DIVISION 01 -GENERAL REQUIREMENTS
2.
ALL EQUIPMENT AND MATERIALS SHALL BE NEW UNLESS OTHERWISE NOTED: NEW
MATERIALS
WILL BE PAID FOR PER THE CONTRACT .DOCUMENTS.
NEAR AN EXISTING OCCUPIED BUILDING GIVE ADVANCE NOTICE AND ARRA T
NGE WITH HE
8.
APPLY 3 MIL THICK BITUMINOUS COATING INSIDE OF BOTH. INTERIOR AND EXTERIOR DOOR
GENERAL NOTES:
SHALL BE FREE OF DEFECTS.
5.
CLEAN AREAS TO BE PUT BACK INTO SERVICE DURING THE PHASING SEQUENCES.
OWNER OR PROJECT SITE REPRESENTATIVE TO HAVE ANY POTENTIALLY ENDANGERED SPACES
FRAMES WHICH WILL BE FILLED WITH MORTAR.
1.
CONTRACTOR SHALL REVIEW ALL PERMITTED DOCUMENTS FOR HANDWRITTEN COMMENTS OR
VACATED. NO SUCH LIFTING SHALL BE DONE WITHOUT THEPERMISSION OF THE OWNER OR
OTHER CONDITIONS OF APPROVAL. NOTIFY ARCHITECT IMMEDIATELY OF ANY COMMENTS
3.
BASE EQUIPMENT MANUFACTURER, MODEL, AND CAPACITY OF EQUIPMENT ARE LISTED ON
G. SURVEY/TIE-INS: PRIOR TO SUBMITTING SHOP DRAWINGS OR BEGINNING SHOP FABRICATION
PROJECT SITE REPRESENTATIVE.
9.
INSTALL FINISH HARDWARE AS SPECIFIED HEREIN.
AFFECTING THE PLANS.
THE DRAWINGS OR IN THIS SPECIFICATION. ANY OTHER MANUFACTURER IS CONSIDERED A
OR FIELD CONSTRUCTION OF WORK IN CONNECTION WITH THE ALTERATIONS, SURVEY EXISTING
SUBSTITUTION.
CONSTRUCTION INCLUDING STRUCTURE, FINISH, AND EQUIPMENT ADJACENT TO CONSTRUCTION
0. WORKMANSHIP: MAKE `PROPER AND APPROVED CONNECTIONS
OF NEW WORK TO EXISTING
2.
GC TO DEVELOP TIME AND AC11ON PLAN BASED ON THE WALKTMROUGH WITH STORE SETUP
TO BE REMOVED. CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCURATE TIE-IN OF THE
CONSTRUCTION AND ALL NECESSARY ADJUSTMENTS OF EITHER
OR BOTH AS REQUIRED TO
10.
HOLLOW METAL DOORS SHALL BE 18 GAUGE. EXTERIOR DOORS SHALL BE GALVANIZED
AND CVS CONSTRUCTION PROJECT MANAGER.
4.
SUBSTITUTIONS ARE SUBJECT TO THE APPROVAL OF THE OWNER. IF A SUBSTITUTION IS
NEW WORK TO THE EXISTING CONSTRUCTION.
PRODUiCE
A COMPLETE AND FINISHED JOB. PATCHING AND
NEW WORK SHALL MATCH
FLUSH TYPE WITH INSULATION.
SUBMITTED, INCLUDE COMPLETE PERFORMANCE FACTS FOR EVALUATION.
EXISTING
CONSTRUCTION; UNLESS OTHERWISE SHOWN OR SPECIFIED; AND SHALL COMPLY
3.
GC TO SECURE CERTIFICATE OF COMPLETION WHERE REQUIRED BY THE AUTHORITY HAVING
H. CONDUCT OF OPERATIONS: CONDUCT OPERATIONS IN SUCH MANNER AS TO CREATE A
WITH THE
APPLICABLE REQUIREMENTS OF THE INDIVIDUAL TECHNICAL SECTIONS OF THE
SECTION 08.14.16 - FLUSH WOOD DOORS
JURISDICTION AND FORWARD COPY TO ARCHITECT AND OWNER.
5.
IF SUBSTITUTIONS ARE APPROVED, NOTIFY ALL OTHER CONTRACTORS, SUBCONTRACTORS OF
MINIMUM OF NOISE, DUST, AND OTHER DISTURBANCE.
SPECIFICATIONS.
TRADES AFFECTED BY SUBSTITUTION AND FULLY COORDINATE. ANY COSTS RESULTING FROM
1.
PROVIDE ALL LABOR AND MATERIALS, SERVICES AND EQUIPMENT NECESSARY TO COMPLETE
4.
CONTRACTORS SHALL NOT SCALE THESE DRAWINGS FOR CONSTRUCTION PURPOSES. IN THE
SUBSTITUTION, WHETHER BY CONTRACTORS OR OTHERS, SHALL BE RESPONSIBILITY OF AND
1.
DO NOT ALLOW REMOVED MATERIALS, RUBBISH AND DEBRIS TO ACCUMULATE. KEEP THE
P. ALTERATIONS: CUT, PATCH, REPAIR, AND PERFORM OTHER ALTERATIONS USING MECHANICS
ALL WORK ASSOCIATED WITH INTERIOR WOOD DOORS.
EVENT OF OMISSION OF NECESSARY DIMENSIONS OR INFORMATION, CONTRACTOR SHALL
PAID FOR BY SUBSTITUTING CONTRACTOR.
CONSTRUCTION AREAS AND ALL PUBLIC AND PRIVATE PROPERTY USED IN CONNECTION WITH
SKILLED IN THE PARTICULAR TRADE OF WORK REQUIRED. WHERE REQUIRED TO PATCH OR
NOTIFY ARCHITECT. FIGURED AND CALCULATED DIMENSION TAKES PRECEDENCE OVER SCALED
THE WORK IN A NEAT ORDERLY CONDITION.
EXTEND EXISTING CONSTRUCTION, OR BOTH, MATCH THE EXISTING EXPOSED SURFACE
2.
CVS/PHARMACY HAS ENTERED INTO A NATIONAL ACCOUNT AGREEMENT WITH DH PACE FOR
MEASUREMENTS DETAILED DRAWINGS AND LARGER SCALE DRAWINGS TAKE PRECEDENCE
6.
ALL EQUIPMENT SHALL BE INSTALLED IN FULL ACCORDANCE WITH THE MANUFACTURER'S
2.
PLAN AND COORDINATE ACTIVITIES WITH THE OWNER IN ORDER TO PROVIDE ALL NECESSARY
MATERIALS IN FINISH, COLOR, TEXTURE, AND PATTERNS.
OVER SMALLER SCALE DRAWINGS. ALL PLAN DETAILS AND WALL SECTIONS ARE ASSUMED TO
E
INSTALLATION INSTRUCTIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
DATA AND INST L
CONTROLS FOR THE ABATEMENT OF DUST, NOISE AND INCONVENIENCE TO OWNER'S
FURNISHING THE WOOD BOORS PACKAGE AS SPECIFIED IN THIS SECTION. SUPPLY AND
BE TYPICAL CONDITIONS UNLESS DETAILED. OR NOTED OTHERWISE.
CONFORM TO THESE RE UIREMENTS PRIOR TO STARTING WORK:
CHECK AND Q
PERSONNEL AND OPERATIONS DURING ALL PHASES OF THE WORK. DO NOT SHUT .DOWN OR
Q. CLEANING.
CLEAN THE EXISTING SURFACES THAT ARE TO REMAIN IN THE AREAS OF WORK
COMPLETE INSTALLATION SHALL BE BY THE CONTRACTOR, FOR PRICING QUOTATIONS,
BLOCK OFF ANY .AREAS. WITHOUT PRIOR APPROVAL OF THE .OWNER.
OF THIS
CONTRACT: CLEAN. PARTITIONS AFTER ALL WORK IS -DONE IN THE AREA:
PLACING ORDERS AND FURTHER INFORMATION,PL ASE ALL H PAC 87 -1 7 .
ER E C D EAT (417) 3 8 8
5.
ALL FINISHED FLOOR ELEVATIONS RE: TO ARCHITECTURAL DRAWINGS ONLY. RE: CIVIL
D. CUTTING,PATCHING AND DRILLING
3.
DO NOT INTERRUPT EXISTING UTILITIES EXCEPT AS SPECIFIED OR WHEN APPROVED IN
DRAWINGS FOR RELATIONSHIP TO PROJECT BENCHMARK(S).
WRITING BY THE OWNER, AND THEN ONLY AFTER TEMPORARY UTILITY SERVICES HAVEBEENR.
REPAIRING: REPAIR ALL DAMAGE CAUSED BY WORK OF THIS CONTRACT, AT NO ADDITIONAL
3.
INTERIOR FLUSH WOOD .DOORS:
1.
ALL CUTTING AND CHASING OF THE BUILDING CONSTRUCTION AS REQUIRED SHALL BE IN A
PROVIDED BY THE CONTRACTOR AND APPROVED BY THE OWNER OR PROJECT SITE
COST TO THE OWNER.
6.
VERIFY ALL DIMENSIONS, CONDITIONS, AND GRADES AT JOB SITE. ALL CONTRACTORS SHALL
NEAT AND PROFESSIONAL MANNER.
REPRESENTATIVE.
DIVISION 02 -EXISTING CONDITIONS -REFER TO CIVIL SHEETS IF APPLICABLE
A.
;REFER TO DRAWINGS FOR LOCATIONS AND .ADDITIONAL REQUIREMENTS.
COORDINATE THEIR WORK WITH OTHER TRADES AND REPORT DISCREPANCIES, PRIOR TO THEIR
4.
CONDUCT ALTERATIONS AND DEBRIS REMOVAL IN SUCH A MANNER AS TO INSURE
B.
QUALITY STANDARD: CUSTOM GRADE HEAVY DUTY PERFORMANCE IN ACCORDANCE WITH
CONSTRUCTION, TO THE ARCHITECT FOR REVIEW AND CLARIFICATION OR ACTION.
2.
NEATLY SAW CUT ALL RECTANGULAR OPENINGS, SET SLEEVE THROUGH OPENING, AND FINISH
MINIMUM INTERFERENCE WITH STREETS, WALKS, PASSAGEWAYS AND OTHER FACILITIES
I
AWI/AWMAC/Wl (AWS).
PATCH OR PROVIDE TRIM FLANGE AROUND OPENING.
OCCUPIED BY THE OWNER; SUCH FACILITIES SHALL NOT BE CLOSED OFF TO TRAFFIC OR IN
DIVISION 03 -CONCRETE -REFER TO CIVIL SHEETS IF APPLICABLE
7.
VERIFY SIZE AND LOCATION OF ALL OPENINGS FOR MECHANICAL AND ELECTRICAL EQUIPMENT
I
ANY WAY OBSTRUCTED WITHOUT PRIOR WRITTEN PERMISSION.
C.
NON -RATED SOLID CORE: TYPE PARTICLEBOARD CORE (PC).
AND RELATED WORK WITH CONTRACTORS INVOLVED AND EQUIPMENT TO BE FURNISHED. FOR
3.
CORE DRILL AND SLEEVE ALL ROUND OPENINGS.
5.
AT THE COMPLETION OF THE WORK, REMOVE ALL TEMPORARY ENCLOSURES AND PROTECTIVE
DIVISION 04 - MASONRY - NOT USED
D.
WOOD VENEER FACING FOR TRANSPARENT FINISH: 5-PLY OR 7-PLY, NATURAL BIRCH,
CONSTRUCTION DETAILS NOT SHOWN, USE THE MANUFACTURER'S STANDARD DETAILS OR
DEVICES AND LEAVE THE PREMISES CLEAN.
VENEER GRADE, ROTARY CUT, WITH BOOK MATCH BETWEEN LEAVES OF VENEER.
APPROVED SHOP DRAWINGS DATA SHEETS IN ACCORDANCE WITH THE PROJECT
/
4,
DO NOT CUT ANY STRUCTURAL COMPONENTS WITHOUT ARCHITECT'S APPROVAL
-
DIVISION 05 METALS.
E.
CORE CONSTRUCTED WITH STILES AND RAILS: PROVIDE SOLID BLOCKS AT LOCK EDGE AND
SPECIFICATIONS.
1. SAFETY: METHODS SHALL BE SUCH AS TO ASSURE SAFE WORKING CONDITIONS IN
-
SECTION 05.40.00 COLD FORMED METAL FRAMING
TOP OF DOOR FOR CLOSER FOR HARDWARE REINFORCEMENT AND FOR OTHER
5.
PATCH AND FINISH TO MATCH ADJACENT AREAS THAT HAVE BEEN -CUT, DAMAGED OR
ACCORDANCE WITH APPLICABLE SAFETY LAWS; TO PREVENT COLLAPSE OF ANY SECTION; AND
1, PROVIDE AND INSTALL PRIMARY AND SECONDARY FRAMING MEMBERS, BRIDGING, BRACING,
THROUGHBOLTED HARDWARE.
8.
E
CEILING HEIGHTS SCHEDULED ON THE ROOM FINISH SCHEDULE OR REFLECTED CEILING PLAN
MODIFIED AS A RESULT OF THE INSTALLATIONS OF THE MECHANICAL OR ELECTRICAL
TO PREVENT DAMAGE TO FACILITIES INDICATED TO REMAIN IN PLACE AND TO NEW
PLATES, GUSSETS, CLIPS, FITTINGS, REINFORCEMENT, AND FASTENINGS AS REQUIRED` TO
F.
FACTORY MACHINE DOORS FOR HARDWARE OTHER THAN SURFACE -MOUNTED HARDWARE IN
.
ARE TAKEN FROM THE FINISHED FLOOR ELEVATION. I
EQUIPMENT, FIRE STOP ALL PENETRATIONS OF FIRE RATED CONSTRUCTION IN A CODE
CONSTRUCTION.
PROVIDE A COMPLETE FRAMING SYSTEM.
ACCORDANCE WITH HARDWARE REQUIREMENTS AND DIMENSIONS.
9,
ALL PLAN DIMENSIONS ARE TO FACE OF FINISHED WALLS; FACE OF MASONRY, AND
APPROVED MANNER.
J. FIRE PROTECTION: PERFORM THERMAL AND FLAME -CUTTING OPERATIONS PER THE HAZARD
DIVISION 06 - WOOD PLASTICS AND COMPOSITES
G.
FACTORY FIT DOORS FOR FRAME OPENING DIMENSIONS, WITH EDGE CLEARANCES IN
ACCORDANCE WITH SPECIFIED QUALITY STANDARD.
CENTERLINE OF COLUMNS, UNLESS NOTED OTHERWISE:
E. WARRANTY
PRECAUTION REQUIREMENTS OF THE OWNER'S SAFETY REQUIREMENTS OR THAT REQUIRED BY
SECTION 06 0001 - NATIONAL ACCOUNTS
THE FOLLOWING IS A LIST OF SPECIFICATION SECTIONS WITHIN THIS DIVISION STIPULATING NATIONAL
H.
PROVIDE EDGE CLEARANCES IN ACCORDANCE WITH THE QUALITY STANDARD SPECIFIED.
10.
VERIFY ALL ELEVATIONS AND DIMENSIONS OF STRUCTURAL ELEMENTS WITH ARCHITECTURAL
1.
PROVIDE FULL WARRANTY ON ALL MATERIALS, EQUIPMENT AND WORKMANSHIP FOR ONE (1)
LAW.
ACCOUNTS THE OWNER HAS ENTERED INTO WITH THE SPECIFIED MANUFACTURER(S):
I.
FIELD APPLIED TRANSPARENT FINISH: AS INDICATED ON DRAWING:
DRAWINGS. IN CASE OF CONFLICT, NOTIFY ARCHITECT. THE CONTRACTORS SHALL VERIFY ALL
YEAR FROM DATE OF ACCEPTANCE, UNLESS NOTED OTHERWISE.
1.
IF CUTTING TORCHES ARE USED, TAKE ALL PRECAUTIONS NECESSARY TO PREVENT SETTING
DIMENSIONS AND BE RESPONSIBLE FOR THEM. ALL DIMENSIONAL DISCREPANCIES ARE TO BE
OF FIRES, INCLUDING USE OF FIREPROOF TARPAULINS AND MAINTENANCE OF FIRE
4.
VERIFY EXISTING CONDITIONS, OPENING SIZES AND TOLERANCES ARE ACCEPTABLE BEFORE
BROUGHT TO THE ATTENTION OF THE ARCHITECT..
2.
EXTEND ALL MANUFACTURER'S WARRANTIES TO OWNER, INCLUDING FIVE (5) YEAR HEAT
EXTINGUISHING APPARATUS .ADJACENT TO CUTTING AREA.
SECTION 06 4023 - INTERIOR ARCHITECTURAL WOODWORK: CABINETS COUNTERTOP AND
STARTING WORK.
EXCHANGER EXTENDED WARRANTY ON HVAC EQUIPMENT.
2.
OBTAIN A DAILY PERMIT FROM OWNER'S PLANT PROTECTION DEPARTMENT FOR USING.
LABORATORY TOPS.
5.
DO NOT INSTALL DOORS IN FRAME OPENINGS THAT ARE NOT PLUMB OR ARE
11.
CONTRACTOR TO CONTACT ANY AND ALL LOCAL UTILITIES TO SUBMIT ALL APPLICABLE
CUTTING TORCHES, PRIOR TO THEIR USE.
OUT -OF -TOLERANCE FOR SIZE OR ALIGNMENT:
PERMIT DOCUMENTS, QUALIFICATIONS, ETC., AND BE RESPONSIBLE FOR ALL FEES
3.
REPAIR OR REPLACE WITHOUT CHARGE TO THE OWNER ALL ITEMS FOUND DEFECTIVE DURING
1.1 NATIONAL ACCOUNT
6.
INSTALL DOORS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND SPECIFIED
ASSOCIATED WITH PERMITS, UTILITY EXTENSIONS, TAP -INS, ETC. ARCHITECT TO SUBMIT
THE WARRANTY PERIOD.
K. REMOVED MATERIALS: REMOVED MATERIALS NOT INDICATED FOR TURNING OVER TO THE
A. CVS/PHARMACY HAS ENTERED INTO A NATIONAL ACCOUNT AGREEMENT WITH COLONY
QUALITY STANDARD.
DOCUMENTS FOR PERMIT PLAN REVIEW AND OWNER REVIEW, THE CONTRACTOR SHALL BE
OWNER OR INDICATED FOR REUSE, AS WELL AS RUBBLE AND DEBRIS RESULTING FROM SUCH
DISPLAY FOR FURNISHING THE INTERIOR ARCHITECTURAL WOODWORK SPECIFIED IN THIS
7.
USE MACHINE TOOLS TO CUT OR DRILL FOR HARDWARE.
RESPONSIBLE FOR OBTAINING THE PERMITS AND ALL PERMIT AND INSPECTION COSTS.
IALTERATION
PROCEDURES
OPERATIONS, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED
SECTION. COMPLETE INSTALLATION SHALL BE BY THE CONTRACTOR. FOR PRICING
g.
COORDINATE INSTALLATION OF DOORS WITH INSTALLATION OF FRAMES AND HARDWARE.
DAILY FROM THE PROJECT SITE AND LEGALLY DISPOSED OF OFF THE PROJECT SITE.
QUOTATIONS,
PLACING ORDERS, AND FURTHER INFORMATION;, CALL 1.978.828.9017, MENTION
9.
ADJUST DOORS FOR SMOOTH AND BALANCED DOOR MOVEMENT.
12
CONTRACTOR TO REVIEW AND BECOME FAMILIAR WITH ALL EXISTING CONDITIONS PRIOR TO
01,10.00
- ALTERATION PROCEDURES
CVS;FAX:
847.426,7791; WWW.COLONYDISPLAY.COM.
COMMENCING WORK. ANY CONDITIONS NOT DOCUMENTED ON THESE DRAWINGS OR OBSERVED
1.
IN REMOVING SALVAGEABLE ITEMS THAT ARE SCHEDULED OR SPECIFIED FOR REUSE OR THAT
10.
ADJUST CLOSERS FOR FULL CLOSURE.
TO BE DIFFERENT THAN THOSE SHOWN ON THESE DRAWINGS ARE TO BE REPORTED TO THE
A. ALTERATION SCOPE: PERFORM ALL ALTERATION AND REMOVAL WORK, INCLUDING THE
ARE TO BE TURNEd OVER TO THE OWNER, EXERCISE CARE IN REMOVING SUCH ITEMS SO AS
SECTION 06.10.
0 0 - ROUGH CARPENTRY
ARCHITECT AND OWNER PRIOR TO BEGINNING CONSTRUCTION.
ALTERATION AND REMOVAL WORK INCIDENTAL TO THAT SHOWN OR SPECIFIED, TO COMPLETE
NOT TO DAMAGE THEM.
THE ALTERATION AND REMOVAL WORK AS SHOWN ON THE DRAWINGS AS SPECIFIED OR TO
2.
IF THE CONSTRUCTION SCHEDULE DOES NOT ALLOW IMMEDIATE REINSTALLATION OF REMOVED
1. PROVIDE AND INSTALL ALL WORK NECESSARY FOR ROUGH CARPENTRY INCLUDING:
SECTION 08.30.00 - SPECIAL DOORS & WINDOWS
13.
SPECIFICATIONS ARE APPLICABLE TO ALL CONTRACTORS AND/OR SUBCONTRACTORS.
COMPLETE CONTRACTUAL REQUIREMENTS
ITEMS TO BE REUSED PROVIDE ADEQUATE STORAGE FACILITIES FOR SUCH ITEMS IN STORAGE
AREA DESIGNATED BY OWNER, TRANSPORT SUCH ITEMS TO THE STORAGE AREA, STORE
1.
PROVIDE ALL LABOR AND MATERIALS, SERVICES AND EQUIPMENT NECESSARY TO COMPLETE
14.
CHECK OTHER PLANS AND SPECIFICATIONS AND FULLY COORDINATE WITH OTHER SYSTEMS
B. COORDINATION: WORK .IN CLOSE COORDINATION WITH THE OTHER CONTRACTORS ON THE
THEM, AND PROTECT THEM FROM DAMAGE DURING STORAGE.
A. GOOD GROUNDS, NAILERS, AND BLOCKING.
ALL WORK 'ASSOCIATED WITH SPECIAL DOORS AND WINDOWS.
ON GRADES.
PROJECT TO ACCOMPLISH THE ALTERATIONS FOR THE WHOLE PROJECT.
3.
WHEN THE CONSTRUCTION SCHEDULE CALLS FOR INSTALLATION OF STORED ITEMS TO BE
B. WOOD FURRING & FRAMING.
REUSED, REMOVE SUCH ITEMS FROM STORAGE, TRANSPORT THEM TO LOCATION(S) OF
C. ROOF PLATES AND CANTS.
2.
ALUMINUM SECURITY ROLL DOWN GRILLES SHALL BE MOTORIZED OR MANUAL OPERATION.
15.
ITEMS SUPPLIED BY CVS AND INSTALLED BY THE GC ARE NOT INCLUDED IN THE
C. ADDITIONAL WORK: IN ADDITION TO WORK SHOWN;
INSTALLATION, INSTALL THEM, AND CLEAN UP STORAGE AREA:
PROVIDE TRACK, HOUSING- ETC. FOR A COMPLETE INSTALLATION PER MANUFACTURERS
SPECIFICATIONS
1.
MODIFY EXISTING CONSTRUCTION THAT INTERFERES WITH NEW CONSTRUCTION, TO THE
L. SUPPORT OF EXISTING STRUCTURE: PRIOR TO REMOVING EXISTING CONSTRUCTION, PROVIDE
2• ALL WOOD BLOCKING, NAILERS, PLATES AND PLYWOOD SHALL BE EXTERIOR GRADE,
REQUIREMENTS,
GENERAL CONDITIONS:
IEXTENT OF THE INTERFERENCE.
TEMPORARY SHEETING, UNDERPINNING, SHORING AND BRACING TO CARRY THE LOADS AND
CHEMICALLY FIRE RETARDANT TREATED.
2.
CUT AND LATER PATCH ALL HOLES AND OPENINGS IN EXISTING CONSTRUCTION NECESSARY
STRESSES WITHSTOOD IN PLACE BY THE ITEMS TO BE REMOVED.
A.
GENERAL
FOR CONNECTION OF BUILDING WORK; FOR THE PASSAGE OR CONNECTION OF STRUCTURAL
3. ALL WOOD IN CONTACT WITH MASONRY OR CONCRETE SHALL COMPLY WITH APPLICABLE
SECTION 08.56.59 - SERVICE AND TELLER WINDOW UNITS
MEMBERS; AND FOR THE BUILDING ALTERATIONS IN CONNECTION WITH MECHANICAL AND
1.
SUCH TEMPORARY CONSTRUCTION SHALL BE PLACED SO AS NOT TO BLOCK FIRE EXITWAYS
STANDARDS FOR PRESERVATIVE TREATMENT LUMBER. (LUMBER AWPA C2).
1.
CONFORM TO ALL GENERAL AND SPECIAL CONDITIONS OF CONTRACT AS SPECIFIED BY
ELECTRICAL WORK.
OF THE EXISTING BUILDING, SO AS NOT TO INTERFERE WITH OWNER'S OPERATIONS, AND SO
1.
CVS/PHARMACY HAS ENTERED INTO A NATIONAL ACCOUNT AGREEMENT WITH D, INC.
ARCHITECT AND OWNER.
3.
PROPERLY REPAIR ALL SURFACES LEFT IN PLACE AND SCHEDULED TO BE EXPOSED, ALL
AS TO ALLOW SPACE FOR PERFORMING THE REQUIRED ALTERATIONS.
SECTION 06.16.00 - SHEATHING
FOR FURNISHING THE DRIVE-THRU WINDOW SPECIFIED THIS SECTION. SUPPLLYY AN
AND
SURFACES DAMAGED DUE TO ALTERATIONS; AND ALL DAMAGED SURFACES PREVIOUSLY
2,
BE RESPONSIBLE FOR THE ADEQUACY OF TEMPORARY SUPPORT OF STRUCTURE, AS WELL AS
1. PROVIDE AND INSTALL 1/4" , BY DAMES HARDIE BUILDING
NARDIEBACKER CEMENT BOARD
COMPLETE INSTALLATION SHALL BE BY THE CONTRACTOR:. FOR PRICING QUOTATIONS;
O
2.
VISIT SITE, CHECK FACILITIES AND CONDITIONS, VERIFY ALL UTILITY CONNECTIONS, AND TAKE
CONCEALED THAT WILL BE LEFT EXPOSED DUE TO ALTERATIONS, EVEN THOUGH SUCH
FOR DAMAGE TO THE EXISTING BUILDING AND CONTENTS THEREOF RESULTING FROM
PRODUCTS INC AS SPECIFIED.
PLACING ORDERS, AND FURTHER INFORMATION, CALL DIEBOLD, INC. AT (508) 480-6400.
ALL ITEMS INTO CONSIDERATION IN BID & PROVIDE WRITTEN ACKNOWLEDGEMENT IN BID.
DAMAGE WAS NOT CAUSED BY WORK OF THIS CONTRACT.
INADEQUATE SHEATHING, UNDERPINNING, SHORING AND BRACING.
4.
BE RESPONSIBLE FOR A COMPLETE JOB, WHETHER DONE AS WORK UNDER THIS SECTION OR
3.
AFTER MATERIALS AND EQUIPMENT ARE REMOVED, INSPECT THE STRUCTURE AND EQUIPMENT
3.
SYSTEMS ARE TO BE COMPLETE AND WORKABLE IN ALL RESPECTS, PLACED IN OPERATION
ASSIGNED TO THE PARTICULAR TRADES INVOLVED.
TO REMAIN IN PLACE AND NOTIFY THE ARCHITECT -ENGINEER OF DEFECTS UNCOVERED AND
2. TYPE AND THICKNESS: 1 /4„ THICK UNLESS OTHERWISE INDICATED ON DRAWINGS.
2.
PROVIDE ALL LABOR AND MATERIALS, SERVICES AND EQUIPMENT NECESSARY TO COMPLETE
AND PROPERLY ADJUSTED,
NOT PREVIOUSLY IDENTIFIED BY THE CONTRACT DOCUMENTS. REPAIR OF SUCH DEFECTS
ALL WORK ASSOCIATED WITH THE DRIVE THRU WINDOW,
D. OWNER OCCUPANCY: THE OWNER WILL OCCUPY AND USE THE FACILITIES ADJACENT TO THE
AND OTHER ADDITIONAL WORK REQUIRED BY THE ARCHITECT -ENGINEER WILL BE
3. CEMENT BOARD INSTALLATION SHALL BE ON 20 GAUGE EQUIVALENT OR HEAVIER METAL
4.
EACH CONTRACTOR SHALL PROVIDE FOR HIS OWN CLEAN UP, REMOVAL AND LEGAL
AREAS OF WORK DURING THE ENTIRE CONSTRUCTION PERIOD. PLAN AND COORDINATE
COMPENSATED BY CONTRACT ADJUSTMENT PER THE CONTRACT DOCUMENTS,
STUDS OR FURRING Q 16" ON CENTER. FOR EXISTING 24" O.C. METAL STUDS - PROVIDE
3.
AS INDICATED ON DRAWINGS PROVIDE SLIDING WINDOW UNIT WITH LEVEL 1 BULLET
DISPOSAL OF ALL RUBBISH ON A DAILY BASIS.
ACTIVITIES WITH THE OWNER OR PROJECT SITE REPRESENTATIVE IN ORDER TO PROVIDE ALL
HORIZONTAL BRACING AT 5'-O" AFF.
RESISTANT GLAZING AS MANUFACTURED BY DIEBOLD, INC.
NECESSARY CONTROLS FOR THE ABATEMENT OF DUST, NOISE, AND INCONVENIENCE TO
M. TEMPORARY PARTITIONS AND CLOSURES: PROVIDE WEATHERTIGHT PARTITIONS OR CLOSURES
5.
GC IS TO DO A THOROUGH CLEANING OF THE RESTROOM WALL TILES, FLOOR TILES, AND
EVERY SURFACE IN THE RESTROOMS WITH A CLEANING SOLUTION. RESTROOM WALLS MUST
OWNER'S PERSONNEL DURING ALL PHASES OF THE WORK.
AT EXTERIOR OPENINGS TO ISOLATE THE AREAS FROM THE REST OF THE BUILDING AND
TO PROTECT THE BUILDING FROM THE ELEMENTS WHERE ALTERATION OPERATIONS WOULD
4. FASTENER SIZE: MINIMUM 1-1/4". MAXIMUM FASTENER SPACING: 8 INCH ON CENTER FOR
4.
CHECK ACTUAL WINDOW OPENINGS BY ACCURATE FIELD MEASUREMENT BEFORE FABRICATION.
B REPAINTED WITH PT28. RE. ARCHITECTURAL INTERIOR FINISH SCHEDULE.
E
1.
D0 NOT SHUT. DAWN ANY SERVICES OR BLOCK OFF ANY .AREAS WITHOUT PRIOR APPROVAL
EXPOSE THE INTERIOR TO THE ELEMENTS: PROVIDE -DUST -TIGHT PARTITIONS AROUND
WOOD STEEL FRAMING.
/
SHOW RECORDED MEASUREMENTS ON SHOP DRAWINGS. COORDINATE FABRICATION SCHEDULE
WITH CONSTRUCTION PROGRESS TO AVOID DELAY OF THE WORK,
OF THE OWNER OR PROJECT SITE REPRESENTATIVE.
INTERIOR AREAS TO ISOLATE THE AREAS FROM THE REST OF THE BUILDING WHERE
6.
EACH CONTRACTOR SHALL REMOVE ALL DEMO MATERIALS FROM SITE.
2.
THE OWNER WILL VACATE THE EXISTING AREAS REQUIRING IMMEDIATE WORK OR TO CONFORM
ALTERATION OPERATIONS WOULD CREATE DUST CONDITIONS, INCLUDING DUST -TIGHT
5. KEEP FASTENERS 3 8" FROM BOARD EDGES AND 2" FROM SHEET CORNERS. FASTENERS TO
WITH THE SCHEDULE OF WORK AND SEQUENCE OF CONSTRUCTION, AND WILL REMOVE ALL
CLOSURES BELOW SUPPORTED FLOOR SLABS WHEN MAKING NEW OPENINGS THEREIN AND
BE FLUSH WITH SURFACE WITHOUT OVERDRIVING.
A
5.
PROVIDE A COMPLETE WINDOW ASSEMBLY, INCLUDING GLAZING, WITH DEAL DRAWER AND AN
7.
FULLY COORDINATE ALL WORK AND COOPERATE COMPLETELY WITH OTHER CONTRACTORS,
FURNITURE, EQUIPMENT ANDFIXTURES PRIOR TO THE START OF THE
PORTABLE ITEMS OF FURNI E, Q
WEATHERTIGHT CLOSURES OVER ROOF DECKS WHEN MAKING NEW OPENINGS THEREIN:
AUDIO PACKAGE WITH TWO (2) COMMASTER AUDIO CONSOLES, ONE (1) PRIVACY HANDSET,
SUBCONTRACTORS. AND OWNER..
WORK,
AND ONE �1) CHIME INTERFACE OPTION.
1.
PROVIDE WEATHERPROOF PARTITIONS OF WOOD FRAMING AND PLYWOOD SHEATHING (TAPE
5. INSTALL BOARDS 1 /4" ABOVE FLOOR AND CAULK ACCORDINGLY,
8.
CONTRACTORS MUST CONFIRM ALL UTILITY CONNECTION POINTS IN FIELD, PRIOR TO
E. WORK SCHEDULING: THE WORK SHALL BE MUTUALLY SCHEDULED BY THE ARCHITECTURAL,
JOINTS AND PAINT WOOD WITH EXTERIOR TYPE PAINT) WHERE SHOWN OR DIRECTED,
SECTION 08.71.11 - DOOR HARDWARE
STARTING WORK.
MECHANICAL AND ELECTRICAL CONTRACTORS, AND THE OWNER TO COORDINATE THE WORK
ACCEPTABLE TO THE OWNER OR PROJECT SITE REPRESENTATIVE; PROVIDE ACCESS DOORS
6. ALL JOINTS TO BE FILLED WITH MORTAR AND EMBED 2" WIDE HIGH -STRENGTH
9.
ARRANGE FOR AND OBTAIN OWNERS PERMISSION FOR ANY SERVICE SHUTDOWNS REQUIRED
OF THE SEPARATE CONTRACTS AND OF THE OWNER'S OPERATIONS, AND TO FACILITATE
AS REQUIRED, COMPLETE WITH HARDWARE, AND LOCKABLE WHERE REQUIRED FOR OWNER'S
ALKALI -RESISTANT GLASS FIBER TAPE IN THE MORTAR AND LEVEL,
1.
CVS/PHARMACY HAS ENTERED INTO A NATIONAL ACCOUNT AGREEMENT. WITH DH PACE FOR
UNDER THIS CONTRACT
COMPLETION OF THE WORK.
SECURITY.
MORTAR TO BE: LATEX OR ACRYLIC MODIFIED THINSET COMPLYING WITH ANSI A118.4 AND
FURNISHING THE DOOR HARDWARE AS SPECIFIED IN THIS SECTION. COMPLETE INSTALLATION
2.
EXISTING EXTERIOR WALLS TO BE REMOVED MAY BE LEFT IN PLACE (WHERE NOTED
TYPE 1 MASTIC COMPLYING WITH ANSI A136.1 (INTERIOR USE ONLY).
SHALL BE BY THE CONTRACTOR. FOR PRICING QUOTATIONS, PLACING ORDERS, AND FURTHER
10.
THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS,
1.
THE WORK MAY BE SCHEDULED DURING .THE ENTIRE 24 HOURS OF ANY WEEKDAY, .PROVIDED
NO LAWS ARE VIOLATED AND THAT THE OPERATIONS ARE SO CONDUCTED AS NOT TO
APPROVED ) TO SERVE AS SEPARATION WALLS DURING CONSTRUCTION, AND THEN BE
INFORMATION, CALL DH PACE AT (417) 873-1878.
SEQUENCES OF CONSTRUCTION, AND THE SAFETY OF WORKERS.
CREATE A PUBLIC NUISANCE OR TO DISTURB THE PEACE. IF THE WORK IS STOPPED BY
REMOVED WHEN. APPROVED OR DIRECTED BY THE OWNER OR PROJECT SITE REPRESENTATIVE..
-
SECTION 06.20.00 FINISH CARPENTRY
PUBLIC AUTHORITY DUE TO SUCH NUISANCE, DISTURBANCE OR LAW VIOLATION, CONTRACTOR
3.
WHERE OWNER'S OPERATIONS, PERSONNEL AND EQUIPMENT ARE SUBJECT TO FLYING DUST,
2.
PROVIDE LABOR, MATERIALS, SERVICES AND EQUIPMENT NECESSARY FOR COMPLETE
11.
ALL WEATHER -EXPOSED SURFACES SHALL HAVE A WEATHER RESISTIVE BARRIER TO
SHALL PERFORM WORK NECESSARY TO MAINTAIN THE OVERALL SCHEDULE.
DEBRIS, ETC. FROM REMOVAL OR CONSTRUCTION OPERATIONS, PROVIDE HEAVY DUTY VINYL
1. PROVIDE ALL LABOR, MATERIALS, SERVICE AND EQUIPMENT NECESSARY FOR ALL FINISH
INSTALLATION OF FINISH HARDWARE.
PROTECT THE INTERIOR WALL COVERING. EXTERIOR OPENINGS SHALL BE FLASHED IN SUCH ,
O
2.
WORK THAT WILL INTERFERE WITH THE OWNERS OPERATIONS OR USE OF THE FACILITIES,'
SHEET SECURED TO CEILING: AND FLOOR CONSTRUCTION IN MANNER ACCEPTABLE TO THE
CARPENTRY WORK INCLUDING BUT NOT LIMITED TO:
A MANNER AS TO MAKE THEM WATERPROOF.
INCLUDING THE SHUTTING DOWN OF MECHANICAL AND ELECTRICAL SERVICES SHALL BE
`
OWNER OR PROJECT SITE REPRESENTATIVE; WHERE REQUIRED TO PERMIT PASSAGE OF
MATERIALS AND PERSONNEL SHEETS SHALL BE OVERLAPPED AND SECURED.
3.
_ - -
HINGES: 3 1/2" x 3 1/2" INCHES FOR 1-3/8" DOORS AND 1/2" x 5" FOR 1 3/4"
12.
1
THE CONTRACTOR SHALL REMOVE ALL DEBRIS AS A RESULT OF THIS PROJECT DAILY,. OR AS
APPROVAL OF THE OWNER SO AS TO CAUSE A MINIMUM AMOUNT OF
SCHEDULED, WITH THE APP 0
4.
PLACE TEMPORARY PARTITIONS S0 AS TO PROVIDE ADEQUATE SPACE TO CARRY ON THE
A. INSTALLATION OF DOORS AND HARDWARE.
DOORS. FURNISH NON REMOVABLE PINS (NRP) FOR HINGES ON EXTERIOR OUTSWINGING
DIRECTED BY OWNERS REPRESENTATIVE, IN A LEGAL MANNER.
INTERRUPTION. THE SCHEDULING SHALL CONSIDER BOTH THE TIMES, THE TYPES, AND THE
AREAS OR PLACES OF SUCH INTERFERENCES, AND SHALL INCLUDE ROUTES AND TIMES OF
ALTERATION OPERATIONS BUT SO AS NOT TO INTERFERE WITH OWNER'S OPERATIONS, AND
B. INSTALLATION OF CABINETRY AS PROVIDED BY THE TENANT.
DOORS. (ONE PER OPENING).
INGRESS AND EGRESS OF PEOPLE AND MATERIALS.
SO AS NOT TO ENCROACH ON FIRE .EXIT WAYS OF THE EXISTING: BUILDING. PLACE
C. INSTALLATION OF PREFINISHED PANELING.
13,
EACH SUBCONTRACTOR IS RESPONSIBLE TO COORDINATE AND SCHEDULE HIS WORK WITH THE
3.
WHEN EXISTING BUILDING IS OCCUPIED, MAINTAIN FREE, CLEAR, UNOBSTRUCTED, SAFE
PARTITIONS WHERE SHOWN ON DRAWINGS AND, IF NOT SHOWN, WHERE APPROVED BY THE
D. INSTALLATION OF PLASTIC AND LOW PRESSURE LAMINATES AS SCHEDULED.
4.
LOCK SETS AND LATCH SETS`.
GENERAL CONTRACTOR AND ALL OTHER CONTRACTORS WHOSE WORK SHALL BE AFFECTED.
EGRESS THROUGH EXISTING EXITS AND THROUGH AND SAFELY BEYOND NEW CONSTRUCTION
OWNER OR PROJECT SITE REPRESENTATIVE.
(STANDARD DUTY CYLINDRICAL): SERIES AND FUNCTION DESIGNATIONS ARE SCHLAGE.
AS REQUIRED BY STATE AND LOCAL FIRE SAFETY CODES.
5.
TEMPORARY PARTITIONS SHALL BE OF FLAME -RESISTANT CONSTRUCTION. SUBMIT PROPOSED
2. EXCEPTION: CHAIR RAIL SUPPLIED BY CVS
FURNISH LATCNBOLT ASSEMBLIES WITH PREPARATION DIMENSIONS IDENTICAL TO HEAVY- DUTY
14,
PARKING AT THE SITE BY ALL CONSTRUCTION STAFF SHALL BE LIMITED TO ONLY THE AREAS
4.
PROVIDE ADEQUATE AND PROPER PROTECTION, INCLUDING HEAT, TO THE EXISTING BUILDINGS
METHOD OF PARTITION CONSTRUCTION FOR APPROVAL.
CYLINDRICAL, ANSI A156.2. SERIES 4000, GRADE 1. ALL HARDWARE TO MEET A.D.A.
DESIGNATED BY THE OWNER.
AND PREMISES .00CUPIED BY THE OWNER DURING THE EXECUTION AND COMPLETION OF THE
6.
OPENINGS MADE IN EXTERIOR WALLS AND ROOF SHALL BE CLOSED THE SAME DAY THAT
DIVISION 07 -THERMAL AND MOISTURE PROTECTION -NOT USED
REQUIREMENTS. -PROVIDE LEVER HANDLE DESIGN, PRIVACY LOCK SET AT TOILETS;
WORK IN SUCH MANNERTHAT THE OWNER'S OPERATIONS MAY BE CARRIED ON WITHOUT
THEY ARE OPENED, EITHER BY PERMANENT CONSTRUCTION OR WITH VANDALPROOF,
MINUTECLINIC AND WELLNESS CENTER DOORS. (PASSAGE LATCH SET AT STOCK ROOM
15.
THE AREA OF WORK SHALL MAINTAIN A WEATHER TIGHT AND SECURED CONDITION AT ALL
TIMES. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO SECURE THE AREA
.
INTERFERENCE, INTERRUPTION OR INCONVENIENCE AT ALL TIMES. DURING THE PROJECT
DUST -TIGHT TEMPORARY CLOSURES , WEATHERPROOF . NO OPENINGS IN EXTERIOR WALLS OR
ROOF SHALL BE ALLOWED TO REMAIN OPEN; SECURITY OF THE BUILDING MUST BE
DIVISION OS -DOORS AND WINDOWS
DOORS. EXIT LOCATED AT .REAR AND SIDE EXTERIOR DOOR.
OF WORK.
SCHEDULE.
. MAINTAINED AT ALL TIMES
SECTION 08.11.13 - HOLLOW METAL DOORS AND FRAMES
5.
ALL WORK MUST BE SCHEDULED. NOTIFY THE OWNER OR PROJECT SITE REPRESENTATIVE 72
5.
DOOR CLOSER:
1$.
GC TO COORDINATE WITH CVS CONSTRUCTION PROJECT MANAGER IF WORK BE COMPLETED
HOURS IN ADVANCE OF ANY CONSTRUCTION OPERATIONS AREA THAT IS IN USE BY THE ,
OWNER SO THE OWNER CAN VACATE THE AREA AND REMOVE ANY PORTABLE EQUIPMENT
N. PERSONNEL AND BUILDING PROTECTIONS: PROVIDE,. AND LATER REMOVE, TEMPORARY
1. CVS/PHARMACY HAS ENTERED INTO A NATIONAL ACOUNT AGREEMENT WITH DH PACE FOR
FURNISH SURFACE MOUNTED .TYPE WITH PARALLEL ARM - DORMA 8616, NO SUBSTITUTIONS.
DURING BUSINESS HOURS OR OVERNIGHT
MATERIAL AND FURNITURE
BARRIERS, WARNING SIGNS, BLINKER LIGHTS, AND OTHER SAFETY MEASURES, AS REQUIRED
FURNISHING THE HOLLOW STEEL DOORS AND FRAMES PACKAGE SPECIFIED IN THIS SECTION.
FOR THE PROTECTION OF PERSONNEL, BOTH OWNER'S AND CONTRACTOR'S, AND THE PUBLIC
COMPLETE INSTALLATION SHALL BE BY THE CONTRACTOR.. FOR PRICING .QUOTATIONS,
6.
WEATHER-STRIPPING:
17.
CONSTRUCTION SHALL TAKE PLACE IN A LIVE ENVIRONMENT AND AT NO TIME SHALL THE
PROBLEMS INHERENT IN REMODELING THE BUILDING UNDER
F. PHASING: BECAUSE THE PRO E
PER THE CONTRACT DOCUMENTS.
PLACI'
G ORDERS, AND FURTHER INFORMATION, CALL DH PACE AT (417 873-1878,
)
PROVIDE WEATHER-STRIPPING, THRESHOLD AND DOOR SWEEP AT ALL EXTERIOR DOORS.
CVS CUSTOMERS BE ROUTED OVER CONSTRUCTION RELATED MATERIALS. ALL WORK DURING
CONDITIONS OF FULL OPERATION, THERE MUST BE A HIGH DEGREE OF COOPERATION.
O
I
BUSINESS HOURS SHALL BE PROPERLY BARRICADED OFF FOR CUSTOMER PROTECTION AND
BETWEEN ALL PARTIES INVOLVED IN THE PLANNING AND CONSTRUCTION PROCESS.
1.
ADJACENT STRUCTURES: DURING THE ALTERATION OPERATIONS, PROTECT FROM DAMAGE,
ADJACENT BUILDINGSPAVEMENTS AND SURFACES WHICH. ARE TO REMAIN. IF ADJACENT
2. PROVIDE ALL LABOR AND MATERIALS, SERVICES AND EQUIPMENT NECESSARY TO COMPLETE
7.
REFER TO THE DRAWINGS FOR ADDITIONAL ITEMS. HARDWARE FINISH TO BE US 26D.
CUSTOMERS ROUTE SHALL BE CLEARLY ESTABLISHED.
CONSEQUENTLY, THE WORK - ALTERATION, REMOVAL AND NEW CONSTRUCTION - MUST BE
,
STRUCTURES ARE DAMAGED, REPAIR SUCH STRUCTURES AT NO COST TO THE OWNER.
ALL WORK ASSOCIATED WITH STEEL DOORS AND FRAMES.
18.
ONE TOILET ROOM SHALL REMAIN IN OPERATION AT. ALL TIMES OF CONSTRUCTION AND BE
PLANNED AND EXECllTED CAREFULLY. TO FACILITATE THESE REQUIREMENTS, A GENERALIZED
PHASING SEQUENCE SHOULD BE ESTABLISHED.
2.
ROOF: PRIOR TO STARTING WORK OR ALLOWING TRAFFIC ON THE EXISTING ROOF, PROVIDE
DESIGNATED AS UNISEX. GC TO PHASE CONSTRUCTION ACCORDINGLY. COORDINATE WITH CVS
APPROVED TEMPORARY 3/4 INCH THICK PLYWOOD PROTECTION ON THE EXISTING BUILT-UP
3. HINGED DOOR AND FRAMES DESCRIBED HEREIN ARE FOR A MAX. OF 4 FT. WIDE AND 8 FT.
CONSTRUCTION PROJECT MANAGER.
1.
EACH PHASED WARE AREA SHALL BE COMPLETE AND CLEANED BEFORE ADVANCING TO THE
ROOFING SYSTEM DURING OPERATIONS ON THE ROOF. BE RESPONSIBLE FOR REPAIRING
HIGH DOORS, COMPLYING WITH STEEL DOOR INSTITUTE (SDI) RECOMMENDED SPECIFICATIONS.
NEXT PHASING AREA.
DAMAGE THAT OCCURS TO THE EXISTING BUILT-UP ROOFING SYSTEM DUE TO CONTRACT
19.
GC TO SEAL ANY PENETRATIONS THROUGH EXISTING WALLS, FLOORS, CEILING, ETC TO
2.
CONSULT AND COORDINATE THE WORK WITH THE OTHER CONTRACTORS AND WITH THE
OPERATIONS.
4. WHER I FIRE RATED DOOR ASSEMBLIES ARE INDICATED OR REQUIRED PROVIDE DOOR AND
ACCOMMODATE INSTALLATION OF NEW UTILITIES. NOTIFY ARCHITECT IMMEDIATELY IF ANY
PHASING PLAN. A SCHEDULE OF THE WORK SHALL BE PRESENTED TO THE OWNER FOR
3,
FACE OF BUILDING: METHODS FOR TRANSPORTING MATERIALS BETWEEN GROUND AND ROOF
FRAM
ASSEMBLIES THAT COMPLY WITH NFPA 80.
CONDITIONS IN THE FIELD DO NOT MATCH THE PLANS.
REVIEW BEFORE STARTING THE WORK. THE WORK SCHEDULE SHALL BE PRESENTED IN
AND FOR REMOVING TRASH, RUBBISH AND DEBRIS SHALL BE SAFE METHODS WHICH WILL
BAR -CHART FORM, OR OTHER APPROVED METHOD.
NOT DAMAGE EXTERIOR FACE OF BUILDING, ENDANGER PERSONS OR DAMAGE PROPERTY.
5. PROVIDE
METAL FRAME FOR DOORS, FABRICATED WITH MITERED
CORNERS. FORM EXTERIOR
B.
CODES STANDARDS AND REGULATIONS
3.
THE CONTRACT WORK SCHEDULE SHALL BE BASED ON A NORMAL WORK WEEK. ;SHOULD
4.
UTILITIES: PROTECT EXISTING UTILITIES AND SERVICES, AS WELL AS OWNER'S SERVICE
FRAME
I S OF 16 GAUGE FOR 1-3/4" DOORS, FLUSH DOUBLE
/
RABBETED TYPE WITH 5 8"
f
THE CONTRACT WORK FAIL TO PROGRESS ACCORDING TO THE SCHEDULE AND IF, IN THE
SYSTEMS, WITHIN AND ADJACENT TO THE ALTERATION OPERATIONS, FROM DAMAGE ON
DEEP
STOPS IN 2" FACE. CORNERS TO BE WELDED. EXTERIOR
FRAMES SHALL BE
1.
M REGULATIONS.
CONFORM TO ALL APPLICABLE CODES AND GOVERNMENT REGUL
OPINION OF THE ARCHITECT -ENGINEER THE WORK CANNOT BE COMPLETED WITHIN THE
ACCOUNT OF SUCH OPERATIONS. IF UTILITIES OR SERVICES ARE UNCOVERED THAT ARE NOT
GALVANIZED. INTERIOR FRAMES SHALL BE 18 GAUGE WITH
-
KNOCK DOWN CONSTRUCTION.
CONTRACT TIME OR SUCH EXTENSIONS THEREOF AS MAY HAVE BEEN GRANTED, WORK
SHOWN ON THE DRAWINGS, ADVISE THE OWNER OR PROJECT SITE REPRESENTATIVE AND DO
2.
OBTAIN PERMITS AND PAY ALL FEES. ARRANGE FOR ALL REQUIRED INSPECTIONS AND
SUCH ADDITIONAL TIME OVER THE NORMAL WORK WEEK, INCLUDING SATURDAYS, SUNDAYS,
NOT WORK IN THE IMMEDIATE AREAS UNTIL INSTRUCTED TO DO SO. DISCONNECT, CAP AND
APPROVALS.
AND HOLIDAYS AS REQUIRED TO MEET THE SCHEDULED TIME FOR COMPLETION, WITHOUT
ABANDON EXISTING UTILITIES AND SERVICES EXPOSED AS A RESULT OF THE ALTERATION
6, FURNISH JAMB ANCHORS NOT LESS THAN 3 PER JAMB, AS',
REQUIRED TO SECURE FRAMES
ADDITIONAL COST TO THE OWNER,
OPERATIONS THAT ARE NOT REQUIRED TO REMAIN IN USE; REMOVE EXISTING SERVICES AS
TO ADJACENT CONSTRUCTION. FORMED OF NOT LESS THAN
18 GAUGE GALVANIZED STEEL.
3.
REVIEW FOR THE GENERAL BUILDING PERMIT WILL BE OBTAINED BY THE ARCHITECT. PERMIT
4,
OWNERS OPERATIONS OUTSIDE OF SPECIFIC PHASED AREAS IN WHICH WORK IS BEING
PART OF THE DEMOLITION WHERE SO INDICATED OR REQUIRED; RELOCATE EXISTING SERVICES
FEE IS BY THE CONTRACTOR:
PERFORMED, MUST BE MAINTAINED TO INSURE NORMAL OPERATIONS IN SUCH MAJOR PHASED
WHERE SO INDICATED OR REQUIRED:
7. EXCEPT ON WEATHER-STRIPPED FRAMES, DRILL STOPS TO
RECEIVE 3 SILENCERS ON JAMB
AREAS. IF CERTAIN WORK IS REQUIRED WITHIN A WORK AREA, AND CANNOT BE
5.
FLOORS: PROTECT THE FINISHED FLOORS WHICH ARE TO REMAIN, AND AREAS OVER WHICH
STRIKES OF FRAMES FOR SINGLE DOORS, 2 SILENCERS ON
HEADS OF FRAMES FOR PAIR OF
C.,
BASE EQUIPMENT, MATERIALS AND SUBSTITUTIONS
ACCOMPLISHED SO AS TO MAINTAIN THE FUNCTION OF OPERATIONS OUTSIDE SUCH AREA,
MATERIALS OR EQUIPMENT SHALL BE MOVED, TO PRESERVE THE CONDITION OF THE EXISTING
DOORS PROVIDE- GLYNN-JOHNSON GJ-64 SILENCERS FOR
FIELD APPLICATION AFTER
I
SUCH WORK WHEN DIRECTED BY THE OWNER OR PROJECT SITE REPRESENTATIVE SHALL BE
FLOOR. USE NOT LESS THAN 1/4 INCH THICK PLYWOOD OR FLAKEBOARD LAID OVER HEAVY
PAINTING.
1.
ALL PRODUCTS UTILIZED IN THIS CONSTRUCTION SHALL BE ASBESTOS FREE.
PERFORMED ON A PREMIUM TIME BASIS AFTER HOURS OF NORMAL USE BY SUCH NORMAL
DUTY KRAFT OR RED ROSIN PAPER WITH JOINTS LAPPED.
OPERATION. PREMIUM TIME WORK WILL BE CONSIDERED AS CHANGES IN THE WORK AND
6.
LIFTING PRECAUTIONS: WHENEVER MATERIALS OR EQUIPMENT NEED TO BE LIFTED OVER OR
%*Cvs
pharmacy"
RESET
STORE NUMBER 00944
453 STATION AVENUE
SOUTH YARMOUTH, MA 02664
CAP CODE: 00072
CS PROJECT NUMBER 163445
"*t
STARC K
ARCHITECTS
126 Cove Street
Fall River, MA 02720
1 Richmond Square, Suite 120C
Providence, RI 02903
MA 508.679.5733
RI 401.709.7799
STARCKARCH ITECTS.COM
CONSULTANT ENGINEER:
CONSULTANT:
SEAL
1 � ED ARC
cr 10
. 951251
n
J`o
GZ
Fq[rH OF MP`'$P
REVISIONS:
DRAWING/REVIEWED BY: PPY/MJT
CVS PROJECT MANAGER: SH
DATE: 08/08/2022
JOB NUMBER: 163445
TI TLE:
GENERAL NOTES
& SPECIFICATIONS
SHEET NUMBER:
G3
COMMENTS: