Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot Zone of Contribution: In Out Acreage Commercial: Residential: Street: 33 ' c 1 ' icicz. AL)e --- Village: Floor Plan: Bedrooms: 3 Owner: Installer: .• Address: #. 6 it CoN rt,-Cciti ada Phone: Phone: Builder: Engineer: 1S ' C Address: Cr v C>'" Phone: ._____p_ Phone: 1. Required#of copies received N/A YES NO_ 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table 4. Foundation 2 ft above highpoint of road g H.P.: Fnd: Var.: ----- 5. Water line 10 ft from septic components Var.: I 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: �if l 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: / I 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: 1 12. System meets all other setback requirements Var.: '-, 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above ad.. water or bottom of test hole Var.: 15. System not in top or subsoil (A,B horizons)or 5' removal 16. Proposed contours are suitable • 17. System meets slope requirements-min. 1/8", '4"preferred .,,<1 18. System meets breakout requirements PVC liner: Wall: 1 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21. No garbage disposal / 22. System adequately sized for its intended use 23. Minimum 6"stone or compacted below tank and dbox L-----24. Manhole covers within 6"of grade, pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes ./ 27.Pumpsystem-2" line,weep hole,check valve, tee in dbox, pump size l 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking .-----30. Buoyancy calculations for tank/pump chamber inspect and certify7.31. Engineer to soils: wall: commercial: I ,/ 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ‹ 33.H-20 loading is subject to vehicular traffic,groundwater 34.Title V Application and permit fee, installer signature 35. Foundatian footing min. 2 feet above adjusted ground water for new use. ihr . • 36. Deed Restriction required max. #bedrooms: max. floe.. 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: