if you pay your PPA using automatic bank withdrawals. Number of Monthly Payments(D) When Payments Are Due(E) PPA Payment Escalator(F) Number of monthly payments:300 Your first Monthly Payment(which includes sales tax,if Your PPA MAY or MAY NOT have applicable and ACH discount)of$68.25 is due on the first a payment escalator. If your PPA Payment Date. During contract validation,you will choose one of HAS a payment escalator,your the available payment date options for your Payment Date.After PPA payment will INCREASE your first Monthly Payment,299 additional Monthly Payments will ANNUALLY by 2.90 be due on the same day of each following month. Please refer to Schedule A for the amounts of these payments. Provider will provide you with: ®Electronic Invoices(sent to your email address above) ❑Paper Invoices(sent to your U.S.mail address above Site&Design Assumptions for your PPA(G) • Estimated size of System in kilowatts:3.240(kW) • Estimated gross annual electricity production in kilowatt-hours(kWh)from your PPA:4,115.67 • Estimated annual system production decrease due to natural aging of system: 0.50% • Estimated System electricity production for the entire initial term of your PPA:96,948.48(kWh) • System location:31 TAFT RD,WEST YARMOUTH,MA,02673,United States • Connectivity:The solar system®WILL❑WILL NOT be connected to the electric grid. • At the time of installation,your local utility ®DOES ❑DOES NOT credit you for excess energy your System generates.The rules a..I in•to such credit are set b our'urisdiction. Security Filings(H) Provider❑WILL SWILL NOT take a security interest in your real property by terms of the PPA(e.g.a lien on your home) DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601 C9BA1 E3 Provider ®WILL❑WILL NOT file a fixture filing or a UCC-1 on the system(a public filing informing others that Provider owns the system,but does not.ut a lien on the home Repair&Maintenance(I) "System maintenance"refers to the upkeep and services required or recommended to keep your System in proper operation.System maintenance®IS n IS NOT included for 25 years by Provider(e.g.,Installer, Maintenance Provider).You are required to perform the following system maintenance:Keep modules and panels clean and maintain level of shading in existence at time of installation See Agreement&5 "System repairs"refers to actions needed to fix your System if it is malfunctioning.System repairs®ARE n ARE NOT provided by the Provider(e.g. Installer,Other). Please review your PPA and Limited Warranty for additional information about any warranties on the System installation and equipment.Certain exclusions ma ap i l .Note that es uipment warranties for hardware are not re.uired to include labor/workmanship. Roof Warranty(J) Your roof® IS❑IS NOT warranted against leaks from the System installation for 10 years. Your roof® IS ❑ IS NOT warranted against leaks caused by removal of the System for a period of 1 year(s)following system removal. Any portions of your roof impacted by the System ®WILL ❑WILL NOT be substantially returned to their original condition following the removal of the S stem ordina wear and tear exce.ted . Transferring Your PPA and Selling Your Home(K) If you sell your home,you ® MAY❑ MAY NOT transfer the PPA to the purchaser(s)of your home. If you may transfer the PPA,the transfer will be subject to the following conditions: ®Credit check on the purchaser(s)(unless you paid in full upfront) ® Minimum FICO score requirement: 650(unless you paid in full upfront) ❑Transfer fee of$ ®Assumption of PPA by purchaser(s) ❑ Other If you sell your home,you ®ARE❑ARE NOT permitted to move the solar system to a new home. You ma also have the options to purchase the s stem or prepa some or all of the balance as part of a transfer. Transfer of Obligations by Provider(L) The PPA may be assigned,sold or transferred by Provider without your consent to a third-party that will be bound to all the terms of the PPA. If such a transfer occurs,you will be notified if this will change the address or phone number to use for PPA questions,payments,maintenance or service requests. Performance or Production Guarantee(M) In terms of your full System,Provider is providing you with a: System Performance or electricity production guarantee ❑Other type of System guarantee ❑No System guarantees You ma have additional .uarantees or warranties in addition to those that cover the entire S stem. Taxes(N) You are responsible for property taxes on property you own.Consult a tax professional to understand any tax liability that may result from enterin.the PPA. Utility and Electricity Usage/Savings Assumptions(0) You ® HAVE❑HAVE NOT been provided with a savings estimate based on your PPA. Provider❑IS ® IS NOT guaranteeing these savings. Provider®IS ❑ IS NOT using savings calculations that conform to the SEIA Solar Business Code.See Box Q or www.seia.org;code. Your Estimate was calculated based on: ❑Your estimated prior electricity use ®Your actual prior electricity use ❑Your estimated future electricity use Your Estimate assumes the following: ❑Years of electrici •roduction from our PPA: DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 ®A current estimated utility electricity rate of$0.411 [cost per kilowatt-hour]during the first year of the PPA with estimated utility rate increases of 2.9%annually.Provider based these estimates on the following source(s):Installer/Customer ❑An electricity rate from your PPA of [cost per kilowatt-hour]during the first year of the PPA with estimated increases of percent annually. NOTE: It is important to understand that future utility electricity rates are estimates only.Your actual current and future utility rates and utility rate increases may vary. Historical data are not necessarily representative of future results.For further information regarding rates,you may contact your local utility or the public regulation commission.Tax and other state and federal incentives are subject to change or termination by executive, legislative or re•ulato action,which ma imgact savings estimates.Please read our PPA careful) for more details. Renewable Energy Certificates(RECs)(P) Any renewable energy certificates or credits(RECs)from producing renewable solar energy with the System ® WILL❑ WILL NOT be assigned to the Provider.If Provider is assigned the RECs,you will not own the RECs to sell,use or claim them,and Provider may sell the RECs to a third part . Cooling Off Period/Right to Cancel(Q) In addition to any rights you have under state or local law,you ®HAVE❑ DO NOT HAVE the right to terminate the Contract without penalty no less than three business days from the date of this transaction by notifying Provider in writing at the above address.Consult your agreement for specific terms. SEIA Solar Business Code(R) Provider®DOES❑DOES NOT abide by and agree to be bound by SEIA's Solar Business Code and its complaint resolution process. For more information about the SEIA Solar Business Code and complaint resolution process,please visit www.seia.org/consumers or email SEIA at consumer• seia.or.. Additional Disclosures or Terms(S) BY SIGNING BELOW,YOU AGREE THAT YOU HAVE RECEIVED AND REVIEWED DISCLOSURES A-S ABOVE: Homeowner's Na e: t7 5°RIE1IMER Signature. "' t V Date: March 29, 2023 I 11:13 MDT 38D32CBDBA1741D_. Co-Homeowner's Name(if any): Signature: Date: Individual Completing this Form: Name:John Santo Salvo Signature: Cie.. ! '' /2 Title: Authorized Signatory Company: Sunnova Energy Corporation Date: March 29, 2023 I 11:13 MDT DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 sU n n nva Sunnova Home Solar Service Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing ELECTRONIC FUNDS TRANSFER OR CREDIT CARD PAYMENT AUTHORIZATION In this Electronic Funds Transfer or Credit Card Payment Authorization ("Authorization"), "I.""me,""my." ''we"and"our"refer to the Homeowner(s)under the Solar Service or Solar Purchase Agreement("Agreement")signed the same date I sign this Authorization. I may choose the convenience of having my monthly payments under the Agreement made automatically from my Bank Account at my Financial Institution or through recurring charges to my Credit Card Account. This Authorization allows preauthorized payments from my designated Bank Account or Credit Card Account('Account")to Sunnova Energy Corporation or its designees(''You"). By signing this Authorization, I agree to the following terms: 1. AUTHORIZATION As applicable to the type of Account that I designate. I authorize You to: (i) automatically withdraw funds from my deposit Account("Electronic Funds Transfer Payment")through an automated clearing house transfer(electronic debiting of my Account) or by bank draft(remotely created check or"RCC"); or(ii) initiate charges to my credit Account, in order to make my payments to You as required by the Agreement. If the due date falls on a Saturday. Sunday, or holiday, my payment will be deducted on the next business day following the due date, and You will credit my payment as if it had been received on the due date. If I designate a deposit Account, I agree to keep sufficient available funds in the Account on the due date so that the payment can be made in the required amount and to cover all payment to You under the Agreement. If there are insufficient funds in my deposit Account, You may initiate a second debit to my Account or attempt a second presentment of a remotely created check. You will not attempt to debit my deposit Account or present a remotely created check drawn on my Account more than twice for any single payment due. If any of this information changes, I will immediately notify Sunnova at customerservice@sunnova.com or by calling us at 1-855-277-6379. If Sunnova incurs any fees as a result of inaccurate or out of date information, Sunnova will bill me for those charges. 2. REJECTED PAYMENTS My failure to keep sufficient funds in my deposit Account or a rejected charge to my credit Account will be an event of default under this Authorization and You will have the right to terminate this Authorization. I will be responsible for any payments that do not clear as well as any dishonored check fees. including those that may be discovered after the Agreement is apparently paid off, paid in full or otherwise. 3. BANK FEES I agree to be bound by any rules my bank requires for pre-authorized electronic funds transfers and/or credit card transactions and understand that I will be responsible for any fees my financial institution may charge for these electronic payments. 4. EARLY PAYMENT If I make a full monthly payment two business days before the scheduled transfer date, there will be no automatic payment for that month. I agree that the termination of this Authorization shall not prevent a debit or credit transaction authorized before any notice of termination and does not terminate the Agreement or my obligation to make payments as required by the Agreement. 5. RIGHTS REGARDING VARYING AMOUNTS I acknowledge and understand that You reserve the right to change these conditions at any time. Notice may be provided on or with my bill or by other methods. I have the right to receive notice of all Electronic Funds Transfer Payments that vary from a preauthorized amount, or from the previous Electronic Funds Transfer Payment amount. 6. PROCEDURES UPON PAYMENT IN FULL I understand that when my Agreement is paid off and You send notice to my Bank to cease making Electronic Funds Transfer Payments or initiating charges to my credit Account, as applicable, occasionally a bank fails to stop such payments in a timely manner. If this occurs, or if an overpayment is otherwise made, You will refund to me the amount exceeding any amount due as soon as reasonably possible upon discovery of the overpayment, and I agree that this is a reasonable procedure. If there is a balance remaining after the scheduled final due date of the Agreement, I authorize You to continue to debit and/or initiate charges to my Account in the amount of the minimum payment required under the Agreement at regular intervals until the unpaid balance is paid. Although You are authorized to continue these payments. You are under no obligation to do so. 20 East Greenway Plaza Ste 475.Houston,TX 77046 Date:3/29/2023 281.985.9900 www.sunnova.corn 2021 Sunnova Energy International, Inc All Rights Reserved. 1 Contract ID:VI005701027 DocuSign Envelope ID:88C4088C-2F26-4B8C-AC64-EF601C9BA1E3 SU n n nva Sunnova Home Solar Service Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing BY SIGNING THIS DOCUMENT, I ACKNOWLEDGE THAT I HAVE READ THE TERMS AND CONDITIONS OF THIS AUTHORIZATION ABOVE AND AGREE TO BE BOUND BY ITS TERMS. I ACKNOWLEDGE THAT I HAVE RECEIVED A COPY OF THIS AUTHORIZATION. I REPRESENT THAT ALL PERSONS WHOSE SIGNATURES ARE REQUIRED TO WITHDRAW FUNDS FROM OR INITIATE CHARGES TO THE ACCOUNT I HAVE DESIGNATED HAVE EXECUTED OR OTHERWISE AUTHORIZED THIS AUTHORIZATION. I UNDERSTAND THAT I WILL RECEIVE A SEPARATE REQUEST TO SECURELY PROVIDE MY DESIGNATED BANK OR CREDIT CARD ACCOUNT INFORMATION. Homeowner' R,JOOMAS NEHMER Signature: Date I�LUMtV Date March 29, 2023 I 11:13 MDT 38D32CBDBA1741 D. Co-Homeowner's Name (if any): Signature: Date 20 East Greenway Plaza Ste 475,Houston,TX 77046 Date:3/29/2023 281.985.9900 www.sunnova.com ©2021 Sunnova Energy International, Inc.All Rights Reserved. 2 Contract ID VI005701027