HomeMy WebLinkAbout453 Station Ave CVS plan 63. FIELD MEASUREMENTS: VERIFY FIELD MEASUREMENTS BEFORE FABRICATION TO ENSURE PROPER FITTINGS. COORDINATE FABRICATION SCHEDULE WITH CONSTRUCTION PROGRESS TO AVOID DELAYING THE WORK. 4. PROVIDE PANELS, RETAINERS, CHANNEL AND TUBE STYLE LEGS, METAL DECK, SWAY BARS, SPACERS AND HARDWARE AS STANDARD WITH THE MANUFACTURER FOR THE OWNER FOR A COMPLETE INSTALLATION. j 5. INSTALL STEEL GONDOLAS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS, LEVEL, PLUMB, TRUE, AND ALIGNED WITH ADJACENT MATERIALS. USE CONCEALED SHIMS WHERE NECESSARY FOR ALIGNMENT. A. INSTALL STEEL GONDOLAS PER FINAL MERCHANDISE PLAN, B. INSTALL TO TOLERANCES AS REQUIRED BY THE MANUFACTURER. i 6. COORDINATE STEEL GONDOLAS WITH MATERIALS AND SYSTEMS IN OR ADJACENT TO iT. PROVIDE CUTOUTS FOR ELECTRICAL. ITEMS THAT PENETRATE WALL SYSTEM. REPLACE VISUAL DISPLAY WALL THAT IS DAMAGED OR DOES NOT COMPLY WITH REQUIREMENTS. WALL SYSTEM MAY BE REPAIRED OR REFINISHED 1F WORK COMPLIES WITH REQUIREMENTS AND SHOWS NO EVIDENCE OF REPAIR OR REFINISHING. ADJUST JOINERY, FOR UNIFORM APPEARANCE. CLEAN STEEL GONDOLAS ON EXPOSED AND SEMIEXPOSED SURFACES. TOUCH UP FACTORY -APPLIED FINISHES TO RESTORE DAMAGED OR SOILED AREAS. DIVISION 13 - SPECIAL CONSTRUCTION NOT USED DIVISION 14 - CONVEYING SYSTEMS - NOT USED DIVISION 22 - PLUMBING - REFER TO PLUMBING SHEETS DIVISION 23 HEATING VENTILATION AND AIR CONDITIONING -...REFER TO MECHANICAL SHEETS DIVISION 26 - ELECTRICAL - REFER TO ELECTRICAL SHEETS SECTION 26.2416 - PANELBOARDS A. CVS/PHARMACY HAS ENTERED INTO A NATIONAL ACCOUNT AGREEMENT WITH THE MANUFACTURERS LISTED BELOW FOR FURNISHING THE ELECTRICAL SWITCHGEAR SPECIFIED IN THIS SECTION. 1. WIEDENBACH BROWN CO., INC.; AT (781 769-9868 CVS CVSSUPPORT@WBLIGHT,COM. ) ®WBLIGHT.COM OR 1.1, AREAS: AL, AR, AZ, CA, INSTRUCTIONS FOR THE GENERAL CONTRACTOR ENVIRONMENT OF CARE THE ENVIRONMENT OF CARE INSTRUCTIONS IS INTENDED TO PROVIDE A CLEAN, SAFE WORKING ENVIRONMENT WITHIN THE MINUTE CLINIC'S THROUGHOUT CONSTRUCTION PHASES OF THE HEALTHHUB PROGRAM. • NO WORK WITHIN THE HEALTHHUB PROGRAM SCOPE IS TO BE DONE INSIDE EXISTING, OCCUPIED EXAM ROOMS DURING NORMAL OPERATIONAL HOURS, IF THE ROOMS ARE UNOCCUPIED, PLEASE DISCUSS WITH THE HEALTHCARE SERVICE PROVIDER BEFORE UTILIZING SAID SPACE DURING HOURS OF OPERATION. THE FOLLOWING CONSTRUCTION PROCEDURES DURING THE HOURS OF OPERATION SHOULD BE NOTED: • DOORS TO CLINIC ROOMS CANNOT BE BLOCKED. • ACCESS TO THE REGISTRATION KIOSK DESK CANNOT BE BLOCKED DURING OPERATING HOURS. • WAITING AREAS SHOULD BE DUSTED AND FREE FROM ANY DEBRIS. THESE DESIGNATED AREAS MAY HAVE TO SHIFT LOCATIONS BASED ON CONSTRUCTION PRIORITIES. • TO PREVENT AIRBORNE DUST FROM DISPERSING INTO PHARMACY AND RETAIL SPACES WITH THE USE OF PLASTIC SHEETING OR OTHER DUST BARRIERS. IMPLEMENT BEFORE CONSTRUCTION BEGINS. • REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. OFF AND SEAL AIR VENTS. BLOCK • SEAL UNUSED DOORS WITH DUCT TAPE TO HELP REDUCE DUST WITHIN THESE SPACES. • PLACE TACKY MAT AT ENTRANCE AND EXIT OF WORK AREA AND CHANGE FREQUENTLY OR WHEN INEFFECTIVE. • ALL WORK SURFACES MUST BE WIPED DOWN WITH DISINFECTANT. FLOORS SHOULD BE MOPPED OR VACUUMED AND FREE FROM DUST AND DEBRIS. • CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. T APE MAY BE USED TO ENSURE A TIGHT COVER. • REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHEN WORK HAS BEEN COMPLETED. COMMUNICATION • PLEASE COMMUNICATE ANY ANTICIPATED LOSS OF ELECTRICAL POWER OR LOSS OF WATER TO YOUR ASSIGNED MINUTECLINIC HEALTHCARE BUSINESS PARTNER, MINUTECLINIC SET-UP COORDINATOR (IF PRESENT ON SITE OR MINUTE CLINIC NIC PROVIDER (WHEN PRESENT).. I • ELECTRICAL POWER IS 100% REQUIRED FOR OUR CLINICS TO STAY OPEN. • WE ARE ABLE TO STAY OPEN WITH LOSS OF WATER . HOWEVER , WE WILL NOT BE ABLE OFFER CERTAIN SERVICES THAT REQUIRE THE USE OF WATER , THEREFORE SHUT OFF TO NOTICE IS NECESSARY TO ENSURE WE APPROPRIATELY REFER THESE SELECT PATIENTS TO AN ALTERNATE SITE OF CARE. • ANY LOUD NOISE NEAR OCCUPIED EXAM ROOMS NEEDS TO BE COMMUNICATED PRIOR TO THE WORK BEGINNING AS EXTREME NOISE LEVELS MAY IMPACT THE PROVIDERS ABILITY TO COMMUNICATE APPROPRIATELY TO THEIR PATIENT, AS WELL AS COMPLETE A THOROUGH ASSESSMENT. THESE NOISE LEVELS COULD RESULT IN CLINIC CLOSURE, IF CONSTRUCTION IS COMPLETED DURING REGULAR CLINIC HOURS.