Loading...
HomeMy WebLinkAbout453 Station Ave CVS plan 2Q CN O N O N 00 co CVS SPECIAL PROJECTS RESPONSIBILITY SCHEDULE I I 1 1 5/19/22 Z 0 O (A U DESCRIPTION CVS GC SHOP DRWGS REQ'D? COMMENTS p U) z p W C 0 Z (n p LE m > U m p ¢ Z 0 p z W > > } Q J ¢ Z W CO z LL U U m p ¢ Z U 0 � ¢ z 0 CONDITIONS OF THE CONTRACT 00.00.00 Procurement and Contracting Requirements X 00.20.00 Instructions for Procurement X 00.21.13 Instructions to Bidders X 00.40.00 Procurement Forms and Supplements X X 00.41.00 Bid Form X 00.43.23 Alternates Form X 00.60.00 Project Forms X X 00.70.00 Conditions of the Contract X X 00.90.00 Revisions, Clarifications and Modifications X X 1 GENERAL REQUIREMENTS 01.00.00 General Requirements X X 01.00.00 Permits and Fees X X GC to pickup permit and pay all permit fees. 01.20.00 Price and Payment Procedures X X 01.50.00 Temporary Facilities and Controls X X 01.00.00 Storage Trailer(s)-A X X Store Set -Up Team responsible for combined program projects. 01.00.00 Storage Trailer(s)-B X X GC responsible for all stand alone projects. 01.00.00 Dumpster (During Construction) X X GC to confirm location(s) with SPM. 01.70.00 Execution and Closeout Requirements X X 2 SITEWORK 02.00.00 Existing Conditions X X 02.20.00 Assessment X X 02.40.00 Demolition and Structure Moving X X 02.50.00 Site Remediation X X 02.70.00 Water Remediation X X 3 CONCRETE 03.00.00 Concrete X X 03.10.00 Concrete Forming and Accessories X X 03.60.00 Grouting X X 03.80.00 Concrete Cutting and Boring X I X I GC to supply and install patching and self -leveling underlayment. 5 METALS 05.00.00 Metals X X 05.10.00 Structural Metal Framing X X 05.20.00 Metal Joists X X 05.30.00 Metal Decking X Use when HVAC / RTU replacement is part of project scope. 05.60.00 Metal Fabrications X X 6 WOOD AND PLASTICS 06.00.00 Wood, Plastics, Composites X X 06.00.00 Wood, Plastics, Composites X X End Panels, Cornerbox and (Chrome) Cart Corrals provided by idX Corporation. 06.10.00 Rough Carpentry X X 06.20.00 Finish Carpentry I I X X Refer to Construction Plan. 06.40.00 jArchitectural Millwork X I X Chair Rail in Pharmacy Waiting Area, MinuteClinic. 06.60.00 1Plastic Fabrications X X FRP Panels. 7 THERMAL AND MOISTURE PROTECTION 07.00.00 Thermal and Moisture Protection X X Refer to Construction Plan. 07.10.00 Damp proofing and Waterproofing X X Refer to Construction Plana 8 OPENINGS 08.00.00 Openings X X 08.10.00 Metal Doors & Frames X X Contact CVS Vendor; refer to Door Schedule. 08.20.00 Doors & Frames X X Contact CVS Vendor; refer to Door Schedule. 08.30.00 Specialty Doors & Frames X X Contact CVS Vendor; refer to Door Schedule. 08.33.23 Overhead Coiling Doors X X I Contact CVS Vendor; refer to Door Schedule. 08.33.26 Overhead Coiling Grille X X Contact CVS Vendor; refer to Door Schedule. 08.40.00 Entrances, Storefronts and Curtain Walls X X X Contact CVS Vendor; refer to Door Schedule. 08.43.33 ISwinging / Folding Doors X X I Contact CVS Vendor; refer to Door Schedule. 08.50.00 Windows X X Contact CVS Vendor. 08.70.00 Hardware X X Contact CVS Vendor; refer to Hardware Schedule. 08.71.00 Thresholds X X Contact CVS Vendor; refer to Hardware Schedule. 08.80.00 Glazing X X 08.90.00 Glazed Curtain Wall X X 9 FINISHES 09.00.00 Finishes X X Refer to Finish Schedule. 09.20.00 Plaster and Gypsum Board X X Refer to Partition Types. 09.30.00 Tiling X X Includes Porcelain Tile. Refer to Finish Schedule. 09.51.00 Acoustical Ceiling Tile & Grid X X Refer to Finish Schedule. 09.65.00 Luxury Vinyl Tile Flooring X X Refer to Finish Schedule. Refer to CVS National Account. 09.68.13 Modular Carpet -Sales Floor X X Refer to Finish Schedule. 09.68.13 Modular Carpet -Pharmacy X X Refer to Finish Schedule. 09.68.13 Modular Carpet -Vestibule X X Refer to Finish Schedule. 09.70.00 lWall Finishes -Decorative Wall Covering X X Refer to Finish Schedule. 09.70.00 Wall Finishes -Low Wall Decorative Wall Covering X X Refer to Finish Schedule. 09.70.00 Wall Finishes-FRP X X Refer to Finish Schedule. 09.90.00 Paint X X Refer to Finish Schedule. 10 SPECIALTIES 10.00.00 Specialties 10.20.00 Interior Specialties 10.50.00 Storage Specialties 10.70.00 Exterior Specialties 10.70.00 Signs -Exterior X X X Refer to Exterior Sign Shop Drawings. 10.70.00 Signs -Interior X X 10.70.00 Window Graphics X X X I Refer to Window Graphic Shop Drawings. 11 EQUIPMENT 11.00.00 Equipment X X Refer to Enlarged Plans Fixture Schedule per specific program. 11.02.00 Safe(s) X X Refer to Enlarged Plans Fixture Schedule for Pharmacy. 11.16.00 Loading Dock Equipment X X 11.70.00 Refrigerator(s) X X Refer to Enlarged Plans Fixture Schedule for Pharmacy. 11.70.00 Freezer X X Refer to Enlarged Plans Fixture Schedule for Pharmacy. 11.70.00 Microwave X X Refer to Enlarged Plans Fixture Schedule for Pharmacy. 11.70.00 Wire Script Waiting Baskets, Clips, Fasteners X X Refer to Enlarged Plans Fixture Schedule for Pharmacy. 11.72.00 Waste Compactor X X 11.80.00 Dumpster X X 11.80.00 Dumpster Enclosure - X X X 11.80.00 lWaste Compactor Enclosure X X 11.80.00 Collection & Disposal Equipment X X 12 FURNISHINGS 12.00.00 Fork Lift X X X Devloper GC to off-load retail fixtures and provide the driver and fork lift on both MID and MSD. This should be included in the Developer GC bid. 12.00.00 Wall Strapping X X X Developer GC to provide wall strapping along perimeter walls per CVS merchandise plan. 12.00.00 Furnishings X X Refer to Enlarged Plans Fixture Schedule per specific program. 12.20.00 Roller Window Shades X X Roll -A -Shade Fixture. GC to prepare electrical and coordinate shade installation with vendor. 12.30.00 Fixtures, Storage Bays X X X Refer to Enlarged Plans Fixture Schedule per specific program. 12.30.00 Steel Gondolas X X Refer to Enlarged Plans Fixture Schedule per specific program. 12.40.00 Furnishings & Accessories X X Refer to Enlarged Plans Fixture Schedule per specific program. CVS 12.49.00 Window Treatment X X Shades, Solar Control Film. 5/19/22 p Q DESCRIPTION CVS GC SHOP DRWGS REQ'D? COMMENTS o J cn _z 1 p W d a � 0 zO U m pW =p W¢ � U m L 0 p z W > U m J In W XZO u-LD (D m ¢Uj U (D m W J 14 CONVEYING SYSTEMS 14.10.00 Dumbwaiters X X 14.20.00 Elevators X X 21 14.40.00 Lifts X X 14.55.00 Conveyor X X FIRE SUPPRESSION 21.00.00 Fire and Smoke Protection X X 21.10.00 Water -Based Fire Suppression Systems X X X Sprinkler Shop Drawings as required for Permit submission. 21.10.00 Fire Alarm X X 22 121.20.00 Fire Extinguishers, Cabinets and Accessories X X 21.20.00 Fire Extinguishing Systems X X PLUMBING 22.00.00 Plumbing X X Refer to Plumbing Drawings. 22.10.00 Plumbing Piping X X Refer to Plumbing Drawings. 22.30.00 Plumbing Equipment X X Refer to Plumbing Drawings. 23 22.40.00 1PIumbing Fixtures X X Refer to Plumbing Drawings. 22.40.00 1 Fillm aster Systems X X Refer to Plumbing Drawings. HEATING, VENTILATING AND AIR CONDITIONING (HVAC) 23.00.00 Heating, Ventilating and Air Conditioning X X Refer to Mechanical Drawings. 23.20.00 HVAC Piping and Pumps X X Refer to Mechanical Drawings. 23.30.00 HVAC Air Distribution X X Refer to Mechanical Drawings. 23.40.00 HVAC Air Cleaning Devices X X Refer to Mechanical Drawings. 26 23.50.00 lCentrall Heating Equipment X X Refer to Mechanical Drawings, 23.60.00 ICentral Cooling Equipment I X I X Refer to Mechanical Drawings. ELECTRICAL 26.00.00 Electrical X X Refer to Electrical Drawings. 26.00.00 Electrical Devices and Cover Plates X X Refer to Electrical Drawings. 26.20.00 Low Voltage Electrical Transmissions X X X Includes IT. Refer to Low Voltage Shop Drawings. 26.50.00 Lighting X X Refer to Electrical Drawings. 26.50.00 Lighting Switches X X Refer to Electrical Drawings. 26.60.00 1 Emergency Lighting X X Refer to Electrical Drawings. 27 1COMMUNICATIONS 27.00.00 Communications X X Refer to Supplier Reference Guide or Cabeling Guide for CVS-Approved Low -Volt Installers. 27.00.01 Low -Voltage Equipment (BOH): IS Rack X X Refer to Supplier Reference Guide or Cabeling Guide for CVS-Approved Low -Volt Installers. 27.00.02 Low -Voltage Equipment (Front Checkout): ATM's, Automated Checkout Systems (ACO's), MoneyGram, Coupon Center ExtraCare, Lottery Machines X X Refer to Supplier Reference Guide or Cabeling Guide for CVS-Approved Low -Volt Installers. 27.00.03 Low -Voltage Equipment (Photolab): Photo Equipment X X Refer to Supplier Reference Guide or Cabeling Guide for CVS-Approved Low -Volt Installers. 27.20.00 Data & POS Communications X X Includes, Registers, Pharmacy Computer Systems, Fax Machines and Printers. Refer to Supplier Reference Guide or Cabeling Guide for CVS-Approved Low -Volt Installers. 27.30.00 Voice Communications X X Includes Telephones. Refer to Supplier Reference Guide or Cabeling Guide for CVS- Approved Low -Volt Installers. 27.50.00 Distributed Communications & Monitoring Systems X X Refer to Supplier Reference Guide or Cabeling Guide for CVS-Approved Low -Volt Installers. 28 ELECTRONIC SAFETY AND SECURITY 28.00.00 Electronic Safety& Security X X 28.30.00 Electronic Detection & Alarm - All Other Store Security X X X CVS to purchase and install. 28.30.01 Electronic Detection & Alarm - MinuteClinic Alarm Keypad X X X GC responsibility to install low -volt chase with pull -wire. Refer to Electrical Drawings 28.40.00 Electronic Monitoring & Control X X 32 EXTERIOR IMPROVEMENTS 32.00.00 Exterior Improvements X X 32.10.00 Bases, Ballasts, and Paving X X 32.30.00 Site Improvements X X 32.70.00 Wetlands X X 33 32.80.00 Irrigation X X 32.90.00 Planting X X UTILITIES 33.00.00 Utilities X X 33.00.00 Sanitary Sewerage Utilities X X REMODEL SCOPE OF WORK • PERMITS -GC. TO PROVIDE BUILDING DEPT. W/ PERTINENT INFORMATION AS REQUIRED. GC IS RESPONSIBLE TO INCLUDE THE COST FOR THE BUILDING PERMIT IN THE BASE BID. COORDINATE WITH AOR & EXPEDITOR AS NECESSARY. • REPLACE MISC VINYL BASE THROUGHOUT STORE PER SPEC ON PLANS. • STORE PERSONNEL AND/OR STORE SETUP IS RESPONSIBLE FOR ALL MERCHANDISE MOVES INCLUDING FRONT CHECKOUT AND PHARMACY. • G.C. TO INCLUDE COST TO RELOCATING, LEVELING & STRAIGHTENING GONDOLAS/FIXTURES • GC TO SUPPLY STORAGE TRAILERS (ALL CONSTRUCTION MATERIAL TO BE KEPT IN THIS TRAILER, NO ITEMS ARE TO BE LEFT IN THE BACKROOM. GC TO PROVIDE (3) 40' STORAGE CONTAINERS FOR BOTH THE MERCHANDISING TEAM AND CONSTRUCTION • GC IS TO PROVIDE 4 DUMPSTERS FOR SET UP • CVS IS RESPONSIBLE TO ISSUE P.O. FOR ALL LOW VOLTAGE/COMMUNICATION WIRING (EAS, PHONES, & POS), GC IS RESPONSIBLE TO COORDINATE. • CVS IS RESPONSIBLE TO ISSUE P.O. FOR CCTV CAMERA RELOCATION, BURGLAR & FIRE ALARM (GC IS RESPONSIBLE TO COORDINATE) • G.C. IS RESPONSIBLE TO KEEP THE MEANS OF EGRESS AND FIRE EXITS OPEN AND ACCESSIBLE AT ALL TIMES • FULL RETAIL CARPET REPLACEMENT (BY INTERFACE); CARPET IS ORDERED BY THE AOR VIA THE CARPET REPLACEMENT FORM THROUGH THE FACILITY MANAGEMENT REPAIRS & MAINTENANCE, • G.C. RESPONSIBLE .FOR ALL WALL PREP PRIOR TO THE INSTALLATION OF ALL NEW INTERIOR GRAPHICS , GC TO PATCH WALLS SMOOTH AND APPLY TWO COATS OF PAINT. • GC MUST INCLUDE OVERNIGHTS FOR RX WORK --PLAN TWO NIGHTS FOR RX WORK. • GC MUST MEET ALL KEY DATES ON PROJECT MANAGER TIME AND ACTION • GC MUST DOWNLOAD THE LATEST STORE SETUP TIME AND ACTION FOUND ON THE PROJECT IN THE STORE SETUP FOLDER / SHARED. • GC MUST COMPLETE A CONSTRUCTION TIME AND ACTION BASED ON PROJECT MANAGER TIME AND ACTION AND POST THE CONSTRUCTION TIME AND ACTION TO CONSTRUCTION SHARED FOLDER - USING SMART SHEET. • GC MUST DOWNLOAD THE LATEST MERCHANDISE PLAN FOUND ON RESOURCE UNDER THE PROJECT IN THE DRAWING FOLDER LABELED MERCHANDISE PLAN • GC RESPONSIBLE TO OFFLOAD NATIONAL ACCOUNT MATERIAL (MILLWORK, ETC) AND STORE IN CONTAINERS • GC TO CHECK MATERIAL AND REPORT ANY DAMAGED OR MISSING ITEMS TO CPM WITH 24HRS • GC TO DO MOISTURE TESTING IN ALL AREAS OF LVT • GC TO CARRY A FORKLIFT WITH OPERATOR FOR THE FIRST THREE WEEKS OF THE PROJECT • GC TO USE SMART SHEET TO COMPLETE THE CONSTRUCTION PUNCH LIST • WEEK 1--MONDAY ® 7AM; TUE-THUR © 5AM; WEEKS 2 AND 3--5AM; WEEKS 4 AND 5--7AM %VCVS pharmacy" RESET STORE NUMBER 00944 453 STATION AVENUE SOUTH YARMOUTH, MA 02664 CAP CODE; 00072 CS PROJECT NUMB6R 163445 "A STARCK ARCHITECTS 126 Cove Street Fall River, MA 02720 1 Richmond Square, Suite 120C Providence, RI 02903 MA 508.679.5733 R1401.709.7799 STARCKARCHITECTS.COM CONSULTANT ENGINEER: [ CONSULTANT: SEAL pFD ARc 00 �a 951251 o �1 � REVISIONS: DRAWING/REVIEWED BY: PPY/MJT CVS PROJECT MANAGER: SH DATE: 08/08/2022 JOB NUMBER: 163445 TITLE: RESPONSIBILITY MATRIX SHEET NUMBER: G2 COMMENTS: