Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot Zone of Contribution: In_ Out_ Acreage Commercial: Residential: Street: j($ �-),✓5Z'h(a L✓) --- Village: <;.n,,,,�,,,,,t,L ,-} y p� Floor Plan: 't �� a Bedrooms: Owner: S 1,,1;,e re,,,-p6e// Il ovv,1, U.? Installer: I nn ,I, 0 Address: r`6 C 4„.t..„- 6, ,1 y ,11 Phone: Phone: - / ? x ? ;7 Builder: • Address: Engineer: ,). C_ C Phone: Phone: Sc;g , 7?3- c j 7 -79 1. Required#of copies received N E'` t. I NO 2. Date of soils exam and percolation test not older than 2 years I - / 3. 4-5 ft of naturally occurring pervious material, above water table -4. Foundation 2 ft above highpoint of road V H.P.: Fnd: Var.: / 5. Water line 10 ft from septic components Var.: I ✓ - 6. Benchmark indicated and shown-NGVD if near wetlands I 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: I I ✓ 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: ✓ 12. System meets all other setback requirements Var.: \` / 13. Uses adjustment for maximum high groundwater Var.: t/ 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: `/j 15. System not in top or subsoil(A,B horizons)or 5' removal r___i 1 16. Proposed contours are suitable I ', 17. System meets slope requirements-min. 1/8", '/"preferred / /4 _ 18. System meets breakout requirements PVC liner: Wall:/l1 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21. No garbage disposal 22. System adequately sized for its intended use I 23. Minimum 6"stone or compacted below tank and dbox I 1 124. Manhole covers within 6"of grade, pump chamber cover to grade T 25. Inspection port on plastic chambers/leach fieldI V 26. Electrical permit for pump chamber/Separate meter for duplexes ✓t/ 27. Pump system-2"line,weep hole,check valve, tee in dbox,pump size ;/ 28. Septic tank/pump chamber to be factory waterproofed I 29. Vent provided if leaching below 3 feet,under driveway/parking 30. Buoyancy calculations for lank/pump chamber '/ 1.../31. Engineer to inspect and I certify soils: „� wall: commercial: I ;/ 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic,groundwater ,� 34.Title V Application and permit fee, installer signature / 35. Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd I 37. Check area lots for groundwater/L P ndwater in Assessor's Ma I Plan reviewed by: " S ,96 d ' - co:o;