HomeMy WebLinkAboutSPR 52123 r Formal Review SITE PLAN REVIEW COMMENT SHEET Date: March 21, 2023 Map: 19 Lot: 20.1 Applicant: RJ Resorts Holdings LLC Location: 28 South Shore Drive, South Yarmouth Zone: R25/HMOD2 Persons Present: Kathy Williams Lance Walker Bosen Li Lt. Matt Bearse Damir Von Rohrbach Mark Grylls Amanda Lima Jay Gardiner Ally Faktor Luke White Colleen Mathews Project Summary Replace and reconfigure the existing pool and add a SPA; upgrade the deck finishes and landscape surrounding the pool area; and upgrade the existing pool equipment pump room. Add two(2) unisex restrooms and one (1) exterior shower. Replace the existing bar tent structure with a new Bar Pavilion. Enhance the entrance to the Resort and Cottages with upgraded landscape features. Reconfigure parking areas around the Cottages. Enhance landscape at the existing Porte Cochere area. Update some of the existing rooms to meet the minimum Mass 521 CMR-Architectural Access Board Requirements. Comments ��Buildin : Project is in the HMOD2. Proposed replacement of the pool does not appear to trigger relief from the ZBA, however Design Review and SP relief is likely necessary from the Planning Board. Signs will require permits. All work to comply with 780 CMR, 521 CMR including MGL Ch 140 Sec. 206. I/7Planninq: Process: In accordance with Zoning Bylaw Section 404.2, renovation, reconstruction or replacement of South Shore Drive motels in the HMOD2 is allowed by-right. However, that section also requires that motel architectural and site plans meet the Planning Board's mandatory Architectural & Site Design Standards (Design Standards) and the plans must be submitted to the Planning Board for review at a duly posted Public Hearing. It should be noted that the Design Standards apply to the entire site and existing buildings as it is not the intent of the Design Standards to allow a partial site compliance. As the entire site/buildings do not appear to fully comply with the Design Standards, a Special Permit from the Planning Board would be required, which could be held concurrent with the Design Review Public Hearing. Prior to the Planning Board Public Hearing, the applicant shall also meet with the Design Review Committee who will submit their recommendations/comments to the Planning Board. The applicant shall provide 13 copies of the required plans as outlined in the Design Review application form (Design Review Application and Special Permit Application provided at the meeting). All plans shall be to scale. Modifications to the interior of the building are not needed. No plans should be greater than 24x36. Special Permit fee is $200 plus $5/abutter for notification and actual cost to advertise. Staff will obtain the certified abutter list from the Assessor's office. Comments: 1. The proposed modifications to the Red Jacket Resort will be an enhancement to the existing resort with nice finishes and details being proposed. 2. Provide dimensions on reoriented parking by the Cottages and confirm adequate room to modify from angled parking to perpendicular parking. 3. Provide clear pedestrian access from modified parking south of the Cottages to the Cottages. With the fence located next to the parking, rather than the sidewalk and with in-lot tree islands, it is unclear how pedestrians would access the walkways into the Cottages. Consider having the sidewalk adjacent to the parking and fence behind, as is done on the west side of the Cottages. 4. Provide clear pedestrian connection from Cottages to the resort amenities, pool and beach areas (including the beach area across the street from the Cottages). • 5. Coordinate location of new trees with underground utilities (i.e. the eastern in-lot parking island south of the Cottages). 6. Are any handicap accessible parking spaces required for the Cottages? 7. Plantings to be native species per zoning bylaw section 301.9. Parking lot trees to be minimum 3"caliper. 8. Coordinate sign size with the Building Dept. Conservation: • Projects that disturb > 1 acre of land require a Stormwater Management Permit Application. • Areas within conservation jurisdiction require native plantings from the approved plant lists. • Mitigation calculations are the total difference in coverage from existing conditions to proposed in each jurisdictional zone (riverfront, flood zone, 50 ft and 100 ft buffers). These calculations must be shown on the plan and the 2:1 mitigation ratio for riverfront area and the 50' buffer must be met and are currently not shown. Design Review: Not present. The Design Review Authority for HMOD2 projects is the Planning Board. See Planning comments above. At. Engineering: • Based on the summary sheet, the disturbance is greater than an acre; triggering the stormwater management permit application as noted above. Drainage was not reviewed in detail at this time. • Existing drainage within the paved parking area appears to have been installed around 2010 and it is isolated leaching structures; suggest cleaning as noted on the drawings. Also, inspect and repair any damage to existing drainage. • An existing site plan in our records show the existing drainage near the bend appears to be connected with a 10" concrete pipe. • Provide pavement cross section detail for parking areas. • This property is scheduled to have sewer installed with an active project out to bid. The cottages' septic is in the rear where the plantings and walkways are proposed. Consider syncing this portion of the project �,,�(� after the wastewater installation. 1 Fire: Fire Department Access needed per 527 CMR 1 Ch. 18, no proposed outdoor cooking, Outdoor fire pits per manufacturer installations, 18.1.1.4 for engineered sweep analysis ealth: Pool and bar specs required. Pools and bar to be permitted through the Health Dept. aterial specs etc. required. c7/ All safety and health details to be submitted. (I.E. depth markings, emergency phone...) Full specs to be submitted on pool bar. Mechanical room details to be submitted for review and approval. Water: Conta Water Dept for site marking of pits. Read & Received by Applicant(s)