HomeMy WebLinkAboutErosion & Sediment Control Plan (8.9.23)YARMOUTH, STORMWATER MANAGEMENT NOTES 1.) THIS STORMWATER MANAGEMENT/ EROSION CONTROL PLAN IS ACCOMPANIED BY A STORMWATER MANAGEMENT REPORT AS WELL AS A STORMWATER OPERATION & MAINTENANCE MANUAL. THE REPORT DESCRIBES THE PROPOSED STORMWATER SYSTEMS IN DETAIL AND DOCUMENTS COMPLIANCE WITH MASS DEP AND TOWN OF YARMOUTH STORMWATER STANDARDS. 2.) PRE -DEVELOPMENT AND POST -DEVELOPMENT WATERSHED DELINEATIONS ARE SHOWN ON THE PLANS TITLED VA PRE -DEVELOPMENT WATER SHAD PLAN' AND'C7.2 POST -DEVELOPMENT WATERSHED PLAN'. A COPY OF THE PLAN HAS ALSO BEEN INCLUDED WITH THE CONSERVATION STORMWATER FILING. 3.) ADDITIONAL STORMWATER & EROSION CONTROL INFORMATION IS INCLUDED ON THE FOLLOWING PLANS WHICH WERE ALSO SUBMITTED AS PART OF THE DEFINITIVE SUBDIVISION APPLICATION WITH THE PLANNING BOARD:'C1 EXISTING CONDITIONS PLAN','C2 SITE LAYOUT PLAN','C4 GRADING & DRAINAGE PLAN','C5 DETAILS & NOTES', &'C9 LANDSCAPE PLAN'. A COPY OF EACH OF THESE PLANS HAVE ALSO BEEN INCLUDED WITH THE CONSERVATION STORMWATER FILING. 4.) SEE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) DOCUMENT FOR CONSTRUCTION PERIOD STORMWATER CONTROLS AND SPECIFICATIONS. CONTRACTOR SHALL REVIEW AND COMPLY WITH ALL MANAGEMENT PRACTICES DETAILED IN THE SWPPP THROUGHOUT THE CONSTRUCTION PROCESS. 5.) ALL STORMWATER SYSTEMS HAVE BEEN DESIGNED TO REDUCE THE SITE -WIDE POST -DEVELOPMENT PEAK DISCHARGE RATE RELATIVE TO PRE -DEVELOPMENT CONDITIONS. SEE STORMWATER MANAGEMENT REPORT FOR DOCUMENTATION. 6.) THE (2) MAIN STORMWATER COLLECTION SYSTEMS FOR FAITH ROAD AND MIRACLE WAY CONSIST OF CATCH BASIN / MANHOLE NETWORKS PIPED PROPRIETARY PRE-TREATMENT UNITS, WHICH THEN OUTLET INTO DRY WATER QUALITY SWALES, WHICH THEN OUTLET INTO SUBSURFACE LEACHING FACILITIES. THERE ARE ALSO (5) SECONDARY STORMWATER SYSTEMS WHICH SERVE DRIVEWAY AND LAWN AREAS THAT PITCH AWAY FROM THE ROADWAY, CONSISTING OF DRY WATER QUALITY SWALES SIZED TO RETAIN ALL RUNOFF FLOW FROM THE 100 YEAR STORM EVENT. SEE STORMWATER MANAGEMENT REPORT, AND'C4 GRADING & DRAINAGE PLAN' FOR FURTHER DETAILS. 7.) ALL ROOF RUNOFF SHALL BE CONTROLLED BY GUTTERS, DOWNSPOUTS AND DRYWELLS. DRYWELLS SHALL CONSIST OF A TOTAL OF (2) CULTEC 330XL RECHARGER UNITS AND SURROUNDING STONE FOR EACH DWELLING. �\ M z 00 -n V) Back Berm p2 Ed1je of Pavement Back of B� — 40 3$ POTENTIAL MATERIAL STOCKPILE AREA SEE EROSION CONTROL NOTE 6 FILTER FABRIC SILT BARRIER FOR EACH CATCH BASIN SEE EROSION CONTROL NOTE 4 FILTER FABRIC SILT BARRIER FOR EACH CATCH BASIN SEE EROSION CONTROL NOTE 4 PO O�j \ 4z Qa / a z EROSION CONTROL NOTES: 1.) LIMIT OF WORK SHALL BE MADE UP OF A 9" DIAMETER STRAW WATTLE INSTALLED PER THE MANUFACTURERS SPECIFICATIONS. LIMIT OF WORK LOCATION SHOWN ON PLANS. 2.) CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING EROSION/ RUNOFF DURING CONSTRUCTION. 3.) LIMIT OF WORK SHALL BE INSTALLED PRIOR TO START OF WORK, AND SHALL BE MAINTAINED IN PLACE FOR THE ENTIRETY OF CONSTRUCTION ACTIVITIES ON SITE, UNTIL ALL DISTURBED AREAS HAVE BEEN REVEGETATED AND/OR STABILIZED. 4.) ALL PROPOSED CATCH BASIN RIMS SHALL HAVE FILTER FABRIC INSTALLED UNDER THE RIM AFTER INSTALLATION UNTIL CONSTRUCTION ACTIVITIES ARE COMPLETE. FILTER FABRIC SHALL BE CLEANED OF ANY SEDIMENT AS NEEDED. SEDIMENT MUST BE REMOVED FROM THE AREA OF THE STRAW WATTLE BARRIER IF IT HAS ACCUMULATED TO Y2 OF THE ABOVE GROUND HEIGHT. 5.) ALL PROPOSED STORMWATER SUBSURFACE LEACHING FACILITIES SHALL BE SURROUNDED BY STRAW WATTLES TO PROTECT THE AREA FROM EROSION AND/OR SOIL ACCRETION UNTIL CONSTRUCTION ACTIVITIES ARE COMPLETE. 6.) MATERIAL STOCKPILES SHALL BE LOCATED WITHIN LIMIT OF WORK AND SHALL BE PHYSICALLY SEPARATED FROM CONTACT WITH STORMWATER THROUGH THE USE OF STRAW WATTLES. STOCKPILES SHALL BE COVERED OR STABILIZED AS NECESSARY TO PROTECT AGAINST EROSION AND DUST GENERATION. SEE PLAN FOR POTENTIAL STOCKPILE LOCATIONS. 7.) CONTRACTOR SHALL INSPECT THE LIMIT OF WORK DAILY AND IMMEDIATELY REPAIR ANY DAMAGED SECTIONS ON THE STRAW WATTLE CONTRACTOR SHALL KEEP A MINIMUM OF 100' OF EXTRA STRAW WATTLE ON SITE TO ALLOW FOR QUICK REPAIR OF ANY NOT TO SCALE DAMAGED SECTIONS. PLAN BOOK 326 PAGE 22 !aBack of Berm - / ROIJ E 6A / (40' Wide- Sta e Highway) 351.06 �— — � / / // x 48x5 5 � 54 / / 56 x h� 0T_ 7 +I \ OPEN SPACELU C� TOTAL AREA 37,826 SF± / / ° �� / \ o WETLAND = 45 SF± UPLAND = 237 SF±\ / � Ln li oXo �� \ + / lzB 4 §F— I /V i f / OT 12 / LT 1 20,711 SF± 1,757 SF± �o 15, \ iG o ROUTE 6A 1895 S.H.L.O PLAN, SHEET 8 DEED BOOK 2776 PAGE 322 ASSESSORS' MAP 125 PARCEL 39 LEGEND EXISTING CONTOUR 32 PROPOSED CONTOUR X12.34 EXISTING SPOT GRADE 24x5 PROPOSED SPOT GRADE — W— WATER SERVICE LINE —E— UNDERGROUND ELECTRIC SERVICE IP TEST HOLE / BORING LOCATION ST SEPTIC TANK DB DISTRIBUTION BOX SAS SOIL ABSORPTION SYSTEM Reserve RESERVED FOR FUTURE Cob UTILITY POLE FILTER FABRIC SILT BARRIER ® CATCH BASIN FOR EACH CATCH BASIN FIRE HYDRANT SEE EROSION CONTROL NOTE 4 ® DRAINAGE MANHOLE CONSTRUCTION ENTRANCE ■ CONCRETE BOUND, FOUND AGGREGATE APRON —x—x— LIMIT OF WORK P ed 50' x 20' x 6" (MINIMUM) FENCE rive SEE APRON DETAIL GUARDRAILS \--�-o--� \^� EDGE OF CLEARING E--7 ROOF RUNOFF DRYWELL 97.001 Edge 0 Pavemen— / aved Sa / - t Pulloff 6o a e � Drw sa LO L \1 POTENTIAL MATERIAL STOCKPILE AREAS / X SEE EROSION CONTROL NOTE 6 56 � X O �I o C � — AID Lu O �* FILTER FABRIC SILT BARRIER M D s° FOR EACH CATCH BASIN OT-1 IX71 SEE EROSION CONTROL NOTE 4 _ �Q W3 1 25 SFUj JQ U - �� z� CX:Qo J X - 56 I 6,1 S F+� X 1 60 I LO x / 5 x / o ( m / - 14,070 F±,� / h° h�O P / / h jr I-- as POTENTIAL MATERIAL STOCKPILE AREA / SEE EROSION CONTROL NOTE 6 x S / / P � m CO 62 I�� I I I I 40 X \I I I I X W S° \\ �\ �l } l / 0 SQ \ \ \ -n 244 ± a ING / / / / / s6 \ \ \\ \ / �C7� ` / X ` 58 \ \ \ I 6 } \ \ \ OR X o B XyX R D ELLIOG I \ \ I + L T 6 i / / TOF EL_ELLI — bS _ 5 7SF± I N STREET 0/ \ \ � � / / / EILE LO 6N \ \ 1 / / / I I \ 4$ (40' Town Way) 6 - 68 0 / X X 72If 60 a TOWN pF Rp,10 THWATER EASEMENT SQ s� so r� — � ELECTRICAL E ZASEMENT so' WIDE 1352° - - — - 1 / to ated Wetland / Edge Of IS DEP Wetlands Layeri ` / / L (Per Mass IS ,III, AL 'I' ` APRON DETAIL STRAW WATTLE/EROSION CONTROL DETAIL NOT TO SCALE Fill 3" Height FLOW DIRECTION �#2936C Wood Stake -Straw Wattle Existing Grade NOT TO SCALE ROUTE 6A 30' MIN. — M ,I-- 20' MIN. ACCESS TO CONSTRUCTION SITE EDGE OF PAVEMENT AGGREGATE APRON SHALL BE A MINIMUM 6" THICK LAYER OF 1"-3" WASHED STONE. STONE SHALL BE UNDERLAIN BY FILTER FABRIC. MINIMUM DIMENSIONS AS SHOWN. 200.21' 0 50 100 150 SCALE 1" = 50' G:\AAJobs\THE DAVENPORT COMPANY -ROUTE 6A-YARMOUTHPORT\DWG\Erosion-Sediment Control Plan.dwg THE DAVENPORT COMPANIES 20 NORTH MAIN STREET, YARMOUTH, MA EROSION & SEDIMENT CONTROL PLAN LOT 2- ROUTE 6A- YARMOUTH-PORT, MA o� �� J.M. OTEILLY & ASSOCIATES, INC. �OQ�� Professional Engineering & Land Surveying Services 1573 Main Street - Route 6A P.O. Box 1773 (508)896-6601 Office Brewster, MA 02631 (508)896-6602 Fax DATE: SCALE: BY: THCK: JOB NUMBER: 8/9/2023 As Noted RFRO JMO-8807