HomeMy WebLinkAbout453 Station Ave CVS plan 9N
NOTES
1.
INSTALL NEW/RELOCATE POWER POLES.
REQUIRED TO FACILITATE CEILING GRID
REFERENCE ELECTRICAL DWGS.
MODIFICATIONS AND/OR RELOCATION OF
2.
EXISTING PERIMETER SIGNAGE TO BE
LIGHT FIXTURES. PROVIDE ADDITIONAL SHEET
CONSISTENT WITH CURRENT CVS
METAL, FLEX DUCT, HANGERS AND
STANDARDS. GC AND CVS CPM TO
ACCESSORIES AS REQUIRED TO RELOCATE
COORDINATE DEMO, RELOCATION, AND/OR
AIR TERMINAL DEVICES. HVAC AIR TERMINAL
RE -USE OF ALL EXISTING GRAPHICS,
DEVICES TO BE MODIFIED SHALL CONFORM
3.
RELOCATION OF EXISTING SECURITY
TO SMACNA STANDARDS. UPON PROJECT
CAMERAS, MOTION DETECTORS, AND
COMPLETION, AIR TERMINAL DEVICES AND
SECURITY EQUIPMENT BY CVS VENDOR. GC
MINIMUM 5' OF ASSOCIATED BRANCH
SHALL COORDINATE INSTALLATION WITH
DUCTWORK SHALL BE CLEANED FREE OF
VENDOR.
DUST AND DEBRIS. MODIFICATION TO
4.
REPLACE ANY STAINED OR DAMAGED
EXISTING VENTILATION AIR FLOW SHALL NOT
CEILING TILE THROUGHOUT ENTIRE STORE AS
BE PERMITTED.
DETERMINED DURING PRE -BID 9.
GC SHALL RELOCATE SPRINKLER HEADS AS
WALKTHROUGH.
REQUIRED TO FACILITATE CEILING GRID
5.
REPAIR OR REPLACE ANY DAMAGED OR
MODIFICATIONS AND/OR RELOCATION OF
INOPERABLE LIGHT FIXTURES AS REQUIRED.
LIGHT FIXTURES. PROVIDE ADDITIONAL
6.
RELO/INSTALL NEW AISLE MARKERS PER
PIPING, HANGERS, AND ACCESSORIES AS
CVS SET-UP MANAGER.
REQUIRED TO FACILITATE SPRINKLER PIPING
7.
CLEAN ALL EXISTING HVAC DIFFUSERS AND
MODIFICATIONS. FIRE PROTECTION SPRINKLER
LIGHT FIXTURE LENSES THROUGHOUT THE
SYSTEM MODIFICATIONS SHALL CONFORM TO
ENTIRE STORE,
NFPA 13 INSTALLATION AND OPERATION
8.
GENERAL CONTRACTOR SHALL COORDINATE
STANDARDS. FIRE SUPPRESSION SYSTEM
REVISED CEILING GRID AND LIGHTING
DRAWINGS SHALL BE PREPARED BY A
FIXTURE LOCATIONS WITH EXISTING CEILING
LICENSED FIRE PROTECTION CONTRACTOR AS
DIFFUSERS AND REGISTERS, GC SHALL
REQUIRED BY THE AUTHORITIES HAVING
RELOCATE DIFFUSERS AND REGISTERS AS
JURISDICTION,
LEGEND
EXISTING PARTITION TO REMAIN.7
T ,
GYPSUM WALLBOARD CEILING
EXISTING PARTITION TO BE
DEMOLISHED
L` J
TO BE DEMOLISHED
4) KEY NOTE DESIGNATION
_ _
ACOUSTICAL CEILING TILE AND
CEILING GRID TO BE DEMOLISHED
EXISTING ACOUSTICAL CEILING TILE
A
TO REMAIN
1 COLUMN GRID
FIXTURE DESIGNATIONS
E EXISTING TO REMAIN
D/R DEMOLISH
RE/ER RELOCATE
CEILING FIXTURE SCHEDULE
EXISTING/DEMO/NEW SYMBOL
DESCRIPTION
1
2x4 LIGHTS
STRIP LIGHTS
CBEE
EXIT SIGNS
DO
a D
09
EMERGENCY LIGHTS
i
`� J
��
MIRRORED CEILING PANEL
®
®
®
POWER POLE
O
4
OO
SPEAKER
SB
49
®
SECURITY CAMERA BUBBLE
r'1
f.1
(:1
SECURITY MOTION SENSOR
�® ceiling
® ceiling
ceiling
FIRE ALARM STROBE LIGHT/SOUNDER STROBE
1-TV 2-TV
1 TTV
1-TV 2-TV
C.C.T.V.
�(
�(
WIFI ROUTER
0
SPRINKLER HEAD
Vy®
HVAC SUPPLY
K1
LN
HVAC RETURN
zry
HVAC EXHAUST/TRANSFER GRILLE
®
®
R1
EXHAUST FAN
UH
UH
GAS FIRED UNIT HEATER
DEMOLITION CEILING NOTES BY SYMBOL (®)
1.
CLEAN EXISTING HVAC SUPPLY/RETURN
6.
DEMOLISH PORTION OF EXISTING CEILING
DIFFUSERS.
GRID, TILES, AND HANGERS AS SHOWN.
2.
G.C. SHALL PROVIDE DRAWINGS
7.
DEMOLISH EXISTING PARAWASH LIGHT
PREPARED BY A LICENSED FIRE
FIXTURES IN THEIR ENTIRETY.
PROTECTION CONTRACTOR TO THE CITY
FOR APPROVAL FOR ANY MODIFICATIONS
8.
DEMOLISH/REMOVE/RELOCATE EXISTING
TO THE EXISTING FIRE PROTECTION
EXIT SIGN AS SHOWN. RE: 1/A2.
SYSTEM.
9,
REPLACE EXISTING EGGCRATE TILES.
3.
G.C. SHALL COORDINATE FIRE ALARM
SYSTEM MODIFICATION WITH THE CVS
10.
FIX/REPLACE CEILING TILES. COORDINATE
VENDOR AND RELOCATE EXISTING
W/CVS PM.
STROBES AS REQUIRED.
11.
CLEAN EXISTING MIRRORED CEILING
4.
G.C. TO COORDINATE WITH CVS VENDOR
TILES.
FOR RELOCATION/REMOVAL OF SECURITY
EQUIPMENT: INCLUDING CAMERAS,
12.
REMOVE EXISTING POWER POLEs,
MOTION DETECTORS, SENSORS, AND
REPLACE CEILING TILES AS REQUIRED.
SECURITY BUBBLES
5.
REPLACE DAMAGED/STAINED CEILING
TILES THROUGHOUT RETAIL AREA (UP
TO 4 CASES = 32 TILES)
%*Cv
pharmacy "
RESET
STORE NUMBER- 00944
453 STATION AVENUE
SOUTH YARMOUTH, MA 02664
CAP CODE: 00072
CS PROJECT NUMBER. 163445
STARC K
ARCHITECTS
126 Cove Street
Fall River, MA 02720
1 Richmond Square, Suite 120C
Providence, RI 02903
MA 508.679.5733
RI 401.709.7799
STARCKARCHITECTS.COM
CONSULTANT ENGINEER:
CONSULTANT
SEAL:
F,ED ARC
S J I/ ,
4 2 �0
.951251
c�
0
J'
✓F94 N OF MPS`'PG
REVISIONS:
DRAWING/REVIEWED BY: PPY/MJT
CVS PROJECT MANAGER: SH
DATE: 08/08/2022
JOB NUMBER: 163445
TI TLE:
DEMOLITION
REFLECTED CEILING PLAN
SHEET NUMBER:
go
N
N
O
N
00
03
OVERALL DEMOLITION CEILING PLAN 10
SCALE: 1 /8" = V-0"
COMMENTS: