HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. 3 0 Lot_l_na Zone of Contribution: In_ Out 'Acreage
� Commercial: Residential:
Village: `T�:/tL4 c -�_�-�
Street:
Floor Plan: 1-/--- a Bedrooms: 3
Owner:
Address: Installer: //, L'3 1--Q w w
Phone: Phone: D .1
Builder: Engineer: O
Address: ,,)
Phone: Phone:
I. Required#of copies received N/A YES NO
2. Date of soils exam and percolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material, above water table %
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: „i ---
5. Water line 10 ft from septic components Var.: I ,i -
6. Benchmark indicated and shown-NGVD if near wetlands I
7. Septic tank minimum 1 from foundation. Var.: '�r// I
8. Leaching minimu 0 , 15 ft craw 10 ft slab Var.+ N
MI
ArAlk
9. Leaching minimum ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.:
1 12. System meets all other setback requirements Var.: I
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil (A,B horizons)or 5' removal
16. Proposed contours are suitable /
17. System meets slope requirements-min. 1/8", '/"preferred
18. System meets breakout requirements PVC Iiner: Wall:19. Specified tee sizes are proper, gas baffle on outlet tee /
20. Sewage is under 10,000 gpd for parcel <,/'-
21. No garbage disposal
22. System adeguately sized for its intended use I /
23.Minimum 6"stone or compacted below tank and dbox
24. Manhole covers within 6"of grade, pump chamber cover to grade
25. Inspection port on plastic chambers/leach field
1 26. Electrical permit for pump chamber/Separate meter for duplexes 1
27.Pump system-2"line,weep hole,check valve, tee in dbox, pump size
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking ,/--30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils:
wall
: com
mercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic, groundwater I
34.Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd d
37. Check area lots for groundwater/Label groundwater in Assessor's Map
I
Plan reviewed by: