HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M.{� Lotp2� Zone of Contribution: In_ Out Acreage 1 0
Street:
/ Jive ��n J� Commercial: Residential: �-
Village: Floor Plan: v #
Bedrooms:
O
wners: Installer:
Addres
rni
Phone:
Phone: ""�
Builder: Engineer: ,
Address: Phone: `�
Phone:
N/A YES NO 1. Required#of copies received
2. Date of soils exam and percolation test not older than 2 years -"
3. 4-5 ft of naturally occurring pervious material, above water table -
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: ..-----
5. Water line 10 ft from septic components Var.: ( -
6. Benchmark indicated and shown-NGVD if near wetlands ,-----
7. Septic tank minimum 10 ft from foundation, deck Var.: 1 I ----"- -
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.: /�
12. System meets all other setback requirements Var.: ..., !
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil (A,B horizons)or 5' removal /'-'
16. Proposed contours are suitable J
17. System meets slope requirements- min. 1/8", ''A"preferred f
18. System meets breakout requirements PVC Iiner: Wall: I 7
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel /
21. No garbage disposal /
22. System adequately sized for its intended use 7
23.Minimum 6"stone or compacted below tank and dbox I
24. Manhole covers within 6"of grade, pump chamber cover to grade
25. Inspection port on plastic chambers/leach field 1"
26. Electrical permit for pump chamber/Separate meter for duplexes /
27. Pump system-2"line,weep hole,check valve, tee in dbox, pump size "/
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking ,"
30.Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ! /
33.H-20 loading is subject to vehicular traffic,groundwater
34.Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house -
36. Deed Restriction required max. #bedrooms: max. flow: gpd /
37. Check area lots for groundwater/Label groundwater in Assessor's Map I
Plan reviewed by: _ (mot_
_ co,o;