HomeMy WebLinkAbout453 Station Ave CVS plan 63. FIELD MEASUREMENTS: VERIFY FIELD MEASUREMENTS BEFORE FABRICATION TO ENSURE
PROPER FITTINGS. COORDINATE FABRICATION SCHEDULE WITH CONSTRUCTION PROGRESS TO AVOID
DELAYING THE WORK.
4. PROVIDE PANELS, RETAINERS, CHANNEL AND TUBE STYLE LEGS, METAL DECK, SWAY BARS,
SPACERS AND HARDWARE AS STANDARD WITH THE MANUFACTURER FOR THE OWNER FOR A
COMPLETE INSTALLATION.
j 5. INSTALL STEEL GONDOLAS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS, LEVEL,
PLUMB, TRUE, AND ALIGNED WITH ADJACENT MATERIALS. USE CONCEALED SHIMS WHERE
NECESSARY FOR ALIGNMENT.
A. INSTALL STEEL GONDOLAS PER FINAL MERCHANDISE PLAN,
B. INSTALL TO TOLERANCES AS REQUIRED BY THE MANUFACTURER.
i
6. COORDINATE STEEL GONDOLAS WITH MATERIALS AND SYSTEMS IN OR ADJACENT TO iT.
PROVIDE CUTOUTS FOR ELECTRICAL. ITEMS THAT PENETRATE WALL SYSTEM. REPLACE VISUAL
DISPLAY WALL THAT IS DAMAGED OR DOES NOT COMPLY WITH REQUIREMENTS. WALL SYSTEM MAY
BE REPAIRED OR REFINISHED 1F WORK COMPLIES WITH REQUIREMENTS AND SHOWS NO EVIDENCE OF
REPAIR OR REFINISHING. ADJUST JOINERY, FOR UNIFORM APPEARANCE. CLEAN STEEL GONDOLAS
ON EXPOSED AND SEMIEXPOSED SURFACES. TOUCH UP FACTORY -APPLIED FINISHES TO RESTORE
DAMAGED OR SOILED AREAS.
DIVISION 13 - SPECIAL CONSTRUCTION NOT USED
DIVISION 14 - CONVEYING SYSTEMS - NOT USED
DIVISION 22 - PLUMBING - REFER TO PLUMBING SHEETS
DIVISION 23 HEATING VENTILATION AND AIR CONDITIONING -...REFER TO MECHANICAL SHEETS
DIVISION 26 - ELECTRICAL - REFER TO ELECTRICAL SHEETS
SECTION 26.2416 - PANELBOARDS
A. CVS/PHARMACY HAS ENTERED INTO A NATIONAL ACCOUNT AGREEMENT WITH THE
MANUFACTURERS LISTED BELOW FOR FURNISHING THE ELECTRICAL SWITCHGEAR SPECIFIED IN
THIS SECTION.
1. WIEDENBACH BROWN CO., INC.; AT (781 769-9868 CVS
CVSSUPPORT@WBLIGHT,COM. ) ®WBLIGHT.COM OR
1.1, AREAS: AL, AR, AZ, CA,
INSTRUCTIONS FOR THE GENERAL CONTRACTOR
ENVIRONMENT OF CARE
THE ENVIRONMENT OF CARE INSTRUCTIONS IS INTENDED TO PROVIDE A CLEAN, SAFE WORKING
ENVIRONMENT WITHIN THE MINUTE CLINIC'S THROUGHOUT CONSTRUCTION PHASES OF THE
HEALTHHUB PROGRAM.
• NO WORK WITHIN THE HEALTHHUB PROGRAM SCOPE IS TO BE DONE INSIDE EXISTING,
OCCUPIED EXAM ROOMS DURING NORMAL OPERATIONAL HOURS, IF THE ROOMS ARE
UNOCCUPIED, PLEASE DISCUSS WITH THE HEALTHCARE SERVICE PROVIDER BEFORE UTILIZING
SAID SPACE DURING HOURS OF OPERATION.
THE FOLLOWING CONSTRUCTION PROCEDURES DURING THE HOURS OF OPERATION SHOULD BE
NOTED:
• DOORS TO CLINIC ROOMS CANNOT BE BLOCKED.
• ACCESS TO THE REGISTRATION KIOSK DESK CANNOT BE BLOCKED DURING OPERATING
HOURS.
• WAITING AREAS SHOULD BE DUSTED AND FREE FROM ANY DEBRIS. THESE DESIGNATED
AREAS MAY HAVE TO SHIFT LOCATIONS BASED ON CONSTRUCTION PRIORITIES.
• TO PREVENT AIRBORNE DUST FROM DISPERSING INTO PHARMACY AND RETAIL SPACES WITH
THE USE OF PLASTIC SHEETING OR OTHER DUST BARRIERS. IMPLEMENT BEFORE
CONSTRUCTION BEGINS.
• REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. OFF AND SEAL AIR VENTS. BLOCK
• SEAL UNUSED DOORS WITH DUCT TAPE TO HELP REDUCE DUST WITHIN THESE SPACES.
• PLACE TACKY MAT AT ENTRANCE AND EXIT OF WORK AREA AND CHANGE FREQUENTLY OR
WHEN INEFFECTIVE.
• ALL WORK SURFACES MUST BE WIPED DOWN WITH DISINFECTANT. FLOORS SHOULD BE
MOPPED OR VACUUMED AND FREE FROM DUST AND DEBRIS.
• CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. T
APE MAY BE USED TO ENSURE A TIGHT COVER.
• REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHEN WORK HAS BEEN COMPLETED.
COMMUNICATION
• PLEASE COMMUNICATE ANY ANTICIPATED LOSS OF ELECTRICAL POWER OR LOSS OF WATER
TO YOUR ASSIGNED MINUTECLINIC HEALTHCARE BUSINESS PARTNER, MINUTECLINIC SET-UP
COORDINATOR (IF PRESENT ON SITE OR MINUTE
CLINIC
NIC PROVIDER (WHEN PRESENT).. I
• ELECTRICAL POWER IS 100% REQUIRED FOR OUR CLINICS TO STAY OPEN.
• WE ARE ABLE TO STAY OPEN WITH LOSS OF WATER . HOWEVER , WE WILL NOT BE ABLE OFFER CERTAIN SERVICES THAT REQUIRE THE USE OF WATER , THEREFORE SHUT OFF TO
NOTICE IS NECESSARY TO ENSURE WE APPROPRIATELY REFER THESE SELECT PATIENTS TO
AN ALTERNATE SITE OF CARE.
• ANY LOUD NOISE NEAR OCCUPIED EXAM ROOMS NEEDS TO BE COMMUNICATED PRIOR TO THE
WORK BEGINNING AS EXTREME NOISE LEVELS MAY IMPACT THE PROVIDERS ABILITY TO
COMMUNICATE APPROPRIATELY TO THEIR PATIENT, AS WELL AS COMPLETE A THOROUGH
ASSESSMENT. THESE NOISE LEVELS COULD RESULT IN CLINIC CLOSURE, IF CONSTRUCTION IS
COMPLETED DURING REGULAR CLINIC HOURS.