Loading...
HomeMy WebLinkAboutC4 Grading & Drainage Plan (8.9.23)YARMOUTH, STORMWATER LEACHING SETBACKS: 1.) AS LAID OUT ON THE PLANS, ALL SUBSURFACE LEACHING FACILITIES AND THE'M1' AND'M2' DRY WATER QUALITY SWALES SHALL MAINTAIN A MINIMUM 10' SEPARATION FROM ALL SEPTIC TANKS AND A MINIMUM 25' SEPARATION FROM ALL SEPTIC SOIL ABSORPTION SYSTEMS, PER TITLE 5 REQUIREMENTS FOR'LEACHING CATCH BASINS & DRYWELLS'. 2.) AS LAID OUT ON THE PLANS, ALL OTHER DRY WATER QUALITY SWALES WITHIN THE RESIDENTIAL LOTS SHALL MAINTAIN A MINIMUM 5' SEPARATION FROM ALL SEPTIC TANKS AND A MINIMUM 10' SEPARATION FROM ALL SEPTIC SOIL ABSORPTION SYSTEMS, PER TITLE 5 REQUIREMENTS FOR 'OTHER OPEN, SURFACE OR SUBSURFACE DRAINS WHICH DO NOT DISCHARGE TO SURFACE WATER SUPPLIES OR INTERCEPT SEASONAL HIGH GROUNDWATER'. 3.) ALL DRY WATER QUALITY SWALES AND ALL LEACHING FACILITIES SHALL MAINTAIN A MINIMUM 10' SETBACK DISTANCE FROM BUILDING FOUNDATIONS, PER THE REQUIREMENTS OF THE MASS. STORMWATER HANDBOOK. NOT TO SCALE PLAN BOOK 326 PAGE 22 ROUTE 6A 1895 S.H.L.O PLAN, SHEET 8 DEED BOOK 2776 PAGE 322 ASSESSORS' MAP 125 PARCEL 39 LEGEND - - 32 EXISTING CONTOUR 32 PROPOSED CONTOUR O X12.34 EXISTING SPOT GRADE / M1 DRY WATER QUALITY SWALE CONNECTED TO 24x5 PROPOSED SPOT GRADE VEGETATION TO BE CUT BACK WITHIN SIGHT EASEMENT STORMWATER MANAGEMENT SYSTEM. EXCESS FLOW - yy- WATER SERVICE LINE AREA AS REQUIRED TO ALLOW CLEAR AND CONTINUOUS CONTINUES TO LEACHING FACILITY /VEHICLE SIGHT DISTANCE FROM THE PROPOSED INTERSECTION. VIA (2) CATCH BASINS IN SWALE. -�- UNDERGROUND ELECTRIC SERVICE 0� � �� / BOTTOM OF SWALE=48.5 TEST HOLE / BORING LOCATION OUTLET RIM=50.0 ST SEPTIC TANK - /P OUTFALL PIPE (WITH SPLASH PAD)=50.5 (MIN.) 7 "\0 DB DISTRIBUTION BOX Top of Mass Highway Bound 28' X 14' STORMWATER LEACHING FACILITY: SAS SOIL ABSORPTION SYSTEM (2) 6'0 X 6' LEACH PITS, 14' ON CENTER Mass. Coord. System: Reserve RESERVED FOR FUTURE N: 2720847.75 WITH STONE AROUND AND UNDERNEATH / E: 1006864.30 INLET INVERT=46.8 Cob UTILITY POLE NAVD88 Datum: BOTTOM OF LEACHING=41.3 ® CATCH BASIN 4z Qa" EL=53.4± WOODEN GUARDRAILS (1) CDS 2015-4 PRE-TREATMENT UNIT 1cp FIRE HYDRANT RIM/ @ SLOPED AREA INLET T I INLET INVERT=50.8 ® DRAINAGE MANHOLE / s s Back of Berm - OUTLET INVERT=50.8 ■ CONCRETE BOUND, FOUND --- -- --- (1) MANHOLE -x-x- LIMIT OF WORK .-40 .09 TO HOCKA 0 D (CLTO CL)_ _ _ pave RIM=54.1 _ _ _ _ \ - - _ Dry INLET INVERTS=51.0 FENCE ( - -R0_ f)� - - \ \ _ OUTLET INVERT=50.9--�-o--� GUARDRAILS (--- / - - - - oT��� % (40' Wide- Sta e Highway) 351.06 _ x EDGE OF CLEARING - F,<D+-� -52- 430.06' C--7 ROOF RUNOFF DRYWELL - T -� - - IGHT E j /� .,/ x5 Q 97"O0' ` ` O OUTWARD REAC Edge pave _ 7' nt ��� J / /+ w 48x5 Q ```�H(CL o me 50 - CL)�Sa ,� /Veri ulloff 5 Q RESERVE 10 ° /�OVy / LOIN% 0 6o r" 5s T ----------------- 1 �/ _ ---� OT 7- / / / �o/ 12,680 SF± o \ I I i� OPB SPA6E / �� / ���, : Lj o� ► I w TOTAL AREA = 237 826 N± ( / / / ��o� /To s9 m o ' 'J \ WETLAND v45SF± I rj i / J -4.~ u l UPLAND = 237,2$\$F± I 1 CD 25' RIMC53C8H BASINS C \ �_-� OUTLET INVERT=51.3 � � `u�j I \\ I \ � I ` 60 _ 52 / SO 9 2 - s6 T I o s� I z c x ROOF RUNOFF DRYWELL (TYPICAL) \ I J I J n K CULTEC RECHARGER 330XLHD s w ' I I (2) UNITS IN SERIES (10.5' x 6.33') / �ET) I r, o w v I TOTAL OF (4) UNITS PER DWELLING x D X � IGH OINT 125 SF X STREll _ TP4 - / ---- h - / (D o I� f SF \'NSO' \� N\ ^/ 4 v w If WT 2 1, (2) CATCH BASINS W/ CASCADE GRATES w I RIM=52.2 / w 161� SF + OUTLET INVERT=49.7 OT%� L 1 / / err u�/ OT 0 56 o (1) MANHOLE u RIM=52.3 +/* 20,71.E ± SF± /� 0 IJ I INLET INVERTS=49.5 A m o 15,459 S+ I \ OUTLET INVERT=49.4 (1) CATCH BASIN G / V o RIM=54.0 � � LrI �p`NEgO 1 SLOPE EASM� --� � / OUTLET INVERT=51.5 OF �\ \ '�' /25' � 50 i / f - 1+00 +_ - O O - - w (1) MANHOLE '6 �,�\\Nk / �1 o �'o ---- U, - Q 11 / RIM=39.9 \�O� A3R2 y k50 i A __ "o ,L o INLET INVERT=37 2 i �s ��pFEL _ 1� u l m o 14, 0 F± I, / S4 DRY WATER OUTLET INVERT=37� 25' f �7 i 6� I j QUALITY SWALE S3 DRY WATER QUALITY SWALE D (1) MANHOLE 32 RIM=38.6 0 \ \ L4W / O ¢. SL P EASEMENT Oo I 15 INLET INVERTS=35.5 �- PINT / / l Ln / OUTLET INVERT=35.4 3a P "� (1) CDS 2015-4 PRE-TREATMENT UNI \ ^ + p❑ o I I so x % / aR RIM=38.4 6 1 hI TP12 J INLET INVERT=35.3 F TURE SEWER OUTLET INVERT=35. I I EASEMENT (2) CATCH BAST S O 3+82 c / I I I \� 0 1 RIM= \ OUTLET INVERT=35. Q2 \ \ �♦ I �0 / 33 / / l ) / /((� \ I I I M2 DRY WATER QUALITY SWALE CONNECTED TO 6 STORMWATER MANAGEMENT SYSTEM OAF \ of -� 5 / EXCESS FLOW CONTINUES TO LEACHING FACILITY \ o \ ` F9� /Et�l I / / / / / 1 14 \ \ I I I I I S VIA (2) CATCH BASINS IN SWALE.\ BOTTOM OF SWALE=33.0 \ �F� 40 O / / /TP5 CATCH BASIN OUTLET �Y=34..k \ \ Q OUTFALL PIPE (WITH SPLASH PAD)=35 WIN.) \ Q /�f� / / / / rr / 62 I I o I / S5 DRY WATER Q //\ / / / / / / / / / �/ / fix, . \ / / QUALITY SWALE WOODEN GUAR LS @ SLOPE E \ \ \\ \ '7O��y \ / 70' X 28' STORMWATER LEACHING FA Y: \ \ \ t - - SF (10) 6'0 X 6' LEACH PITS, 14' ON�ITER� �\ \ \ \ `-,24`1�J ± WITH STONE AROUND AND UNDER E Tii- \ \ \ \ \ + 46� S�>�5 �� / " / INLET INVERT=31.5 \ \ \ \\ \ `- / fur / � / 58 BOTTOM OF LEACHING=26.0 \ \ \ \ \ \ �� x x x /3Q q yes LIMI F�x ROOF RUNOFF DRYWELL (TYPICAL) \ \ z��x f 0 411 DWELLING CULTEC RECHARGER330XLHD /� \ \ \ \\ \ I�� / '� \ I 11 FOFEL=650 (2) UNITS IN SERIES (10.5' x 6.33') / 1 \ - / � 1 4RQ DWELLING TOTAL OF (4) UNITS PER DWELLING / I \ - - � I FE TO LOT I i l / -65.0+ E I LE E ET N STREET _ LO_ / / / I (40' Town Way) -68 If x_x72 TO 60 N WN pF Y Rp,10 UTHWATER EASEs4` s2 So MENT - r z o0 CS ID m l 1 Q2 Back of Berm f Pavement Edge o Back of B� - 40 r\ 3$ \ S1 DRY WATER QUALITY SWALE S2 DRY WATER QUALITY SWALE (2) CATCH BASINS W/ CASCADE GRATES RI M=43.6 OUTLET INVERT=41.1 (1) MANHOLE RIM=43.8 INLET INVERTS=40.9 OUTLET INVERT=40.8 � ELECTRICAL E ZASEMENT so' WIDE 1?o • ��IN 10 - 1 _ loe r e ated Wetland Edge of Ve6 Wetlands Layer ` ,dam (Per Mass GIS DEP ♦ Ali, �#2936C 200.21' 0 50 100 150 SCALE 1" = 50' G:\AAJobs\THE DAVENPORT COMPANY -ROUTE 6A-YARMOUTHPORT\DWG\Definitive Site PIans.dwg w 00 �o N IW Top of Concrete Bound Mass. Coord. System: N: 2720127.39 E: 1007783.51 NAVD88 Datum: EL=29.1± ___4VC B, FND C4 THE DAVENPORT COMPANIES 20 NORTH MAIN STREET, YARMOUTH, MA GRADING & DRAINAGE PLAN LOT 2- ROUTE 6A- YARMOUTH-PORT, MA o� �� J.M. OTEILLY & ASSOCIATES, INC. �OQ�� Professional Engineering & Land Surveying Services 1573 Main Street - Route 6A P.O. Box 1773 (508)896-6601 Office Brewster, MA 02631 (508)896-6602 Fax DATE: SCALE: BY: CHECK: JOB NUMBER: 8/9/2023 As Noted RFR JMO JMO-8807