HomeMy WebLinkAboutBLD-23-000437 Solar affidavit b3 'IJ - 02-3 --60O937
VECTOR ' RECEIVED
E n s l n e e R s
DEC 22 2022
VSE Project Number:U3232.0609.221
I BUILDING DEPARTMENT
December 21,2022 By
My Generation Energy
100 Independence Drive,Suite 10
Hyannis MA,02601
REFERENCE: Barry Kellog Residence:32 Whipporwill Lane,Yarmouth,MA 02675
Solar Array Post Installation-Structural Review
To Whom It May Concern:
We have reviewed the design for the above-referenced site.
Based upon our review, it is our conclusion that the installation of solar panels on this existing roof occurred in accordance
with the structural requirements of the Massachusetts State Residential Code(780 CMR Chapter 51, 9th Edition(2015 IRC))
and our original requirements as stated in a letter dated:July 19,2022.Framing size and spacing has been verified to match the
size and spacing from our original review.No existing or new damage to any structural element was observed.Measures have
been taken to waterproof all roof penetrations.
This letter does not waive the installer of any responsibility for improper installation.
We hope this meets your needs. If you have any further questions regarding this matter, please call this office at your
convenience.
VECTOR STRUCTURAL ENGINEERING,LLC
WELLS L %*
HOLMES a
8 STRUCTURAL
No,54240
o
fir- ..--"
12/21/2022
Wells Holmes,S.E.
MA License: 54240-Expires:06/30/2024
Project Engineer
WLH/rsl
651 W.Galena Park Blvd.,Ste.101/Draper, UT 84020/T(801)990-1775/F(801)990-1776/www.vectorse.com