HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Lot Zone of Contribution: In Out Acreage
Commercial: Residential:
Street: 33 ' c 1 ' icicz. AL)e ---
Village: Floor Plan: Bedrooms: 3
Owner: Installer: .•
Address: #. 6 it CoN rt,-Cciti ada
Phone: Phone:
Builder: Engineer: 1S ' C
Address: Cr v C>'"
Phone: ._____p_
Phone:
1. Required#of copies received N/A YES NO_
2. Date of soils exam and percolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material, above water table
4. Foundation 2 ft above highpoint of road
g H.P.: Fnd: Var.: -----
5. Water line 10 ft from septic components Var.: I 6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
�if l
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.: / I
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.:
1 12. System meets all other setback requirements Var.: '-,
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above ad.. water or bottom of test hole Var.:
15. System not in top or subsoil (A,B horizons)or 5' removal
16. Proposed contours are suitable •
17. System meets slope requirements-min. 1/8", '4"preferred
.,,<1
18. System meets breakout requirements PVC liner: Wall: 1
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21. No garbage disposal /
22. System adequately sized for its intended use
23. Minimum 6"stone or compacted below tank and dbox L-----24. Manhole covers within 6"of grade, pump chamber cover to grade
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes ./
27.Pumpsystem-2"
line,weep hole,check valve, tee in dbox, pump size l
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking
.-----30. Buoyancy calculations for tank/pump chamber
inspect and certify7.31. Engineer to
soils: wall: commercial: I ,/
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ‹
33.H-20 loading is subject to vehicular traffic,groundwater
34.Title V Application and permit fee, installer signature
35. Foundatian footing min. 2 feet above adjusted ground water for new use. ihr . •
36. Deed Restriction required max. #bedrooms: max. floe..
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: