Loading...
HomeMy WebLinkAboutEngineer Plan, , ODa1 >,� o6g Map 58 Parcel 355 See Note #19 e ��� / w / TP #1 \W *Perc #1 \ �48 \ c j �House #21 �Z 1 Top Fnd \ \ 3 Bedroom TBM EL = 50.0 \ \\ \\ TOF El = 50.Ot \\ // 7 / ST 0- Map 58 p.. /\ Parcel 357 \\ \\ S#19 ote� \ 20 \\yyi p, Gazebo <1 Deck Yarmouth Health Department ROVED N � Date Lot 47 9,357f SF 1 Shed NOTE: / \ LOCATION OF UTILITIES IS APPROXIMATE AND ALL UNDERGROUND AND OVERHEAD UTILITIES MUST BE Ma 58 DETERMINED IN THE FIELD PRIOR TO COMMENCEMENT P OF ANY WORK, THIS INCLUDES, BUT NOT LIMITED TO, Parcel 348 REQUESTS TO DIGSAFE, ANY PRIVATE UTILITY COMPANIES AND THE LOCAL WATER DEPARTMENT. ck L97 Map 58 Parcel 349 Living Bed #3 Dinin Bed #2 Be Bth !Bth Kitchen Famil Map 58 Parcel 350 21 RECEIVED AUG 14 2023 HEALTH DEPT. 1st Floor Plan NOT TO SCALE SITE LOCUS NOT TO SCALE 1.) Assessor's Map 58 Parcel 356 2. D982799 3. LC PL 30561—B Sht 1 Lot 47 4.) This property is not in Zone II 5.) This property is in Flood Zone X Firm Map 25001CO587J Proposed Septic Plan Beaver Brook+'South Yarmouth Prepared for: Linda Villani 21 Beaver Brook West Yarmouth, MA w Road 02673 Prepared by: NNI All Cape Septic and Survey 618 Route 28 Vest Yarmouth, MA 02673 (508) 771-4200 alicapeseptic®gmoil.com June 16, 2023 jShe6t 1 of 2 By. MA Check: SM L Dwg. #584 GRAPHIC SCALE ( IN FEET ) 1 inch = 20 ft. TOP OF FOUNDATION EL=50.03 CONSTRUCTION NOTES 1.) ALL WORK SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE, TITLE 5 (310 CMR 15.000} STANDARD REQUIREMENTS FOR THE SITING, CONSTRUCTION, INSPECTION, UPGRADE, AND EXPANSION OF ON -SITE SEWAGE TREATMENT AND DISPOSAL SYSTEMS AND FOR THE TRANSPORT AND DISPOSAL OF SEPTAGE, AND THE LOCAL BOARD OF HEALTH REGULATIONS. 2.) ANY SEPTIC SYSTEM COMPONENT INSTALLED IN A LOCATION WHERE THERE IS POTENTIAL FOR VEHICLES OR HEAVY EQUIPMENT TO PASS OVER IT SHALL BE DESIGNED TO WITHSTAND AN H-20 LOADING. IF UNDER AN IMPERVIOUS SURFACE, SYSTEM SHALL BE VENTED TO THE ATMOSPHERE. 3.) TO MINIMIZE UNEVEN SETTLING, SEPTIC TANKS AND D-BOX SHALL BE INSTALLED ON A STABLE MECHANICALLY -COMPACTED BASE ON SIX INCHES OF CRUSHED STONE. 4.) COVERS OVER THE INLET AND OUTLET TEES OF THE SEPTIC TANK, THE DISTRIBUTION BOX, AND THE SOIL ABSORPTION SYSTEM SHALL BE RAISED TO WITHIN 6' OF FINAL GRADE. LEACHING FIELDS, TRENCHES, AND OTHER SOIL ABSORPTION SYSTEMS WITHOUT ACCESS MANHOLES SHALL HAVE AT LEAST ONE (1) INSPECTION PORT CONSISTING OF PERFORATED 4' PVC PIPE PLACED VERTICALLY TO THE BOTTOM OF THE SOL ABSORPTION SYSTEM WITH A CAP, TIED PATH MAGNETIC MARKING TAPE, ACCESSIBLE TO WITHIN 3' OF FINAL GRADE. 5.) PIPING SHALL CONSIST OF 4' SCHEDULE 40 PVC OR EQUIVALENT. PIPE SHALL BE LAID ON A MINIMUM CONTINUOUS GRADE OF NOT LESS THAN 2X FROM THE BUILDING TO THE SEPTIC TANK, AND NOT LESS THAN 1% OTHERWISE. 6.) DISTRIBUTION LINES FOR THE SOIL ABSORPTION SYSTEM SHALL BE 4' DIAMETER SCHEDULE 40 PVC (OR EQUIVALENT) LAID AT 0.OD5 FT/FT. UNLESS OTHERWSE NOTED. LINES SHALL BE CAPPED AT END OR AS NOTED. 7.) LINES FROM THE DISTRIBUTION BOX TO BE LEVEL FOR THE FIRST TWO (2) FEET BEFORE PITCHING TO THE SOIL ABSORPTION SYSTEM. DISTRIBUTION BOX SHALL BE WATER TESTED TO ASSURE EVEN DISTRIBUTION. 8.) GROUT TO BE USED AT ALL POINTS WHERE PIPES ENTER OR LEAVE ALL CONCRETE STRUCTURES IN ORDER TO PROVIDE A WATERTIGHT SEAL 9.) HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO OPERATE OVER THE LIMITS OF THE SEWAGE DISPOSAL FIELD DURING THE COURSE OF CONSTRUCTION OF THE SYSTEM. 10.) IN ACCORDANCE WITH 310 CMR 15.221, ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC MARKING TAPE. 11.) THERE ARE NO KNOWN WALLS OR WETLANDS WITHIN 150' OF THE PROPOSED SOIL ABSORPTION SYSTEM. 12.) FROM THE DATE OF THE INSTALLATION OF THE SOIL ABSORPTION SYSTEM UNTIL RECEIPT OF THE CERTIFICATE OF COMPLIANCE, THE PERIMETER SHALL BE STAKED AND FLAGGED TO PREVENT USE OF THE AREA THAT MAY CAUSE DAMAGE TO THE SYSTEM. 13.) THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UNLESS CONSTRUCTED AS SHOWN ON PLAN. ANY CHANGES SHALL BE APPROVED IN WRITING BY THE ENGINEER. 14.) THE BOARD OF HEALTH REQUIRES INSPECTION OF ALL CONSTRUCTION BY AN AGENT OF THE BOARD OF HEALTH AND THE DESIGNER. THE DESIGNER SHALL CERTIFY IN WRITING THAT THE SEWAGE DISPOSAL SYSTEM WAS INSTALLED IN ACCORDANCE WITH THE TERMS OF THE PERMIT AND THE APPROVED PLANS 48 HOURS ADVANCE NOTICE IS REQUESTED. 15.) LOCATION OF UTILITIES IS APPROXIMATE AND CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE LOCATION OF ALL UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF ANY WORK. THIS INCLUDES, BUT IS NOT LIMITED M. REQUESTS TO DIGSAFE. ANY PRIVATE UTILITY COMPANIES, AND THE LOCAL WATER DEPARTMENT. 16.) CONTRACTOR SHALL VERIFY THAT ALL WASTEUNES ARE CONNECTED BY WATER TESTING WITHIN THE DWELLING PRIOR TO INSTALLATION OF ANY SEPTIC COMPONENTS 17.) CONTRACTOR SHALL VERIFY EXISTING INVERT ELEVATIONS PRIOR TO INSTALLATION OF ANY SEPTIC SYSTEM COMPONENTS 18.) TEST HOLES COMPLETED PER STATE ENVIRONMENTAL CODE, TITLE 5. SOILS CAN BE VARIABLE AND TEST HOLE DATA IS NO GUARANTEE OF SOIL CONDITIONS IN OTHER AREAS. IF SONS DIFFER FROM THOSE SHOWN IN THE SOILS LOGS, DESIGN ENGINEER IS TO INSPECT THE SOILS PRIOR TO PROCEEDING WITH INSTALLATION OF ANY SEPTIC COMPONENTS. 19.) EXISTING SEPTIC COMPONENTS TO BE LOCATED, PUMPED DRY, FILLED PATH CLEAN SAND AND ABANDONED IN PLACE OR REMOVED AS REQUIRED. AREA TO BE COMPACTED TO MINIMIZE SETTLING. COVER Min. 9' Cover Install Tee E GEOTEXTILE FABRIC 3 46.0t 01 /(IN PLACE OF 1/4'-1/2' PEASTONE) I 46.25 45.67 45.3 - 45.5 7 x 3/4" - 1-1/2' Stone >r >,w�` GAS B Note j3 OB-3 H-20 � A of '� Double Wash x D-BOX 43.3 1 1,500 GALLON I t 5f I THREE (3) 500 GALLON PRECAST SEPTIC TANK I IV* -+ CONCRETE LEACH CHAMBERS WITH 4' OF STONE ON ENDS AND 2' ON SIDES 5.5' FLOW PROFILE RECEIVED LEA (E CHAMBERS NOT TO SCALE AUG 14 2023 BOTTOM OBSERVATION HOLE ELEV = 37.8 BATH DEPT. Test Hole 1 (EL=49.Ot) ILA I HULL LUU7 3 Depth Elev. Layer Soil Class Soil Color 0"-15" 47.7 Fill 15"-34" 46.2 B Loamy Sand 1OYR4/4 34"-135" 37.8 C Medium Fine Sand 1OYR6/4 DATE OF TESTING: 5/31/23 SOIL EVALUATOR: MARK POLSELLI WITNESS: JAY GARDINER, YARMOUTH HEALTH AGENT PERCOLATION RATE: LESS THAN < 2 MIN ANCH 0 52" NO GROUNDWATER ENCOUNTERED NO MOTTLING ENCOUNTERED SYSTEM DESIGN CALCULATIONS SEWAGE DESIGN FLOW REQUIRED: EXISTING 3 BEDROOM DWELLING 110 GPD / BEDROOM = 330 GPD REQUIRED SEWAGE DESIGN FLOW PROVIDED: THREE (3) 500 GALLON CHAMBERS WITH 4' STONE ON THE ENDS AND 2' STONE ON THE SIDES Vt = [(33.5 x 8.83) + 2(33.5 + 8.83) (2) x .74 = 344 GPD PROVIDED 344 GPD PROVIDED > 330 GPD REQUIRED SEPTIC TANK CAPACITY PROVIDED: EXISTING 1500 GALLON SEPTIC TANK A GARBAGE DISPOSAL IS NOT PERMITTED WITH THIS DESIGN FLOW Proposed Septic Plan 21 Beaver Brook Road West Yarmouth, MA Prepared for: Linda Villani 21 Beaver Brook Road West Yarmouth, MA Prepared by. All Cape Septic and Survey 618 Route 28 West Yarmouth, MA 02673 (508) 771-4200 ollcopeseptic@gmaii.com Date: 06/16/23 Sheet 2 of 2 Project No. AC-511-2