HomeMy WebLinkAboutReview Checklist TOWN OF YARf 1OUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Lot ‘;-Ora Zone of Contribution: In Out Acreage
" i Commercial: Residential: _.
Street: .G VP- LVutidz IZ d ----
Village: e
17/1.- ,,*-/'t- Floor Plan: At
Bedrooms:
Owner: ,n rf_ LA I(4'h, Installer: j -/.
��' -. l�- ��=�j�:
Address: `�
,7l 6,,c,,w- 13 r-,4: led Phone: c c
Phone: �6 _ 35L/- 7Tic f % c�35ci
Builder: AIL /
Address: A c4 p1r� 5'i{f,r•j Engineer: '� d 17tLc ,/
`� ��L� Gc:/ie �t�,L
Phone: Ste$ = -7 7/- woo J Phone: _��,�
N/A YES NO
1. Required#of copies received
2. Date of soils exam and percolation test not older than 2 years -
3. 4-5 ft of naturally occurring pervious material, above water table Vr - -
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: , ---�
5. Water line 10 ft from septic components Var.: _
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.: 'r
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: I
I
9. Leaching minimum 100 ft from wetlands '�
10. Leaching Var'
minimum 150 ft from drinking we11/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.: "--
12. System meets all other setback requirements Var.: ,7
13. Uses adjustment for maximum high groundwater Var.: i-
14. Leaching set 4-5 ft above ad . water or bottom of test
15. System not in top or subsoil (A.Bhorizons)or 5' removal hole Var.. v
16. Proposed contours are suitable
17. System meets slope requirements- min. 1/8", 1/"preferred
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21. No oarba�e dis.osal �
22. System ade uately sized for its intended use
23: Minimum 6"stone or compacted below tank and dbox
24. Manhole covers within 6"of grade, pump chamber cover to grade I j
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2"line,weep hole,check valve, tee in dbox, pump size
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parkina t/
30. Buoyancy calculations for-tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic, groundwater
34.Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow:
37. Check area lots for groundwater,Label groundwater in Assessor's Map gpd
-
i
Plan reviewed by: . /'-- ,Rua) _
co:o;